Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "FAQ 18-01, Definition of Initial Transient". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • 05000266/FIN-2012004-09  + (FAILURE TO PERFORM ADEQUATE EVALUATIONS TO ENSURE COMPLIANCE WITH 10 CFR 72.212(b)(6) AND 10 CFR 72.122(b)(2)(i))
  • 05000272/LER-2002-009  + (FAILURE TO PERFORM REQUIRED ACTION OF TECHNICAL SPECIFICATION 3.1.3.2.1.)
  • 05000266/FIN-2006004-04  + (FAILURE TO UPDATE AND MAINTAIN THE FSAR AS REQUIRED BY 10 CFR 50.71(e))
  • ML120260440  + (FAQ - NFPA 805 Monitoring)
  • ML16118A086  + (FAQ 10-0059 - NFPA 805 Monitoring Program, Screening Criteria, Action Levels, and Definitions of Compartments)
  • ML120260370  + (FAQ 10-0059 Rev. 3 for NRC Review)
  • ML18040B174  + (FAQ 14-0007: Transient Fire Frequency Likelihood - Draft)
  • ML16118A085  + (FAQ 14-0071 - Acceptable Uses for Non IEEE 383 Cables)
  • ML17258A686  + (FAQ 16-0010 Alt Method Ign Freq Weighting-Final Rev B 08302017)
  • ML18074A021  + (FAQ 16-0011 Cable Tray Ignition r3 011718)
  • ML17129A042  + (FAQ 16-02, Watts Bar 2 Baseline Planned UA and CCF (Final))
  • ML17125A070  + (FAQ 16-04)
  • ML18075A071  + (FAQ 17-0013 Close Out Memorandum)
  • ML17207A096  + (FAQ 17-01: Grand Gulf June 2016 Power Change (Final NRC Response))
  • ML17207A100  + (FAQ 17-02: Palo Verde Unit 3 Scram (Final NRC Response))
  • ML18045A038  + (FAQ 17-04 Final Response, Watts Bar Unit 2 MSPI Effectiveness Date)
  • ML18017A125  + (FAQ 17-04: Watts Bar Unit 2 MSPI Effectiveness Date -- Draft NRC Response)
  • ML17345A052  + (FAQ 17-04: Watts Bar Unit 2 MSPI Effectiveness Date)
  • ML18045A041  + (FAQ 17-05 Withdrawn and Final Response, Watts Bar 2 MSPI MS09 Effectiveness Date)
  • ML17345A055  + (FAQ 17-05: Watts Bar 2 MSPI MS09 Effectiveness Date)
  • ML18073A355  + (FAQ 18-0014 - Time to Detection Is Zero for Manual Non-Suppression Probability)
  • ML18263A104  + (FAQ 18-0014 Summary Position to NEI 9/19/2018)
  • ML18040B173  + (FAQ 18-0015 - More Realistic Contained Fire Duration Limits - Draft)
  • ML18073A352  + (FAQ 18-0017 Conditional Trip Probability for Modeling Operator Discretion)
  • ML18144A961  + (FAQ 18-01 Definition of Initial Transient Final Approved)
  • ML18044A035  + (FAQ 18-01, Definition of Initial Transient)
  • ML18088A821  + (FAQ 18-02 Proposed NRC Response - Watts Bar Critical Hours)
  • ML18136A858  + (FAQ 18-02 Rev 1 - Watts Bar Critical Hours)
  • ML18136A868  + (FAQ 18-02 Rev 2 Proposed NRC Response Rev 2)
  • ML18144A967  + (FAQ 18-02 Rev 2 Tentatively Approved)
  • ML18136A865  + (FAQ 18-02 Rev. 2 Watts Bar Critical Hours)
  • ML18144A977  + (FAQ 18-03 Columbia Scram Exemption Request Final Approved)
  • ML18116A107  + (FAQ 18-03 Columbia Scram Exemption Request Proposed Response)
  • ML18232A233  + (FAQ 18-04 ANO-1 Uswc Rev 1 Wapproved Final NRC Response, August 20, 2018)
  • ML18229A022  + (FAQ 18-04: ANO 1 Scram One Time Exemption Request)
  • ML19024A500  + (FAQ 18-05 Turkey Point U3 Scram Rev 1 - Final Approved)
  • ML19014A032  + (FAQ 18-05 Turkey Point U3 Scram Rev 1 - Proposed NRC Response)
  • ML18312A217  + (FAQ 18-05: Turkey Point U3 Scram - Proposed NRC Response)
  • ML18283A744  + (FAQ 18-XX Turkey Point Unit 3 Shutdown)
  • ML19169A262  + (FAQ 19-01 EP DEP PI Whitepaper Final)
  • ML19119A304  + (FAQ 19-01: Change to the NEI 99-02 Text for the Drill/Exercise Performance Indicator)
  • ML19169A263  + (FAQ 19-02 Brunswick RCS Leakage)
  • ML19198A226  + (FAQ 19-02 Brunswick RCS Leakage - Final Response)
  • ML20037B087  + (FAQ 20-01 Email)
  • ML20190A148  + (FAQ 20-01 NMP Scram Final Approved)
  • ML20108E914  + (FAQ 20-01: Nine Mile Point Scram Proposed NRC Response)
  • ML20170A638  + (FAQ 20-01: Nine Mile Point Scram Tentatively Approved)
  • ML20037B090  + (FAQ 20-01_NMP1 9-6-17 Unplanned Scram FAQ with Attachment 1-15-20_20200116)
  • ML20352A482  + (FAQ 20-02 - EP-ERO Performance Indicator (with Corrected Date))
  • ML20092K794  + (FAQ 20-02 EP-ERO Performance Indicator)
  • ML20107F675  + (FAQ 20-02 EP-ERO Performance Indicator Final Approved)