Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19319E364 + (Chapter 4 of Rancho Seco PSAR, Rcs. Includes Revisions 1-4)
- ML19312A208 + (Chapter 4 of S&W SWESSAR-P1, Reactor)
- ML19309A555 + (Chapter 4 of VA Polytechnic Inst & State Univ Research & Training Reactor PSAR, Reactivity Transients)
- ML20128L887 + (Chapter 4 of Westinghouse RSAR, Coremelt Quantification)
- ML19319D681 + (Chapter 4 to Crystal River 3 & 4 PSAR, Rcs. Includes Revisions 1-10)
- ML20030A339 + (Chapter 4 to Final Hazards Summary Rept for Big Rock Point, Reactor)
- ML20049H276 + (Chapter 4 to Gessar, Reactor)
- ML20008D766 + (Chapter 4 to Midland 1 & 2 PSAR, Rcs. Includes Revisions 1-36)
- ML20030A445 + (Chapter 4 to Preliminary Hazards Summary Rept for Big Rock Point, Reactor Nuclear Characteristics)
- ML19347A385 + (Chapter 4 to State Univ of Ny at Buffalo Final Hazards Summary Rept,Revision 2, Reactor Description)
- ML19309C542 + (Chapter 4 to TMI-1 PSAR, Rcs. Includes Revisions 1-11)
- ML19341C523 + (Chapter 4 to Univ of Tx Triga Mark I RSAR, Rcs)
- ML20008E433 + (Chapter 4 to Yankee Rowe Final Hazards Summary Rept, Accidents & Hazards)
- ML20008E427 + (Chapter 4 to Yankee Rowe Preliminary Hazards Summary Rept, Plant Operation. Includes Revisions Through 581201)
- ML18025B026 + (Chapter 4, 5 and 9 Audit Summary for NuScale Power)
- ML20011D738 + (Chapter 4, Reactor to Updated Final Hazards Summary Rept for Big Rock Point Plant)
- ML20247G851 + (Chapter 4, Reactor, to CESSAR Sys 80+ Std Design)
- ML20207S273 + (Chapter 4, Reactor, to Nonproprietary RESAR-SP/90 Westinghouse Advanced Pwr,Module 10, Containment Sys)
- ML030090192 + (Chapter 4. Time-Limited Aging Analyses - Safety Evaluation Report Related to the License Renewal of McGuire Nuclear Station, Units 1 and 2, Catawba Nuclear Station, Units 1 and 2)
- ML19098B507 + (Chapter 5 (Pressure-Temperature Limits Report) Phase 2 SER)
- ML24290A011 + (Chapter 5 - Notices Instructions, and Reports to Workers)
- ML20321A099 + (Chapter 5 - Thermal Evaluation)
- ML25303A303 + (Chapter 5 - Us NRC Draft Safety Evaluation Related to the U.S. Sfr Owner, LLC Construction Permit Application for the Kemmerer Power Station Unit 1)
- ML022270680 + (Chapter 5 Draft SER with Open Items, Review by the Advisory Committee on Reactor Safeguards)
- ML19106A053 + (Chapter 5 P2 SER Reactor Coolant System and Connecting Systems)
- ML20343A195 + (Chapter 5 Shielding Evaluation)
- ML19329E138 + (Chapter 5 of AR Nuclear 1 PSAR, Containment Sys. Includes Revisions 1-18)
- ML19319C273 + (Chapter 5 of Davis-Besse PSAR, Containment. Includes Revisions 1-8)
- ML19322A786 + (Chapter 5 of Oconee 1,2 & 3 PSAR, Containment Sys. Includes Revisions 1-6)
- ML20106E678 + (Chapter 5 of RESAR-SP/90 Westinghouse Advanced PWR Module 7, Structural/Equipment Design, RCS & Connected Sys)
- ML20090J863 + (Chapter 5 of RESAR-SP/90 Westinghouse Advanced PWR Module 3, Introduction & Site, RCS & Connected Sys)
- ML20099J001 + (Chapter 5 of RESAR-SP/90 Westinghouse Advanced PWR Module 9, Instrumentation & Controls & Electric Power, RCS & Connected Sys)
- ML20128P727 + (Chapter 5 of RESAR-SP/90 Westinghouse Advanced PWR Module 11, Radiation Protection, RCS & Connected Sys)
- ML20084P676 + (Chapter 5 of RESAR-SP/90 Westinghouse Advanced PWR Module 2, Regulatory Conformance, Generic Safety Issues)
- ML19329D987 + (Chapter 5 of Rancho Seco PSAR, Containment Sys. Includes Revisions 1-4)
- ML19312A209 + (Chapter 5 of S&W SWESSAR-P1, RCS & Connected Sys)
- ML19309A558 + (Chapter 5 of VA Polytechnic Inst & State Univ Research & Training Reactor PSAR, Radiation Safety)
- ML19319D682 + (Chapter 5 to Crystal River 3 & 4 PSAR, Containment Sys. Includes Revisions 1-10)
- ML17138B574 + (Chapter 5 to Environ Qualification Rept for Class IE Equipment)
- ML20030A341 + (Chapter 5 to Final Hazards Summary Rept for Big Rock Poing, Reactor Sys Equipment)
- ML20049H278 + (Chapter 5 to Gessar, RCS & Connected Sys)
- ML20008D767 + (Chapter 5 to Midland 1 & 2 PSAR, Reactor Bldg & Structures. Includes Revisions 1-36)
- ML20008D768 + (Chapter 5 to Midland 1 & 2 PSAR, Reactor Bldg & Structures. Includes Revisions 1-36)
- ML20008D769 + (Chapter 5 to Midland 1 & 2 PSAR, Use of Coarse Aggregate W/Varied Percentage of Matl Passing Sieve 200. Prepared for Util)
- ML20030A446 + (Chapter 5 to Preliminary Hazards Summary Rept for Big Rock Point, Site & Environ)
- ML19347A386 + (Chapter 5 to State Univ of Ny at Buffalo Final Hazards Summary Rept,Revision 2, Reactivity Requirements)
- ML19309C543 + (Chapter 5 to TMI-1 PSAR, Containment Sys. Includes Revisions 1-11)
- ML19341C526 + (Chapter 5 to Univ of Tx Triga Mark I RSAR, Reactor Room)
- ML20008E434 + (Chapter 5 to Yankee Rowe Final Hazards Summary Rept, Plant Operation)
- ML20008E428 + (Chapter 5 to Yankee Rowe Preliminary Hazards Summary Rept, Accidents & Hazards. Includes Revisions Through 581201)
- ML18075A058 + (Chapter 5, Confinement - NUHOMS Eos System Updated Final Safety Analysis Report)