Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19210B694 + (Code Assessment & Applications Program:Investigation of Steam Void Collapse Water Hammer Initiating Mechanism)
- ML19326D634 + (Code Assessment & Applications Program:Piping Sys Stress Dependent Damping Study)
- ML19254F592 + (Code Assessment & Applications Program:Review & Evaluation of Actual & Potential Water Hammer Events in Nuclear Plants, Revision 1)
- ML19242A316 + (Code Assessment & Applications Program;Pretest Prediction of Semiscale Test S-07-10B)
- ML19289C717 + (Code Assessment & Applications,Assessment of RELAP4/MOD6 Thermal-Hydraulic Transient Code for PWR Experimental Applications, Volumes I & II)
- ML19220A832 + (Code Case 1492 Indicates That post-weld Heat Treatments of TMI Reactor Vessel Meet Stress Relief Time Requirements & Are in Compliance W/All Requirements of ASME Section III)
- ML16351A248 + (Code Case N-513-3 Evaluation of High Pressure Service Water Piping Thinning)
- ML021330264 + (Code Case N-566-1, Primary Coolant Pump Casing Stud Evaluation)
- ML23270B836 + (Code Case N-752 Audit September 26, 2023, E-mail Providing Additional Information Regarding the Use of Owners Requirements and Engineering Judgment in Lieu of Code and Standards)
- ML23269A041 + (Code Case N-752 Audit; August 22, 2023, E-mail Providing Additional Information Regarding Design and Quality Program Requirements)
- ML25111A012 + (Code Case N-752 Final RAIs (1))
- ML20014E606 + (Code Case N-871-1 - Status Update)
- ML22068A025 + (Code Case OMN-28 - Alternative Valve Position Verification Approach to Satisfy ISTC-3700 for Valves Not Susceptible to Stem-Disk Separation)
- ML20148U099 + (Code Dev & Analysis Prog,Blowdown(RELAP4/MOD7,Version2) Checkout & Demonstration Problems Interim Rept.Prog Provides fast-running,user-convenient Code Package Capable of Analyzing Transients in Continuous Mode)
- ML20148H930 + (Code Devel & Analysis Prog,Analysis Finite Element Code: Mods for Pettet-Cladding Mech Interaction Analysis. Describes Mods Made to Axisym Code to Adapt It for Fuel Rod Analysis & Compares It to FRACAS-II Code)
- ML20148H934 + (Code Development & Analysis Prog,Cladding Plastic Deformation(Cstres,Cstran,Cstrni,Caniso). Updated Section B-8(Cladding Stress Vs Strain)Of NATPRO-11 Handbook.New Data Measures Strain Under Biaxial Stress & Incl Error Estimate)
- ML19276F363 + (Code Development & Analysis Program Development Verification of FRAP-T5 Uncertainty Analysis Option)
- ML19276E828 + (Code Development & Analysis Program Embrittlement of Zircaloy Cladding Due to Oxygen Uptake, Status Rept)
- ML19269E517 + (Code Development & Analysis Program FRAPCON-2 Uncertainty Analysis Option)
- ML19289C719 + (Code Development & Analysis Program,Developmental Checkout of the Beacon/Mod2A Code. Presents Results of Tests Which Were Run to Investigate Different Models & Most Recent Version of Code)
- ML19269D373 + (Code Development & Analysis Program,Fuel Vapor Pressures)
- ML19323J285 + (Code Development & Analysis Program:Parametric Study on Cladding Surface Rewet, Technical Rept)
- ML20260J845 + (Code Information Guide)
- ML20198F535 + (Code Manual for Contain 2.0: a Computer Code for Nuclear Reactor Containment Analysis)
- ML20248M141 + (Code Manual for MACCS2.Preprocessor Codes COMIDA2, Fgrdcf, IDCF2)
- ML20248M139 + (Code Manual for MACCS2.Users Guide)
- SVP-02-033, Code Relief Request CR-38, Inservice Inspection Program Relief Re 10 Hour Annual Training Requirements of ASME Section XI, 1995 Edition with 1996 Addenda, Appendix VII + (Code Relief Request CR-38, Inservice Inspection Program Relief Re 10 Hour Annual Training Requirements of ASME Section XI, 1995 Edition with 1996 Addenda, Appendix VII)
- ML021510244 + (Code Relief Request, Alternative Repair Techniques for Reactor Vessel Heads CMP-16 & CMP-17)
- ML022550681 + (Code Relief, ASME Code Section XI, Inservice Inspection Program Requirements Related to Pressure Testing of Class 3 Components)
- ML022530006 + (Code Relief, ASME Code Section XI, Relief Request 5 Regarding Visual Examination of Insulted Bolting on Borated Systems)
- ML021420095 + (Code Relief, ASME Section XI, IST Program Relief Request Granted)
- ML031130007 + (Code Relief, Alternative to Required Volumetric Examination for Nozzles Where Plant Configuration Is Such That Visual Examination of Inner Radius May Be Performed on Essentially 100 Percent of Inner Radius)
- ML041890203 + (Code Relief, Evaluation of Relief Request No. 20, Revision 1 - for the Third 10-Year Inservice Inspection Interval)
- ML031180171 + (Code Relief, Evaluation of Relief Request 29 Concerning risk-informed Inservice Inspection, MB5698)
- ML032270201 + (Code Relief, Half-Nozzle Repair/Replacement for Bottom-Mounted Instrument Penetrations)
- ML021680062 + (Code Relief, Pilgrim Relief Request (PRR)-27 Relief from 1989 ASME Code Section XI Requirements for Certification of VT-2 Visual Examination Personnel)
- ML051110626 + (Code Relief, RPV Circumferential Shell Welds RR 1-ISI-19)
- ML021980013 + (Code Relief, Relief Request RV-13 to Delay Sr/V Setpoint Testing)
- ML041760065 + (Code Relief, Relief Request Re. Reactor Vessel Closure Head Penetration Repair and Flaw Characterization)
- ML022590457 + (Code Relief, Relief Request for the Second Ten-Year Interval Inservice Testing Program)
- ML031570139 + (Code Relief, Relief Valve Testing Requirements)
- ML020530440 + (Code Relief, Relief from ASME Code Requirements Related to the Inservice Inspection Program, Second 10-Year Interval, Relief Request S2-RR-B04)
- ML022030480 + (Code Relief, Relief from ASME Code Requirements Related to the Inservice Inspection Program, Second 10-Year Interval, Relief Request IR-2-21 Through IR-2-26)
- ML020240460 + (Code Relief, Relief from ASME Section XI, Appendix Viii, Supplement 11 Prior to Ultrasonic Examination of Class 1 Reactor Coolant System Weld Overlays)
- ML031540545 + (Code Relief, Relief from Volumetric Examination Requirements on Regenerative Heat Exchangers)
- ML040640600 + (Code Relief, Request for Approval to Use More Recent Inservice Testing Requirements for Pressure Relief Devices)
- ML020720145 + (Code Relief, Request for Relief from ASME Code Requirements for Inservice Inspection Pressure Test Program (Relief Request PR-07))
- ML022670220 + (Code Relief, Request for Revision to ASME Boiler & Pressure Vessel Code, Section XI to Allow Use of Proposed Risk-Informed Inservice Inspection Program (RI-ISI) as Alternative)
- ML031780941 + (Code Relief, Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Concerning Relief Requests B-7, Revision 1, B-8, Revision 1, B-9, Revision 1and C-6, Revision 1)
- ML051990330 + (Code Relief, Third 10-Year Inservice Inspection Interval Program Plan)
- ML023600184 + (Code Relief, Third Ten Year Inservice Inspection Interval Requests for Alternative/Relief Nos. 02-009 & 02-010 Associated with Repairs Made to Unit 1 Condenser Circulating Water Pump 1B)