Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20083K476 + (Earliest Theoretical Fuel Loading Date Is 790702 W/Probable Scheduled Fuel Load Date of 791001 & Probable Start of Commercial Operation Near Jan 1980.Change Results from Delays in Start of Hot Functional Tests)
- ML24157A064 + (Earls 2024 Workshop Presentation)
- ML062360146 + (Early Containment Failure Considerations for Brunswick)
- ML20214H185 + (Early Diagnosis of Motor-Operated Valve Mechanical & Electrical Degradations)
- ML19249E473 + (Early Mortality Estimates for Different Nuclear Accidents, Final Phase 1 Rept,Oct 1977-Apr 1979)
- ML19351E377 + (Early Progress to Implement Federal Guidelines for Dam Safety & Recommendations to Improve Federal Dam Safety Programs)
- ML17151A829 + (Early Review of FRN Requested)
- ML033650325 + (Early Site Permit (ESP) Review for the Clinton ESP Site (Honorable D. Ketchum))
- ML25030A289 + (Early Site Permit (ESP-001) Timely Renewal Exemption Request Acceptance Letter)
- ML25148A026 + (Early Site Permit (ESP-002) Timely Renewal Exemption Request Acceptance Letter)
- ML19009A286 + (Early Site Permit - Clinch River Nuclear Site)
- ML040790804 + (Early Site Permit - Response to Verbal Request for Documentation)
- ML18031A951 + (Early Site Permit Application for the Clinch River Nuclear Site in Roane County, Tennessee)
- ML18058B661 + (Early Site Permit Application for the Clinch River Nuclear Site in Roane County, Tennessee Alabama-Coushatta)
- ML18051A746 + (Early Site Permit Application for the Clinch River Nuclear Site in Roane County, Tennessee Poarch Band)
- ML053620401 + (Early Site Permit Application for the Grand Gulf Site and the Associated Final Safety Evaluation Report)
- ML032790460 + (Early Site Permit Application, Revision 0, Table of Contents, Administrative Information, Site Safety Analysis Report Through Appendix 2.5.4A. (Non-Proprietary))
- ML032731602 + (Early Site Permit Application, Revision 0, Site Safety Analysis Report, Figures 2.5-46 Through 2.5-72)
- ML032790470 + (Early Site Permit Application, Revision 0, Environmental Report, Table of Contents Through Section 2.8)
- ML032731605 + (Early Site Permit Application, Revision 0, Site Safety Analysis Report, Chapter 3 Through Quality Assurance Manual, Rev 2)
- ML032731594 + (Early Site Permit Application, Revision 0, Site Safety Analysis Report, Figures 2.5-15 Through 2.5-45)
- ML032731593 + (Early Site Permit Application, Revision 0, Site Safety Analysis Report, Section 2.5.5 Through Figure 2.5-12)
- ML032731616 + (Early Site Permit Application, Revision 0, Environmental Report, Chapter 3 Through Programs and Plans, Section 1.2.3)
- ML061060003 + (Early Site Permit Application: Evaluation of Transportation Accidents on the Mississippi River)
- ENS 47446 + (Early Site Permit Postulated Seismic Acceleration Is Less than Projected Based on New Information)
- ML20072B387 + (Early Site Permit Program Plan)
- ML030140458 + (Early Site Permit Project Manager Reassignment for North Anna)
- ML022740172 + (Early Site Permit Project Quality Assurance Plan)
- ML033520358 + (Early Site Permit Review for the Clinton Site)
- ML033300252 + (Early Site Permit Review for the North Anna Power Station Site)
- ML031540694 + (Early Site Permit Topic 8 (ESP-8), Fuel Cycle and Transportation Impacts)
- ML19212A228 + (Early Site Review for Facilities)
- ML19242D917 + (Early Site Review for Facilities)
- ML20148K130 + (Early Site Reviews for Nuclear Power Facilities:Procedures & Possible Technical Review Options,Draft Revision)
- ML19308A241 + (Early Site Suitability Review Environ Rept. Rept Covers Environ Effects of Site Preparation & Station Operation & Describes Effluent & Environ Measurements & Monitoring Programs)
- 05000362/LER-1983-036-03, Early Warning Fire Detectors in Zone 41 Found Inoperable During 6-month Fire Detection Channel Functional Test.Caused by Faulty Wiring Connection.Wiring Connection Repaired + (Early Warning Fire Detectors in Zone 41 Found Inoperable During 6-month Fire Detection Channel Functional Test.Caused by Faulty Wiring Connection.Wiring Connection Repaired)
- ENS 42560 + (Early Warning Siren System (Ewss) Declared Inoperable)
- ENS 41242 + (Early Warning Siren System Failure)
- ENS 46039 + (Early Warning Siren Test Failure)
- ENS 46013 + (Early Warning System Found Non-Responsive During Testing)
- ML20151S757 + (Early and Continuing Effects of Combined Alpha and Beta Irradiation of the Lung.Phase II Report)
- ML21007A294 + (Earth Engineers, Inc., 52-31427-01, 60-Day Expiry Notification)
- ML20053E771 + (Earth Resistivity as a Tool for Shallow Exploration in the Reelfoot Lake Area,Tennessee)
- ML19290E364 + (Earth Science Technical Plan for Mined Geological Disposal of Radwaste, Draft)
- ML21007A295 + (Earth Systems Pacific 04-08357-02, 60-Day Expiry Notification)
- ENS 45823 + (Earthquake)
- ML12054A081 + (Earthquake AIT Brief)
- ML20118A747 + (Earthquake Analysis of Control Bdlg Cooper Nuclear Generating Station)
- ML20118A748 + (Earthquake Analysis of Reactor Bldg Cooper Nuclear Generating Station)
- ML19260C073 + (Earthquake Damage Observation Rept)
- ENS 40258 + (Earthquake Felt on Site. Entered Emergency Action Level (Eal) 18)