Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 1CAN010904, Deviation from EPRI Guideline - Steam Generator Chemistry Specification + (Deviation from EPRI Guideline - Steam Generator Chemistry Specification)
- 1CAN030906, Deviation from EPRI Guideline Steam Generator Chemistry Specification + (Deviation from EPRI Guideline Steam Generator Chemistry Specification)
- L-2013-314, Deviation from EPRI MRP-146 Revision I Inspection Schedule - NEI 03-08 Needed Work Product Element - for Information Only + (Deviation from EPRI MRP-146 Revision I Inspection Schedule - NEI 03-08 Needed Work Product Element - for Information Only)
- L-2009-128, Deviation from EPRI MRP-146 Ultrasonic Examination Schedule - NEI 03-08 Needed Work Product Element + (Deviation from EPRI MRP-146 Ultrasonic Examination Schedule - NEI 03-08 Needed Work Product Element)
- L-2025-148, Deviation from EPRI MRP-227 + (Deviation from EPRI MRP-227)
- ENS 41723 + (Deviation from Integrated Safety Analysis, and a 24 Hour Notification - Bulletin 91-01 Criticality Control)
- L-19-222, Deviation from MRP-227-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines + (Deviation from MRP-227-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines)
- L-15-250, Deviation from MRP-227A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines + (Deviation from MRP-227A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines)
- 1CAN031003, Deviation from NEI Guideline - RCS Leakage Action Levels + (Deviation from NEI Guideline - RCS Leakage Action Levels)
- ML060720202 + (Deviation from the Reactor Oversight Process Action Matrix to Provide Increased NRC Oversight of Specific Issues at Indian Point Energy Center)
- ML100990458 + (Deviation from the Reactor Oversight Process to Provide Increase NRC Oversight to Specific Issues at Vermont Yankee Nuclear Power Station)
- ML12258A042 + (Deviation from the Reactor Oversight Process Action Matrix)
- ENS 55639 + (Deviation of Delivery Procedure by Common Carrier Staff Leaving Radioactive Material Unattended)
- ML19242B020 + (Deviation of Floor Responses Reactor Bldg)
- ENS 53841 + (Deviation of Ts 3.3.A(1) for Anti-Siphon Device Found Inoperable)
- ML040820964 + (Deviation to Action Matrix to Continue Heightened NRC Oversight of Indian Point Nuclear Generating Unit 2 - Memo to Travers from Miller Thru Dyer)
- ML23265A012 + (Deviation to Far 19 Due to Ultima)
- ML042290139 + (Deviation to Matrix to Provide Heightened NRC Oversight of the Salem and Hope Creek Units)
- ML13046A426 + (Deviations from the Approved Alert and Notification System Design Report Identified at Fort Calhoun Station During the November 2012 NRC Inspection)
- ENS 43176 + (Device Containing Radioactive Sources Inadvertently Sent to Recycling Facility)
- ENS 55250 + (Device Not Located During Inspection)
- ML20260J767 + (Device Numbers & General Notes)
- ML17262A451 + (Devonrue Calculation Re Plant Atmospheric Relief Valve (ARV) Area Ambient Temp rise-revised Methodology)
- ML17262A453 + (Devonrue Calculation Re Plant Turbine Driven Auxiliary Feedwater Pump Area Ambient Temp Rise)
- ML23340A093 + (Devsecops Application Lifecycle Management (Public))
- ML20259D049 + (Dewatering Events)
- ML042450597 + (Dewatering Structure Usage for Schuylkill River Debris Removal)
- ML071710076 + (Dewatering and Repair of Erosion in Category I Backfill in Power Block Area, Final Report)
- ML25142A389 + (Dexter Sharp, Chief Piedmont American Indian Association)
- ML20353A353 + (Dfm Division Instruction, FF-FM - 2, Implementation of U.S. - IAEA Safeguards Agreement)
- ML20010D837 + (Dfm Licensing Process Expectations Memorandum and Enclosure)
- ML23257A097 + (Dfm Management Tasking Memorandum in Response to Recommendations from the Qualifications Working Group on Updates and Revisions to the Dfm Staff Qualifications Program)
- ML22364A288 + (Dfm Qualifications Working Group Task 2 Closure Memo)
- ML24331A145 + (Dfr - List of Approved Spent Fuel Storage Casks: NAC Multi-Purpose Canister System, CoC No. 1025, Amendment No. 9 and Revision to Amendments Nos. 6,7, and 8 - Confirmation Notice)
- ML21008A583 + (Dfr Companion Proposed Rule Tn Americas LLC, Standardized NUHOMS System, Certificate of Compliance No. 1004, Renewed Amendment No. 17)
- ML19343B850 + (Dfr Companion Proposed Rule Tn NUHOMS Eos Amendment 1)
- ML24157A089 + (Dh 5.2 Cooperation with States at Commercial Nuclear Power)
- ML20266G933 + (Dhtf Shipping Container Details & Assembly)
- ML20280A436 + (Dhulipala - Seismic FSI Using Mastodon)
- ML25175A098 + (Di&C & HFE Workshop: Human Factors Research on Remote and Autonomous Operations (Presentation))
- ML24305A096 + (Di&C ISG-06, Licensing Process Enclosure B Information - Peach Bottom Units 2 and 3 Digital Upgrade Pre-application Meeting on October 29, 2024 - Slides)
- ML031920491 + (Diablo C. Pp, Unit 1 (Tac. MB8081) & Unit 2 (Tac. MB8196) Issuance of Amds (2) Rev. of TS Section 3.5.2-One-Time Increase in Charging Pump Completion Time During Cycle 12 Fr 72 Hours to 7 Days for Unit 1 & Deletion of an Expired Req for Uni)
- IR 07200026/2021401 + (Diablo Canon Nuclear Power Plant, Security Baseline Inspection Report 07200026/2021401)
- ML052660331 + (Diablo Canon Pp, Units 1 & 2 - Approval of Requests for Relief from the (ASME) Boiler and Pressure Vessel Code (Code) Section XI Inservice Inspection Program Requirements (Tac Nos MC6693 & MC6694))
- ML081010207 + (Diablo Canon, Units 1 & 2 - License Amendment Request 08-02, Revision to Technical Specification 3.7.5, Auxiliary Feedwater System and 3.7.6 Condensate Storage Tank and Fire Water Storage Tank)
- ML110470006 + (Diablo Canyon - February Hearing File Update)
- DCL-12-006, Diablo Canyon - Inservice Inspection Program Plan, Third 10-Year Inspection Interval, Revision 1, Drawing No. 102028, Sheet 39, Through Drawing No. 104628, Sheet 46 + (Diablo Canyon - Inservice Inspection Program Plan, Third 10-Year Inspection Interval, Revision 1, Drawing No. 102028, Sheet 39, Through Drawing No. 104628, Sheet 46)
- DCL-12-006, Diablo Canyon - Inservice Inspection Program Plan, Third 10-Year Inspection Interval, Revision 1, Cover Page Through Page 100 + (Diablo Canyon - Inservice Inspection Program Plan, Third 10-Year Inspection Interval, Revision 1, Cover Page Through Page 100)
- DCL-12-006, Diablo Canyon - Inservice Inspection Program Plan, Third 10-Year Inspection Interval, Revision 1, Page 201 Through Drawing No. 102028, Sheet 38 + (Diablo Canyon - Inservice Inspection Program Plan, Third 10-Year Inspection Interval, Revision 1, Page 201 Through Drawing No. 102028, Sheet 38)
- DCL-12-006, Diablo Canyon - Inservice Inspection Program Plan, Third 10-Year Inspection Interval, Revision 1, Page 101 Through Page 200 + (Diablo Canyon - Inservice Inspection Program Plan, Third 10-Year Inspection Interval, Revision 1, Page 101 Through Page 200)
- L-2009-517, Diablo Canyon - Receiving Water Monitoring Program 2008 Annual Report + (Diablo Canyon - Receiving Water Monitoring Program 2008 Annual Report)