Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NL-07-0355, Examination and Mitigation of Alloy 82/182 Pressurizer Butt Welds + (Examination and Mitigation of Alloy 82/182 Pressurizer Butt Welds)
- NL-07-0121, Examination and Mitigation of Alloy 82/182 Pressurizer Butt Welds + (Examination and Mitigation of Alloy 82/182 Pressurizer Butt Welds)
- ML19341A333 + (Examination of Cracked Turbine Disc from Cooper Nuclear Power Station, Informal Rept)
- RIS 2003-01, Examination of Dissimilar Metal Welds, Supplement 10 to Appendix Viii of Section XI of the ASME Code + (Examination of Dissimilar Metal Welds, Supplement 10 to Appendix Viii of Section XI of the ASME Code)
- ML19263E019 + (Examination of Exxon Nuclear Fuel Examination at Yankee Rowe,Nov 1978, Nonproprietary Version)
- ML20069B478 + (Examination of Failed Studs from No. 2 Steam Generator at the Maine Yankee Nuclear Power Station)
- ML20126B294 + (Examination of Pathways from Soil to Man for Pu)
- ML20029D422 + (Examination of Relocated Fuel Debris Adjacent to the Lower Head of the TMI-2 Reactor Vessel)
- 05000338/FIN-2012003-02 + (Examination of SG safe-end weld with possible unqualified ultrasonic examination procedures)
- ML19338G385 + (Examination of Use of Potassium Iodide (Ki) as Emergency Protective Measure for Nuclear Reactor Accidents)
- ML19352B299 + (Examination of a 2-1/4 CR - 1 - Mo Steel Specimen CREEP- Fatigue Tested 8463 Hours at 811K)
- ML20090H880 + (Examination of the Size Effects and Data Scatter Observed in Small Specimen Cleavage Fracture Toughness Testing)
- ML072330292 + (Examinations Initial Exam 2007-301 - 120 Day Letter Corporate Notification)
- ML032720621 + (Examiner - Vendor Matrix with Phone Number)
- ML20003F000 + (Examiner Rept Recommending Adoption of Public Util Commission of Tx Price Elasticity Adjustments.Proposed Stipulation & Order Encl)
- ML20069B817 + (Examiners Handbook for Developing Operator Licensing Written Examinations)
- ML20117N069 + (Examiners Handbook for Developing Operator Licensing Examinations)
- Information Notice 1988-40, Examiners Handbook for Developing Operator Licensing Examinations + (Examiners Handbook for Developing Operator Licensing Examinations)
- ML20003E983 + (Examiners Rept That Public Util Commission of Tx Has Jurisdiction Over Matter.Util Bears Burden of Proving Proposed Rates Are Just & Reasonable)
- ML19246B629 + (Examines Possibility That Tube Cracks Existing in Steam Generator B May Not Have Withstood Transients Occurring on 790328.Result Would Have Been Baseline Leaks in Generator)
- ML15195A470 + (Examnination Report No. 50-128/OL-15-01, Texas A&M University)
- PMNS20180439, Example + (Example)
- ML21190A040 + (Example Calculation of Reevaluated Fuel Handling Accident Fission Product Transport Model for Draft RG 1)
- ML20024A581 + (Example Calculations Illustrating Methods for Analyzing Ductile Flaw Stability in Nuclear Pressure Vessels)
- ML20077J663 + (Example Calculations Illustrating Methods for Analyzing Ductive Flaw Stability in Nuclear Pressure Vessels)
- ML21260A019 + (Example Qualification Report)
- ML23024A063 + (Example of Email Distributing the Atomic Safety and Licensing Board Memorandum Regarding Submission of 10 C.F.R. 2.315(a) Limited Appearance Statements)
- ML20072C898 + (Examples of MC&A Systems to Meet Prompt Accountability Specifications)
- ML073240024 + (Examples of Max Thermal Power License Conditions)
- RIS 2007-09, Examples of Recurring Requests for Additional Information (RAIs) for 10 CFR Part 71 and 72 Applications + (Examples of Recurring Requests for Additional Information (RAIs) for 10 CFR Part 71 and 72 Applications)
- RIS 2004-20, Examples of Recurring Requests for Additional Information (Rais) for 10 CFR Part 71 and 72 Applications + (Examples of Recurring Requests for Additional Information (Rais) for 10 CFR Part 71 and 72 Applications)
- ML023100039 + (Examples of Risk-Informed Licensing Actions for Acrs/Acnw)
- ML20100K800 + (Examples,Clarifications, and Guidance on Preparing Requests for Relief from Pump and Valve Inservice Testing Requirements)
- ML20202J085 + (Examption from Requirements of 10CFR50,App J.Exemption Permits one-time Extension of Test Period for Type B & C Tests Until Containment Integrity Required for Startup. Exemption Effective Upon Issuance)
- ML17191B482 + (Exan Final Itens 2B - Delay Release 2 Yrs)
- ML17324A144 + (Excavation & Backfill Plans & Details)
- ML20262C070 + (Excavation Plan & Sections Cells 36 & 37)
- ML20260D246 + (Excavation Plan Plant Area)
- ML20349L041 + (Excavation Plan Unit 1 & 2 Power Block)
- ML20262C990 + (Excavation Plan:Unit 1 & 2 Power Block)
- ML17324A143 + (Excavation Plans & Details)
- ML17312A023 + (Excavation Plans & Details.Sheet 1 of 1)
- ML20262C065 + (Excavation Sections Cells 36 & 37)
- ML20262C994 + (Excavation Sections:Unit 1 & 2 Pwr Blk. Sheet 1)
- ML19270F601 + (Excavation,Backfill,Filling & Grading. Specifications for Excavation,Foundation Preparation & Backfill for Plant Area Bldgs,All Reservoir Concrete Structures & Filling & Grading in Plant Area)
- ML19254F474 + (Excecutive Branch Position Re GE Application for License to Export LWR to Philippines.Ltr of Assurance Encl.License Should Be Granted)
- ML18276A078 + (Exceedance of Benchmark Monitoring Requirement)
- 05000327/LER-2021-003, Exceeded Breach Margin Renders Both Trains of the Auxiliary Building Gas Treatment System Inoperable + (Exceeded Breach Margin Renders Both Trains of the Auxiliary Building Gas Treatment System Inoperable)
- 05000327/LER-2018-002, Exceeded Breach Margin Renders Both Trains of the Auxiliary Building Gas Treatment System Inoperable + (Exceeded Breach Margin Renders Both Trains of the Auxiliary Building Gas Treatment System Inoperable)
- 05000271/LER-2001-004 + (Exceeded Core Thermal Power Limit Due to Feedwater Flow Nozzle Fouling)
- 05000306/LER-2003-001, Exceeded Tech Spec Completion Time + (Exceeded Tech Spec Completion Time)