Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML101970283 + (EC 361965, Rev. 00 - Remediation of Tritium Contaminated Groundwater in the Vicinity of Vacuum Breaker 1)
- IR 05000003/2037094 + (EC 5000033794, Revision 1, Indian Point 2 Station Blackout and Appendix R Diesel Generator Set)
- ML090410051 + (EC 5000033794, Revision 1, Indian Point 2 Station Blackout and Appendix R Diesel Generator Set)
- BW230054, EC 639996 (Byron), Revision 1 and 640160 (Braidwood), Revision 0, Technical Evaluation for NEI 03-08 Deviation of Baffle-Former Bolts Volumetric Examinations for Byron and Braidwood + (EC 639996 (Byron), Revision 1 and 640160 (Braidwood), Revision 0, Technical Evaluation for NEI 03-08 Deviation of Baffle-Former Bolts Volumetric Examinations for Byron and Braidwood)
- BW240017, EC 640658, Revision 0 Technical Evaluation for NEI 03-08 Deviation of Control Rod Guide Tube Guide Card Wear Measurements + (EC 640658, Revision 0 Technical Evaluation for NEI 03-08 Deviation of Control Rod Guide Tube Guide Card Wear Measurements)
- ML18215A221 + (EC 69954, Rev 0, Partial Site Release - Phase 1)
- LIC-18-0023, EC 69954, Rev 0, Partial Site Release - Phase 1 + (EC 69954, Rev 0, Partial Site Release - Phase 1)
- ML17158C220 + (EC Insp Repts 50-387/97-05 & 50-388/97-05 on 970321. Violations Noted.Major Areas Discussed:Violations Identified During Insp & Investigations Conducted)
- IR 05000255/1996006 + (EC Rept 50-255/96-06 on 960621.Areas Discussed:Apparent Violations Noted in Insp & Corrective Actions Taken or Planned by Licensee)
- ML17304A761 + (EC Sys & Control Room Temp Rise Study,Quality Class:Q Safety-Related)
- 05000440/FIN-2016004-01 + (ECC B Heat Exchanger Flow Root Valves Out of Position)
- ML19225A038 + (ECC Bypass Scaling)
- ML20265D051 + (ECC Si/Auto Recirculation ESF Status Monitoring Train a Logic Diagram System:Sm)
- ML20260C960 + (ECC Si/Auto Recirculation ESF Status Monitoring Train C Logic Diagram System:Sm. Actual Drawing NUMBER:7Z-26-9-Z-41875 1)
- ML20260C820 + (ECC Si/Auto Recirculation ESF Status Monitoring Train B Logic Diagram System:Sm. Actual Drawing NUMBER:7Z-26-9-Z-41847 1)
- ML20261L345 + (ECC St/Auto Recirculation ESF Status Monitoring Train a Logic Diagram System:Sm)
- ML20260C665 + (ECC St/Auto Recirculation ESF Status Monitoring Train a Logic Diagram System:Sm. Actual Drawing NUMBER:7Z-26-9-Z-41813 1)
- ML19323C637 + (ECCS & Thermal-Hydraulic Analysis for Reload H Design, Nonproprietary Version.Affidavit Encl)
- ML12233A621 + (ECCS 30-Day Report for the Thermal Conductivity Degradation Impact on Large Break Loss of Coolant Accident Analysis with ASTRUM)
- NRC 2012-0038, ECCS 30-Day Report for the Thermal Conductivity Degradation Impact on Large Break Loss of Coolant Accident Analyses with ASTRUM + (ECCS 30-Day Report for the Thermal Conductivity Degradation Impact on Large Break Loss of Coolant Accident Analyses with ASTRUM)
- ML20107K241 + (ECCS Analysis for Susquehanna Unit 1 at Full Power & 87% Flow Using Exxon Nuclear Co Exem BWR Evaluation Model)
- ML17339B088 + (ECCS Analysis,25% Steam Generator Tube Plugging)
- ML17252B626 + (ECCS Appendix K Single Failure Analysis)
- ML24325A570 + (ECCS Compensated Level System Replacement Project, Constellation Pre-submittal Meeting Slides November 22, 2024 (EPID L-2024-LRM-0009) Public)
- ML24302A242 + (ECCS Compensated Level System Replacement Project Pre-Submittal Meeting Slides)
- TSTF-325 + (ECCS Conditions and Required Actions with < 100 Percent Equivalent ECCS Flow)
- NRC-03-0051, ECCS Cooling Performance Evaluation Model Report + (ECCS Cooling Performance Evaluation Model Report)
- NRC-02-0071, ECCS Cooling Performance Evaluation Model Report + (ECCS Cooling Performance Evaluation Model Report)
- ML19347B560 + (ECCS Design Rept)
- ML19329C214 + (ECCS Emergency Sump & Pump Suction Line Testing, Final Rept)
- ML19329C205 + (ECCS Emergency Sump Model Testing to Investigate Vortexing Potential, Interim Rept)
- NRC 2010-0092, ECCS Evaluation Model Changes + (ECCS Evaluation Model Changes)
- NRC 2007-0017, ECCS Evaluation Model Changes + (ECCS Evaluation Model Changes)
- NRC 2005-0053, ECCS Evaluation Model Changes + (ECCS Evaluation Model Changes)
- NRC 2006-0047, ECCS Evaluation Model Changes, 10 CFR 50.46 + (ECCS Evaluation Model Changes, 10 CFR 50.46)
- NRC 2004-0038, ECCS Evaluation Model Changes, 10 CFR 50.46 + (ECCS Evaluation Model Changes, 10 CFR 50.46)
- NRC 2003-0036, ECCS Evaluation Model Changes, 10 CFR 50.46 + (ECCS Evaluation Model Changes, 10 CFR 50.46)
- RS-14-082, ECCS Evaluation Model Error - 10 CFR 50.46 30-Day Report + (ECCS Evaluation Model Error - 10 CFR 50.46 30-Day Report)
- RS-19-002, ECCS Evaluation Model Error - 10 CFR 50.46 30-Day Report + (ECCS Evaluation Model Error - 10 CFR 50.46 30-Day Report)
- RS-11-030, ECCS Evaluation Model Error - 10 CFR 50.46 Reports + (ECCS Evaluation Model Error - 10 CFR 50.46 Reports)
- ULNRC-05260, ECCS Evaluation Model Revisions + (ECCS Evaluation Model Revisions)
- ULNRC-06645, ECCS Evaluation Model Revisions + (ECCS Evaluation Model Revisions)
- ML13309B053 + (ECCS Evaluation Model Revisions 30-Day Report)
- ML081360102 + (ECCS Evaluation Model Revisions Annual Report)
- RC-07-0081, ECCS Evaluation Model Revisions Annual Report + (ECCS Evaluation Model Revisions Annual Report)
- ML051580196 + (ECCS Evaluation Model Revisions Annual Report)
- ML041410260 + (ECCS Evaluation Model Revisions Annual Report)
- RC-03-0099, ECCS Evaluation Model Revisions Annual Report + (ECCS Evaluation Model Revisions Annual Report)
- RC-02-0086, ECCS Evaluation Model Revisions Annual Report + (ECCS Evaluation Model Revisions Annual Report)
- ML12160A354 + (ECCS Evaluation Model Revisions Report)
- ML11159A210 + (ECCS Evaluation Model Revisions Report)
- ML18179A416 + (ECCS Evaluation Model Revisions Report)