Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20011D737 + (Chapter 3, Design of Structures,Components,Equipment & Sys to Updated Final Hazards Summary Rept for Big Rock Point Plant)
- ML18029A130 + (Chapter 3, Seismic Subsystem Analysis, Section 3.7.3, GEH Advanced Boiling Water Reactor DC Renewal)
- ML030090176 + (Chapter 3. Aging Management Review Results - Safety Evaluation Report Related to the License Renewal of McGuire Nuclear Station, Units 1 and 2, Catawba Nuclear Station, Units 1 and 2)
- ML24290A010 + (Chapter 4 - Licensing Requirements for Source and Byproduct Material)
- ML030420557 + (Chapter 4 - Safety Evaluation Report with Open Items Related to the License Renewal of St. Lucie Nuclear Plant, Units 1 & 2)
- ML20321A098 + (Chapter 4 - Structural Evaluation)
- ML25303A301 + (Chapter 4 - Us NRC Draft Safety Evaluation Related to the U.S. Sfr Owner, LLC Construction Permit Application for the Kemmerer Power Station Unit 1)
- ML20343A194 + (Chapter 4 Containment Evaluation)
- ML022270664 + (Chapter 4 Draft SER with Open Items, Time-Limited Aging Analyses)
- ML19105B219 + (Chapter 4 P2 SER Reactor)
- ML19336B593 + (Chapter 4 Phase 4 SER with No Ols)
- ML19329E137 + (Chapter 4 of AR Nuclear 1 PSAR, Rcs. Includes Revisions 1-18)
- ML19319C272 + (Chapter 4 of Davis-Besse PSAR, Rcs. Includes Revisions 1-8)
- ML19322A784 + (Chapter 4 of Oconee 1,2 & 3 PSAR, Rcs. Includes Revisions 1-6)
- ML20084P674 + (Chapter 4 of RESAR-SP/90 Westinghouse Advanced PWR Module 2, Regulatory Conformance, Unresolved Safety Issue)
- ML20106E675 + (Chapter 4 of RESAR-SP/90 Westinghouse Advanced PWR Module 7, Structural/Equipment Design, Reactor)
- ML20128P703 + (Chapter 4 of RESAR-SP/90 Westinghouse Advanced PWR Module 11, Radiation Protection, Reactor)
- ML20090J860 + (Chapter 4 of RESAR-SP/90 Westinghouse Advanced PWR Module 3, Introduction & Site, Reactor)
- ML20099H994 + (Chapter 4 of RESAR-SP/90 Westinghouse Advanced PWR Module 9, Instrumentation & Controls & Electric Power, Reactor)
- ML19319E364 + (Chapter 4 of Rancho Seco PSAR, Rcs. Includes Revisions 1-4)
- ML19312A208 + (Chapter 4 of S&W SWESSAR-P1, Reactor)
- ML19309A555 + (Chapter 4 of VA Polytechnic Inst & State Univ Research & Training Reactor PSAR, Reactivity Transients)
- ML20128L887 + (Chapter 4 of Westinghouse RSAR, Coremelt Quantification)
- ML19319D681 + (Chapter 4 to Crystal River 3 & 4 PSAR, Rcs. Includes Revisions 1-10)
- ML20030A339 + (Chapter 4 to Final Hazards Summary Rept for Big Rock Point, Reactor)
- ML20049H276 + (Chapter 4 to Gessar, Reactor)
- ML20008D766 + (Chapter 4 to Midland 1 & 2 PSAR, Rcs. Includes Revisions 1-36)
- ML20030A445 + (Chapter 4 to Preliminary Hazards Summary Rept for Big Rock Point, Reactor Nuclear Characteristics)
- ML19347A385 + (Chapter 4 to State Univ of Ny at Buffalo Final Hazards Summary Rept,Revision 2, Reactor Description)
- ML19309C542 + (Chapter 4 to TMI-1 PSAR, Rcs. Includes Revisions 1-11)
- ML19341C523 + (Chapter 4 to Univ of Tx Triga Mark I RSAR, Rcs)
- ML20008E433 + (Chapter 4 to Yankee Rowe Final Hazards Summary Rept, Accidents & Hazards)
- ML20008E427 + (Chapter 4 to Yankee Rowe Preliminary Hazards Summary Rept, Plant Operation. Includes Revisions Through 581201)
- ML18025B026 + (Chapter 4, 5 and 9 Audit Summary for NuScale Power)
- ML20011D738 + (Chapter 4, Reactor to Updated Final Hazards Summary Rept for Big Rock Point Plant)
- ML20247G851 + (Chapter 4, Reactor, to CESSAR Sys 80+ Std Design)
- ML20207S273 + (Chapter 4, Reactor, to Nonproprietary RESAR-SP/90 Westinghouse Advanced Pwr,Module 10, Containment Sys)
- ML030090192 + (Chapter 4. Time-Limited Aging Analyses - Safety Evaluation Report Related to the License Renewal of McGuire Nuclear Station, Units 1 and 2, Catawba Nuclear Station, Units 1 and 2)
- ML19098B507 + (Chapter 5 (Pressure-Temperature Limits Report) Phase 2 SER)
- ML24290A011 + (Chapter 5 - Notices Instructions, and Reports to Workers)
- ML20321A099 + (Chapter 5 - Thermal Evaluation)
- ML25303A303 + (Chapter 5 - Us NRC Draft Safety Evaluation Related to the U.S. Sfr Owner, LLC Construction Permit Application for the Kemmerer Power Station Unit 1)
- ML022270680 + (Chapter 5 Draft SER with Open Items, Review by the Advisory Committee on Reactor Safeguards)
- ML19106A053 + (Chapter 5 P2 SER Reactor Coolant System and Connecting Systems)
- ML20343A195 + (Chapter 5 Shielding Evaluation)
- ML19329E138 + (Chapter 5 of AR Nuclear 1 PSAR, Containment Sys. Includes Revisions 1-18)
- ML19319C273 + (Chapter 5 of Davis-Besse PSAR, Containment. Includes Revisions 1-8)
- ML19322A786 + (Chapter 5 of Oconee 1,2 & 3 PSAR, Containment Sys. Includes Revisions 1-6)
- ML20106E678 + (Chapter 5 of RESAR-SP/90 Westinghouse Advanced PWR Module 7, Structural/Equipment Design, RCS & Connected Sys)
- ML20090J863 + (Chapter 5 of RESAR-SP/90 Westinghouse Advanced PWR Module 3, Introduction & Site, RCS & Connected Sys)
- ML20099J001 + (Chapter 5 of RESAR-SP/90 Westinghouse Advanced PWR Module 9, Instrumentation & Controls & Electric Power, RCS & Connected Sys)