Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Exemption from 10CFR50,App R Requirements Re Fire Protection Program". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML17221A337  + (Exemption from 10CFR50,App J Requirement Re Testing of Air Locks Opened During Periods When Containment Integrity Not Required by Plant Tech Specs)
  • ML13316B273  + (Exemption from 10CFR50,App J Requirements Re Containment Air Lock Testing)
  • ML20248E909  + (Exemption from 10CFR50,App J Requirements to Permit one-time Extension for Certain Local Leak Rate Tests to Cycle 8 Refueling Outage & Changes to Surveillance Period for Local Leak Rate Tests of DHR Suction Piping)
  • ML20215E067  + (Exemption from 10CFR50,App J Requirements Re Type a Tests Until End of Refueling Outage 7)
  • ML20151N162  + (Exemption from 10CFR50,App J Requirements to Extend 24-month Testing Interval for Three RHR Shutdown Cooling Inboard Isolation Valves)
  • ML18054B294  + (Exemption from 10CFR50,App J Requirements Re Containment Airlock Testing)
  • ML20151E504  + (Exemption from 10CFR50,App J Type B & C Leak Rate Test Requirements.Tests Will Be Conducted Prior to Mode 4)
  • ML20043H111  + (Exemption from 10CFR50,App J to Permit Alternative Method for Testing Containment Airlock Door Equalizing Valve. Equalizing Valve on Inner Door of Each Airlock Cannot Be Tested Per App J Because of Valve Design)
  • ML20199L129  + (Exemption from 10CFR50,App J,III.D.2(b)(ii) Requirement to Conduct Full Pressure Airlock Leakage Test Whenever Airlocks Opened.Airlock Seal Leakage Test Substituted)
  • ML14183A098  + (Exemption from 10CFR50,App J,Paragraph III.A.3 Requirements Re Type a Containment Integrated Leak Rate Test Performed Per ANSI N45.4-1972)
  • ML20205A841  + (Exemption from 10CFR50,App J,Section II.A.3 Re Containment Integrated Leakage Rate Tests,Per Util 880801 Request)
  • ML20149D100  + (Exemption from 10CFR50,App J,Section III.D.3 Requirement to Perform Type C Tests at Each Reactor Shutdown for Refueling But in No Case at Intervals Greater than Two Yrs in Order to Allow for Tests to Be Conducted During First Refueling)
  • ML20082H915  + (Exemption from 10CFR50,App J,Section III.D.1.(a),allowing Three Type a Tests to Be Conducted at Approx Equal Intervals W/Third Done During Plant Shutdown for 10-yr ISI)
  • ML20055D234  + (Exemption from 10CFR50,App J,Section III.A.6.(b) Re Containment Integrated Leak Rate Test Interval)
  • ML19354E876  + (Exemption from 10CFR50,App J,Section III.D.1(A) to Permit Type a Tests to Continue to Be Conducted at 40 Month,+ or - 10-month Interval But No Longer Require That Third Test Be Conducted During 10-yr Inservice Insp Refueling Outage)
  • ML20059G760  + (Exemption from 10CFR50,App J,Section III.D.1(a) Re Schedule for Containment Integrated Leak Rate Tests)
  • ML20012C474  + (Exemption from 10CFR50,App J,Section III.D.3 Requirements Re Type C Tests on Containment Isolation Valves Each Refueling Outage)
  • ML20100N172  + (Exemption from 10CFR50,App J,Section III.D.1.(a) Re Containment Leak Rate Test Schedule)
  • ML20077B908  + (Exemption from 10CFR50,App J,Section Iv.A Requirements Re Type a Leak Testing Following Containment Boundary Repairs. Test Need Not Be Performed Until Next Scheduled Test)
  • ML20028B395  + (Exemption from 10CFR50,App J,Type B Testing of Electrical Penetrations,Penetrations W/Expansion Bellows & Containment Pressure Instrument Seal Lines & Type C Pneumatic Testing of Check Valves in Control Rod Drive Pump Supply Lines)
  • ML20236A308  + (Exemption from 10CFR50,App K Re Injection of Low Pressure ECCS Into Upper Plenum of Reactor in Event of LOCA)
  • ML20207L974  + (Exemption from 10CFR50,App R Re plant-specific Circumstances for Permitting Fire Barriers to Have Rating Less than 3 H. Existing Fire Protection Configuration Provides Equivalent Level of Protection Per Section III.G.2.a of App R)
  • ML15113A137  + (Exemption from 10CFR50,App R Requirements Re Emergency Lighting w/8 H Battery Power Supply for Safe Shutdown)
  • ML20070U109  + (Exemption from 10CFR50,App R Requirement to Install Fixed Fire Suppression Sys in Control Room)
  • ML20237C137  + (Exemption from 10CFR50,App R Requirements Re Fire Protection Features in Primary Auxiliary,Svc & Turbine Bldgs & Emergency Lighting in Event of Fire)
  • ML20195D502  + (Exemption from 10CFR50,App R Requirements Re Fire Protection Program)
  • ML20205P382  + (Exemption from 10CFR50,App R,Based on Analysis of Valves MU-V-2B & 2B & MU-V-3,4, & 5,indicating That at Least One Set of Valves Will Be Capable of Performing post-fire Shutdown Role W/O Addl Fire Protection Enhancements)
  • ML20212L084  + (Exemption from 10CFR50,App R,Section III.G.2 to Ensure That Adequate Fire Protection Features Provided for Redundant Cables or Equipment Located in Same Fire Area Outside of Primary Containment)
  • ML20199L005  + (Exemption from 10CFR50,App R,Section Iii,Paragraph O for Crystal River Nuclear Generating Plant,Unit 3.Exemption from Technical Requirements of 10CFR50,App R,Section Iii.O Granted)
  • ML20246A947  + (Exemption from 10CFR50,App R,Section Iii.J Re Emergency Lighting & Section III.G.2.a Re Unqualified Penetration Seal for Four Main Steam Lines & Two Feedwater Lines Through Reactor Bldg West Wall Into Turbine Bldg)
  • ML14183A122  + (Exemption from 10CFR50,App R,Section Iii.J Requirements Re Access & Egress to Safety Injection Pump Room & to Svc Water Intake Structure)
  • ML17325A132  + (Exemption from 10CFR50,App R,Section Iii.J Requirements, Authorizing Security Diesel Generator Lighting Alternative to 8 H Battery Powered Lighting Sys in Outdoor Yard Area)
  • ML20203E875  + (Exemption from 10CFR50,App R,Section Iii.G Fire Protection Requirements Re Cable & Equipment Separation to Protect Redundant Trains of Safe Shutdown Sys)
  • ML20212G315  + (Exemption from 10CFR50,App R,Section Iii.J Re Emergency Lighting for Operation of Electrical Bus 24F & Access/Egress Associated W/Equipment)
  • ML20209J411  + (Exemption from 10CFR50,App R,Section Iii.G,Requirement That One Train of Equipment Necessary to Achieve & Maintain Safe Shutdown Be Maintained Free of Fire Damage)
  • ML20006E384  + (Exemption from 10CFR50,App R,Section Iii.J Emergency Lighting Requirements)
  • ML20129J053  + (Exemption from 10CFR50,App R,Subsection Iii.G Re Requirements for Fire Protection of Safe Shutdown Capability)
  • ML20074B001  + (Exemption from 10CFR50,App R,Subsection III.G.2 Re Separation,Fire Barrier & Suppression Requirements Where Both Trains of Redundant Safe Shutdown Components Located within Same Fire Area)
  • ML20237B421  + (Exemption from 10CFR50,App a Re GDC 56 for Vacuum Relief Lines.Vacuum Relief Lines Can Be Isolated Using spring- Loaded Check Valve in Series W/Butterfly Valve)
  • ML20092B026  + (Exemption from 10CFR50,app J,Paragraphs III.D.2 & III.D.3, Extending Type B & C Test Interval on Containment Penetrations & Isolation Valves Beyond 2-yr Limit Specified in Regulations to Limit of 30 Months)
  • ML20070K904  + (Exemption from 10CFR50,app J,To Allow Leak Rate Testing of Four Containment Valves at Plant in Reverse Direction)
  • ML20029B670  + (Exemption from 10CFR50-54(q) Requirements Re Offsite Emergency Preparedness That Provides Reactor Shutdown & Changes Long Term Defueled Condition)
  • ML20058L588  + (Exemption from 10CFR50.120 Training Rule Requirements)
  • ML17139C751  + (Exemption from 10CFR50.44 Re Containment Inerting)
  • ML20079Q508  + (Exemption from 10CFR50.44(c)(3)(iii) Requirements Re RCS High Point Vents)
  • ML20028F574  + (Exemption from 10CFR50.44(c)(3)(iii) Schedular Requirements Re RCS High Point Gas Vent Installation)
  • ML20211N040  + (Exemption from 10CFR50.44(d) & (E) to Remove Hydrogen Control Requirements from SONGS Units 2 & 3 Design Basis. Exemption Also Allows Licensee to Modify Emergency Operating Instructions to Remove Operator Action Requirements)
  • ML19329D935  + (Exemption from 10CFR50.46 A,Superseding 780721 Order for Mod of License DPR-54.Authorizes Facility Operation in Absence of Implementation of Mods, Eliminating Reliance Upon Prompt Operator Action Per Util 780720,1009 &1122 Ltrs)
  • ML20079H120  + (Exemption from 10CFR50.46 Requirements Re Use of Demonstration Fuel Assemblies During Cycles 8,9 & 10)
  • ML20195D196  + (Exemption from 10CFR50.46(a)(1)(i) Re ECCS Cooling Performance Be Calculated W/Acceptable Evaluation Model & Results Conform to Criteria Set Forth in Paragraph 50.46(b))
  • ML19312C832  + (Exemption from 10CFR50.46(a),operator Action Requirements)