Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- BYRON 2012-0104, Cycle 19 Core Operating Limits Report + (Cycle 19 Core Operating Limits Report)
- NOC-AE-16003419, Cycle 19 Core Operating Limits Report + (Cycle 19 Core Operating Limits Report)
- ML031600972 + (Cycle 19 Core Operating Limits Report)
- BW150043, Cycle 19 Core Operating Limits Report + (Cycle 19 Core Operating Limits Report)
- ML16333A002 + (Cycle 19 Core Operating Limits Report)
- GO2-07-089, Cycle 19 Core Operating Limits Report (Colr), Revision 0 + (Cycle 19 Core Operating Limits Report (Colr), Revision 0)
- GO2-08-138, Cycle 19 Core Operating Limits Report (Colr), Revision 1 + (Cycle 19 Core Operating Limits Report (Colr), Revision 1)
- NL-05-0448, Cycle 19 Core Operating Limits Report (Colr). Version 1 + (Cycle 19 Core Operating Limits Report (Colr). Version 1)
- L-2004-138, Cycle 19 Core Operating Limits Report - Revision 1 + (Cycle 19 Core Operating Limits Report - Revision 1)
- NL-15-1602, Cycle 19 Core Operating Limits Report Version 2 + (Cycle 19 Core Operating Limits Report Version 2)
- TMI-11-157, Cycle 19 Core Operating Limits Report, COLR TMI 1, Revision 8 + (Cycle 19 Core Operating Limits Report, COLR TMI 1, Revision 8)
- HNP-13-116, Cycle 19 Core Operating Limits Report, Revision 0 + (Cycle 19 Core Operating Limits Report, Revision 0)
- L-2004-076, Cycle 19 Core Operating Limits Report, Revision 0 + (Cycle 19 Core Operating Limits Report, Revision 0)
- ML033300334 + (Cycle 19 Core Operating Limits Report, Revision 0)
- NL-16-0597, Cycle 19 Core Operating Limits Report, Version 2 + (Cycle 19 Core Operating Limits Report, Version 2)
- ML15282A222 + (Cycle 19 MCPR Safety Limit Analysis with SAFLIM3D Methodology)
- ML20196H864 + (Cycle 19 Operating Rept)
- ML14259A334 + (Cycle 19 Refueling Outage - 90-Day Inservice Inspection Summary Report)
- BSEP 12-0085, Cycle 19 Startup Report + (Cycle 19 Startup Report)
- BSEP 09-0066, Cycle 19 Startup Report + (Cycle 19 Startup Report)
- ML20077R993 + (Cycle 19 Startup Rept)
- RA21-043, Cycle 19 Startup Test Report Summary + (Cycle 19 Startup Test Report Summary)
- WBL-25-020, Cycle 19 Steam Generator Tube Inspection Report + (Cycle 19 Steam Generator Tube Inspection Report)
- RA20-014, Cycle 19 and Cycle 18 Core Operating Limits Reports + (Cycle 19 and Cycle 18 Core Operating Limits Reports)
- L-16-253, Cycle 19 and Refueling Outage 19 Inservice Inspection Summary Report + (Cycle 19 and Refueling Outage 19 Inservice Inspection Summary Report)
- BYRON 2014-0002, Cycle 19 and Unit 2 Cycle 18 Core Operating Limits Report for Measurement Uncertainty Recapture (MUR) Power Uprate + (Cycle 19 and Unit 2 Cycle 18 Core Operating Limits Report for Measurement Uncertainty Recapture (MUR) Power Uprate)
- ML12104A268 + (Cycle 19, Core Operating Limits Report)
- L-15-304, Cycle 19, Core Operating Limits Report + (Cycle 19, Core Operating Limits Report)
- ML12100A086 + (Cycle 19, Core Operating Limits Report, March 2012)
- ULNRC-05831, Cycle 19, Facility Operating License NPF-30, Core Operating Limits Report + (Cycle 19, Facility Operating License NPF-30, Core Operating Limits Report)
- ML080710432 + (Cycle 19, Revision 0 Core Operating Limits Report)
- ML033010450 + (Cycle 19, Revision 1 to Core Operating Limits Report)
- ML070940684 + (Cycle 19, Revision 30 Core Operating Limits Report (COLR))
- ML19261B359 + (Cycle 1:Mid-Cycle Startup Rept)
- ML20032C778 + (Cycle 2 - Reload Rept. Tech Specs Encl)
- ML20069K367 + (Cycle 2 Core Performance Rept)
- ML19350D389 + (Cycle 2 Core Performance Rept)
- ML20112H497 + (Cycle 2 Plant Transient Analysis)
- ML17146A421 + (Cycle 2 Plant Transient Analysis)
- ML19317D651 + (Cycle 2 Power Distribution Comparison Rept)
- ML20082B745 + (Cycle 2 Radial Peaking Limit Rept)
- ML20072P811 + (Cycle 2 Refueling Outage Fuel Exam Results)
- ML17146A419 + (Cycle 2 Reload Analysis Design & Safety Analyses)
- ML20148T229 + (Cycle 2 Reload Analysis Rept)
- ML20008E686 + (Cycle 2 Reload Analysis Rept, Remaining sections.Marked-up Tech Specs Encl)
- ML19284A448 + (Cycle 2 Reload Rept)
- ML19308B519 + (Cycle 2 Reload Rept)
- ML19308B546 + (Cycle 2 Reload Rept)
- ML19319A780 + (Cycle 2 Reload Rept)
- ML19210A518 + (Cycle 2 Reload Rept (Based on Cycle 1 Burnup of 440 Plus or Minus 10 Effective Full Power Days))
- ML19322C157 + (Cycle 2 Reload Rept, Revision 1)
- ML19326C004 + (Cycle 2 Reload Rept. Nonproprietary Version)