Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20321A106 + (Chapter 11 - Operation Procedures and Systems Evaluation)
- ML18103A198 + (Chapter 11 Audit Report - June Through November 2017)
- ML20343A204 + (Chapter 11 Glossary)
- ML19015A051 + (Chapter 11 Phase 2 SER)
- ML19329E144 + (Chapter 11 of AR Nuclear 1 PSAR, Radwaste & Radiation Protection. Includes Revisions 1-18)
- ML19322A757 + (Chapter 11 of Oconee 1,2 & 3 PSAR, Radwaste & Radiation Protection. Includes Revisions 1-6)
- ML20090J881 + (Chapter 11 of RESAR-SP/90 Westinghouse Advanced PWR Module 3, Introduction & Site, Radwaste Mgt)
- ML20106E716 + (Chapter 11 of RESAR-SP/90 Westinghouse Advanced PWR Module 7, Structural/Equipment Design, Radwaste Mgt)
- ML20128P841 + (Chapter 11 of RESAR-SP/90 Westinghouse Advanced PWR Module 11, Radiation Protection, Radwaste Mgt)
- ML20099J113 + (Chapter 11 of RESAR-SP/90 Westinghouse Advanced PWR Module 9, Instrumentation & Controls & Electric Power, Radwaste Mgt)
- ML19329D993 + (Chapter 11 of Rancho Seco PSAR, Radwastes & Radiation Protection. Includes Revisions 1-4)
- ML19312A214 + (Chapter 11 of S&W SWESSAR-P1, Radwaste Mgt)
- ML19319D688 + (Chapter 11 to Crystal River 3 & 4 PSAR, Radwastes & Radiation Protection. Includes Revisions 1-10)
- ML19319C263 + (Chapter 11 to Davis-Besse PSAR, Radwastes & Radiation Protection. Includes Revisions 1-8)
- ML20030A354 + (Chapter 11 to Final Hazards Summary Rept for Big Rock Point, Operating Procedures)
- ML20049H286 + (Chapter 11 to Gessar, Radwaste Mgt)
- ML20008D785 + (Chapter 11 to Midland 1 & 2 PSAR, Radwastes. Includes Revisions 1-36)
- ML19309C548 + (Chapter 11 to TMI-1 PSAR, Radwastes & Radiation Protection. Includes Revisions 1-11)
- ML20011D759 + (Chapter 11, Radwaste Mgt to Updated Final Hazards Summary Rept for Big Rock Point Plant)
- ML20247H353 + (Chapter 11, Radwaste Mgt, to CESSAR Sys 80+ Std Design)
- ML20207S338 + (Chapter 11, Radwaste Mgt, to Nonproprietary RESAR-SP/90 Westinghouse Advanced Pwr,Module 10, Containment Sys)
- ML20321A107 + (Chapter 12 - Conduct of Operations Evaluation)
- ML101600490 + (Chapter 12 - Question 6 - Calculations)
- ML101600502 + (Chapter 12 - Question 8 - Calculation)
- ML101600498 + (Chapter 12 - Question 8 - FSAR Change Package)
- ML19015A137 + (Chapter 12 Phase 2 SER)
- ML19318E303 + (Chapter 12 Phase 4 SE - Clean Version OGC Reviewed NLO)
- ML19329E145 + (Chapter 12 of AR Nuclear 1 PSAR, Conduct of Operations. Includes Revisions 1-18)
- ML19319C265 + (Chapter 12 of Davis-Besse PSAR, Conduct of Operations. Includes Revisions 1-8)
- ML19322A759 + (Chapter 12 of Oconee 1,2 & 3 PSAR, Conduct of Operations. Includes Revisions 1-6)
- ML20128P852 + (Chapter 12 of RESAR-SP/90 Westinghouse Advanced PWR Module 11, Radiation Protection, Radiation Protection)
- ML20106E724 + (Chapter 12 of RESAR-SP/90 Westinghouse Advanced PWR Module 7, Structural/Equipment Design, Radiation Protection)
- ML20099J115 + (Chapter 12 of RESAR-SP/90 Westinghouse Advanced PWR Module 9, Instrumentation & Controls & Electric Power, Radiation Protection)
- ML20090J885 + (Chapter 12 of RESAR-SP/90 Westinghouse Advanced PWR Module 3, Introduction & Site, Radiation Protection)
- ML19329D994 + (Chapter 12 of Rancho Seco PSAR, Conduct of Operations. Includes Revisions 1-4)
- ML19312A215 + (Chapter 12 of S&W SWESSAR-P1, Radiation Protection)
- ML19319D689 + (Chapter 12 to Crystal River 3 & 4 PSAR, Conduct of Operations. Includes Revisions 1-10)
- ML20030A356 + (Chapter 12 to Final Hazards Summary Rept for Big Rock Point, Safety Analysis)
- ML20049H287 + (Chapter 12 to Gessar, Radiation Protection)
- ML20008D786 + (Chapter 12 to Midland 1 & 2 PSAR, Conduct of Operations. Includes Revisions 1-36)
- ML19309C549 + (Chapter 12 to TMI-1 PSAR, Conduct of Operations. Includes Revisions 1-11)
- ML20011D760 + (Chapter 12, Radiation Protection to Updated Final Hazards Summary Rept for Big Rock Point Plant)
- ML17065A197 + (Chapter 12, Radiation Protection, Section 12.2, Safety Evaluation with No Open Items, GEH Advanced Boiling Water Reactor DC Renewal)
- ML20247H394 + (Chapter 12, Radiation Protection, to CESSAR Sys 80+ Std Desing)
- ML20207S354 + (Chapter 12, Radiation Protection, to Nonproprietary RESAR/SP-90 Westinghouse Advanced Pwr,Module 10, Containment Sys)
- ML25303A311 + (Chapter 13 - Us NRC Draft Safety Evaluation Related to the U.S. Sfr Owner, LLC Construction Permit Application for the Kemmerer Power Station Unit 1)
- ML20321A108 + (Chapter 13 - Waste Management Evaluation (SL))
- ML19329E146 + (Chapter 13 of AR Nuclear 1 PSAR, Initial Tests & Operation. Includes Revisions 1-18)
- ML19322A761 + (Chapter 13 of Oconee 1,2 & 3 PSAR, Initial Tests & Operations. Includes Revisions 1-6)
- ML20099J131 + (Chapter 13 of RESAR-SP/90 Westinghouse Advanced PWR Module 9, Instrumentation & Controls & Electric Power, Conduct of Operations)
- ML20128P859 + (Chapter 13 of RESAR-SP/90 Westinghouse Advanced PWR Module 11, Radiation Protection, Conduct of Operations)