Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206L018 + (DOE O 458.1 Chg. 3 01-15-2013)
- ML20206L019 + (DOE O 5820.2A 02-06-1984, U.S. Department of Energy Order, Radioactive Waste Management)
- ML18064A894 + (DOE Oak Ridge Groundwater Strategy 2013)
- ML24275A072 + (DOE Oced KU1 Preconstruction Initiation Response)
- ML20236X693 + (DOE Ofc of Civilian Radwaste Mgt Bulletin Re Second Repository site-selection Process Resumes)
- ML21035A224 + (DOE Order 435.1 - Change 2, Radioactive Waste Management)
- ML20215J359 + (DOE Order 5481.1, Safety Analysis & Review Sys)
- ML20206L020 + (DOE P 450.4A 04-25-2011, U.S. Department of Energy Policy, Integrated Safety Management Policy)
- ML20198C636 + (DOE Plan for Umtra Project Water Protection Standards, Dtd July 1986)
- ML18057A187 + (DOE Presentation ATF Briefing for NRC Public Meeting 02/27/2018)
- ML20196L733 + (DOE Presentation for July 16, 2020 Meeting on Idaho Spent Fuel Facility)
- ML23361A151 + (DOE Presentation for the HFIR Package -96 Amendment Request)
- ML18205A653 + (DOE Presentation: Savannah River Site Salt Waste Disposal U.S. NRC Onsite Observation Visit July 9-11, 2018)
- ML12258A014 + (DOE Prime Contractor Exemption, Letter Only)
- ML11180A228 + (DOE Public Notice of Publication for the Resource Conservation and Recovery Act Closure Plan for the Hazardous Waste Storage Lockers)
- ML25091A056 + (DOE RAI Responses for the NRC RAI on the Draft Basis for Section 3116 Determination for the Closure of the Calcined Solids Storage Facility PROJ0735)
- ML19317F620 + (DOE Region 1 Radiological Assistance Program Response to Incident at TMI,Mar-Apr 1979)
- ML22031A216 + (DOE Response to Comments)
- ML21095A337 + (DOE Response to Comments)
- ML25034A272 + (DOE Response to NRC Comments on Annual Performance Report April 2021 Through March 2022 for Shiprock, Nm, Disposal Site)
- ML101090101 + (DOE Response to NYSERDA Comments on Phase 1 Fssp for WVDP)
- ML20149D979 + (DOE Response to Stds for Remedial Actions at Inactive U Processing Sites; Proposed Rule)
- ML20129J650 + (DOE Responses to Cdh Oct 193 Comments on Remedial Action Plan for Naturita,Co,Umtra Site)
- ML15264A520 + (DOE Responses to NRC Comments - WVDP Radiological Characterization Report for HLW and Bosf)
- ML19309D457 + (DOE Responses to NRC Comments on the Report Entitled Results of the Laboratory Batch Test of Phosphate Amendment Added to Shiprock Sediment and Groundwater)
- ML20140F299 + (DOE Rl Newsclippings)
- ML23244A197 + (DOE Slides Sept 7-HALEU Demonstration and Production)
- ML20132A335 + (DOE Transition Issues at Durita Site)
- ML20214E857 + (DOE Umtrap Integrated Monthly Vicinity Property Progress Rept 15 for Mar 1987)
- ML20206A719 + (DOE Umtrap Integrated Monthly Vicinity Property Progress Rept, for Jan 1987)
- ML20237K329 + (DOE Umtrap Integrated Monthly Vicinity Property Progress Rept 18 for June 1987)
- ML18256A367 + (DOE Updates on Consensus-Based Standards Efforts)
- ML20055J105 + (DOE West Valley Demonstration Project Site-Specific Plan)
- ML20091C224 + (DOE West Valley Project Ofc Operational Readiness Review Plan for Resumption of Integrated Radwaste Treatment Sys Operations,High Level Waste Treatment Phase II - Sludge Wash)
- ML20269A318 + (DOE Wni Communications)
- ML21026A012 + (DOE and NRC Meeting Dec 9 2020 Summary Tank Grout Exps Reviewed)
- ML19056A230 + (DOE and NRC Roles and Responsibilities for Oversight of the Battelle Columbus Laboratories Decommissioning Project (Bcldp))
- ML19051A044 + (DOE and NRC Roles and Responsibilities for Oversight of the Battelle Columbus Laboratories Decommissioning Project (Bcldp))
- ML21036A205 + (DOE, 2020 Verification Monitoring Report for the Gunnison, Colorado, Processing Site)
- ML23060A349 + (DOE, 2022 Verification Monitoring Report for Gunnison, Colorado, Processing Site)
- ML23060A348 + (DOE, 2022 Verification Monitoring Report for Gunnison, Colorado, Processing Site)
- ML23019A362 + (DOE, Confirmation of Active and Good Faith Negotiations for Disposal Contract)
- ML23254A230 + (DOE, Isff ISFSI Biennial Update Report for 2023)
- ML23060A350 + (DOE, LMS/GUP/41574, 2022 Verification Monitoring Report for Gunnison, Colorado, Processing Site)
- ML21036A204 + (DOE, Submittal of 2020 Verification Monitoring Report for Gunnison, Colorado, Processing Site)
- ML23254A229 + (DOE, Submittal of Idaho Spent Fuel Facility (Docket 72 0025) Independent Spent Fuel Storage Installation Biennial Safety Analysis Update Report, NLF-RPT-265 (CLN231532))
- ML23254A228 + (DOE, Submittal of Idaho Spent Fuel Facility (Docket 72 0025) Independent Spent Fuel Storage Installation Biennial Safety Analysis Update Report, NLF-RPT-265 (CLN231532))
- ML18019A919 + (DOE-2011 - TN4888 - DOE 2011 EA-1640 - Fea and Fonsi)
- ML18019A920 + (DOE-2011- TN5023--EIS-0387-FEIS-01-2011)
- ML18019A923 + (DOE-2015 - TN4964--DOE 2015 FY2014 Orem Economic Impact)
- ML18019A926 + (DOE-2016 - TN5022--EA-2000-FONSI-2016)