Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20265B113 + (Containment Bldg 1 - Interior Concrete Sections. Sheet 6)
- ML20265B117 + (Containment Bldg 1 - Interior Concrete Sections. Sheet 7)
- ML20265B207 + (Containment Bldg 1 - Isometric El 860 Ft to 881 Ft 6 Inches. Sheet 2)
- ML20265B251 + (Containment Bldg 1 - Reactor Cavity Blockout Plan. Sheet 2.Rev Date Illegible)
- ML20265B247 + (Containment Bldg 1 - Reactor Cavity Blockout Plan. Sheet 1)
- ML20265B256 + (Containment Bldg 1 - Reactor Cavity Isometric:El 819 Ft to 834 Ft. Sheet 3)
- ML20265B216 + (Containment Bldg 1 - Slab Plans at El 351 Ft 6 Inches,E1 873 Ft & El 843 Ft. Sheet 1)
- ML20265B220 + (Containment Bldg 1 El 885 Ft 6 Inches Plan. Sheet 1)
- ML20265B091 + (Containment Bldg 1-Construction Jt Plan at El 803 Ft. Sheet 1)
- ML20265B081 + (Containment Bldg 1-Exterior Wall Isometric Showing Cds (El 889 Ft 6 Inches to El 1,000 Ft 6 Inches). Sheet 3)
- ML20265B102 + (Containment Bldg 1-Interior Concrete-Sections. Sheet 4)
- ML20265B098 + (Containment Bldg 1-Isometric 808 Ft to 808 Ft 4 Inches- Interior Concrete. Sheet 2)
- ML20265B085 + (Containment Bldg 1:Dome Showing Cds El 1,000 Ft 6 Inches to 1,070 Ft 6 Inches. Sheet 4)
- ML20349L715 + (Containment Bldg Area 4A Level 1 Plan El 210 0 to 238 0)
- ML20265D038 + (Containment Bldg Area 4A Level 1 Plan El 210 0 to 238 0)
- ML20265D047 + (Containment Bldg Area 4B Level 1 Plan El 210 0 to 238 0)
- ML20266D773 + (Containment Bldg Area 4B Level 1:Plan El 210 Ft-238 Ft)
- ML20265C847 + (Containment Bldg Area 4C Level 1 Plan El 210 0 to 238 0)
- ML20266D761 + (Containment Bldg Area 4C Level 1:Plan El 210 Ft-238 Ft)
- ML20265C862 + (Containment Bldg Area 4D Level 1 Plan El 210 0 to 238 0)
- ML17304A185 + (Containment Bldg Conduit & Tray Plan at El 140 Ft Level 3 ZC3B)
- ML17304A184 + (Containment Bldg Conduit & Tray Plan at El 140 Ft Level 3 ZC3D)
- ML17304A188 + (Containment Bldg Conduit & Tray Plan at El 80 Ft Level a Zcaa,Zcab)
- ML17304A186 + (Containment Bldg Conduit Tray Plan at El 80 Ft Level a Zcac,Zcad)
- ML20032B484 + (Containment Bldg Decontamination Experiment, Purpose & Scope of Work,Revision 0)
- ML20107E990 + (Containment Bldg Design Rept)
- ML17319A956 + (Containment Bldg Development of Crane Wall (Upper) from El 649 F1 9 Inches to El 715 Ft 7 3/4 from O Degrees to 180 Degrees - Masonry)
- ML20008F288 + (Containment Bldg Hydrogen Control Methods Related to Degraded Core Accidents, Informal Rept)
- ML20261F882 + (Containment Bldg Piping Area 4A B C & D Level B - Plan & Sections Reactor Coolant Loop.Sheet 1 of 3.Rev Date Illegible)
- ML20349K699 + (Containment Bldg Piping Area 4A B C & D Level B Plan & Sections Reactor Coolant Loops.Sheet 1 of 3)
- ML20265C867 + (Containment Bldg Piping Area 4A B C & D Level B Plan & Sections Reactor Coolant Loops.Sheet 1 of 3)
- ML20265D638 + (Containment Bldg Piping Area 4A B C & D Level B Plan & Sections Reactor Coolant Loops.Sheet 1 of 3)
- ML20265D644 + (Containment Bldg Piping Area 4A B C D Level B Plan & Section Reactor Coolant Loop.Sheet 2 of 3)
- ML20265D649 + (Containment Bldg Piping Area 4A B C D Level B Plan & Section Reactor Coolant Loop.Sheet 3 of 3)
- ML20265C878 + (Containment Bldg Piping Area 4A B C D Level B Plan & Section Reactor Coolant Loop.Sheet 3 of 3)
- ML20261F887 + (Containment Bldg Piping Area 4A B C D Level B Plan & Section Reactor Coolant Loop.Sheet 2 of 3.Drawing Not Dtd)
- ML20261F893 + (Containment Bldg Piping Area 4A B C D Level B Plan & Section Reactor Coolant Loop.Sheet 3 of 3.Drawing Not Dtd)
- ML18046B080 + (Containment Bldg Post-Accident Sys 10-Yr Surveillance Rept)
- ML20086U104 + (Containment Bldg Post-Tensioning Sys Eight-Yr Surveillance)
- ML20086U094 + (Containment Bldg Post-Tensioning Sys One-Yr Surveillance)
- ML20086U085 + (Containment Bldg Post-Tensioning Sys One-Yr Surveillance)
- ML20086U111 + (Containment Bldg Post-Tensioning Sys Thirteen-Yr Surveillance)
- ML20086U101 + (Containment Bldg Post-Tensioning Sys Three-Yr Surveillance)
- ML20263F722 + (Containment Bldg Reactor Vessel Head Vent System Piping - Plans & Sections Flow Diagram)
- ML19276H211 + (Containment Bldg Ring Girder Const & Repair,Addendum 2)
- ML18044A343 + (Containment Bldg Structural Integrity Test)
- ML20040F268 + (Containment Bldg Tendon Investigation)
- ML20349L637 + (Containment Bldg Unit 1 Containment Wall Piping Penetration Design List)
- ML20349K612 + (Containment Bldg Unit 2 Containment Wall Piping Penetration Design List)
- ML20259C657 + (Containment Bldg:Main Feedwater Seismic - Restraints Details. Sheet 1)
- ML20259C651 + (Containment Bldg:Main Feedwater Seismic - Restraints Details. Sheet 2)