- ML19305B576 + (Azz Nuclear Group - Initial 10 CFR Part 21 Notification, F10 Series MCC Cubicle Connection Stab Alignment - Ref: P21-10042019-1)
- ML19289D969 + (Azz Nuclear Group Response to the U.S. Nuclear Regulatory Commission Inspection Report No. 99901471/2019-201 and Notice of Nonconformance)
- ML19053A499 + (Azz Nuclear Part 21 Report No. P21-02082019 Initial Notification of Potential Locfr Part 21, Eaton A200 Series Starters/Contactors)
- ML16252A274 + (Azz/Nli - Part 21 Report - Potential Allen Bradley Timing Relay)
- ML16194A199 + (Azz/Nli - Update - Report of Potential 10CFR Part 21, Allen Bradley Timing Relay Model 700RTC)
- ML19239A138 + (Azz/Nli Extension Request)
- ML19175A138 + (Azz/Nli Inspection Report)
- ML19310H398 + (B & B Environmental Safety, Inc. 04-29369-01)
- ML14267A224 + (B 2.1.1-1, Safety Limits, Reactor Core SLs Through B 2.1.2-4, RCS Pressure SL)
- ML14267A225 + (B 3.0-1, Limiting Condition for Operation (LCO) Applicability Through B 3.0-26, SR Applicability, Bases)
- ML12065A170 + (B 3.1 Reactivity Control Systems, B 3.1.1 Shutdown Margin (SDM))
- ML12065A172 + (B 3.1 Reactivity Control Systems, B 3.1.6 Control Bank Insertion Limits, Bases, Background)
- ML12065A171 + (B 3.1 Reactivity Control Systems, B 3.1.5 Shutdown Bank Insertion Limits, Bases, Background)
- ML14267A226 + (B 3.1.1-1, Reactivity Control Systems Through B 3.1.8-5, STE-Modes 1 and 2)
- ML14267A227 + (B 3.2.1-1, Power Distribution Limits Through B 3.2.5-0, Asi)
- ML14267A228 + (B 3.3.1-1, Rs Instrumentation-Operating Through B 3.3.12-5, Wide Range Logarithmic Neutron Flux Monitor Channels)
- ML14267A229 + (B 3.4.1-1, RCS Pressure, Temperature and Flow DNB Limits Through B 3.4.18-8, SG Tube Integrity)
- ML14267A230 + (B 3.5.1-1, Sits, Emergency Core Cooling System Through B 3.5.5-5, Stb)
- ML14267A231 + (B 3.6.1-1, Containment Systems Though B 3.6.8-4, Irs)
- ML030630468 + (B 3.7 Plant Systems, B 3.7.5 Auxiliary Feedwater (AFW) System)
- ML14267A232 + (B 3.7.1-1, Mssvs, Plant Systems Through B 3.7.17-2, SFP Storage)
- ML14267A233 + (B 3.8.1-1, AC Sources-Operating, Electrical Power Systems Through B 3.8.10-6, Distribution Systems-Shutdown)
- ML14267A234 + (B 3.9.1-1, Boron Concentration, Refueling Operating Through B 3.9.6-3, Refueling Pool Water Level)
- 05000400/FIN-2012008-01 + (B AND C MSIVs FAIL TO CLOSE DURING SURVEILLANCE TESTING)
- ML20260L220 + (B Building. Rev Date Illegible)
- 05000251/LER-2025-003, B Component Cooling Pump and Its Associated Breaker Inoperable + (B Component Cooling Pump and Its Associated Breaker Inoperable)
- 05000387/LER-2024-002, B Diesel Generator Inoperable Due to Failed Excitation System Linear Reactor + (B Diesel Generator Inoperable Due to Failed Excitation System Linear Reactor)
- ML20210T942 + (B Dilution by Hot Leg Injection)
- 05000354/LER-2022-001, B EDG Inoperable Resulting in a Condition Prohibited by Technical Specifications + (B EDG Inoperable Resulting in a Condition Prohibited by Technical Specifications)
- 05000400/FIN-2017002-02 + (B ESCW Chiller Failure to Start)
- 05000400/FIN-2015004-01 + (B ESW System Safety-Related Cables Submerged in Water)
- 05000413/LER-2025-003, B Emergency Diesel Generator Field Failed to Flash + (B Emergency Diesel Generator Field Failed to Flash)
- 05000456/LER-2018-002, B Emergency Diesel Generator Tripped on Overspeed During Testing Due to Broken Close-Assist Springs on the Turbocharger Inlet Butterfly Valve While the 1A Emergency Diesel Generator Was Inoperable + (B Emergency Diesel Generator Tripped on Overspeed During Testing Due to Broken Close-Assist Springs on the Turbocharger Inlet Butterfly Valve While the 1A Emergency Diesel Generator Was Inoperable)
- 05000368/LER-1980-078-03, B HPSI Pump 2P89B Tripped on Overcurrent.Caused by Motor Bearing Misalignment on Inboard Motor Bearing.Rotor Balanced & Motor Bells Replaced + (B HPSI Pump 2P89B Tripped on Overcurrent.Caused by Motor Bearing Misalignment on Inboard Motor Bearing.Rotor Balanced & Motor Bells Replaced)
- ML19178A207 + (B Hps MOU Final as of 100710)
- 05000270/LER-2021-001, B Motor Driven Emergency Feedwater Pump Past Inoperability Resulted in Condition Prohibited by Technical Specifications + (B Motor Driven Emergency Feedwater Pump Past Inoperability Resulted in Condition Prohibited by Technical Specifications)
- ML20132F177 + (B Power Station Public Inquiry, Vols 1 & 2 & Apps H,J,L & M)
- ML050060256 + (B Reactor Recirculation Pump Vibration Troubleshooting Summary)
- ML050060022 + (B Recirculation Pump Stuffing Box Measurements Summary)
- ML20132F215 + (B Review by Hm Nuclear Installations Inspectorate of Preconst Safety Rept)
- 05000400/FIN-2012004-02 + (B Startup Transformer Lockout Due to Loss of Oil Filled Cable Pressure)
- ML20090D921 + (B Steam Generator Control Valve Failure on 730722,RE Ginna Plant)
- 05000244/LER-2077-008, B Steam Generator Tube Leak + (B Steam Generator Tube Leak)
- 05000244/LER-2078-003, B Steam Generator Tube Leak + (B Steam Generator Tube Leak)
- 05000400/LER-2019-002, B Train Chiller for the Essential Services Chilled Water System Tripped on High Compressor Oil Temperature + (B Train Chiller for the Essential Services Chilled Water System Tripped on High Compressor Oil Temperature)
- 05000400/LER-2007-005, B Train of Essential Services Chilled Water Was Inoperable for a Period Longer than Allowed by Technical Specifications + (B Train of Essential Services Chilled Water Was Inoperable for a Period Longer than Allowed by Technical Specifications)
- L-2003-219, B to EPIP-13, Maintaining Emergency Preparedness - Emergency Exercises, Drills, Tests, and Evaluations + (B to EPIP-13, Maintaining Emergency Preparedness - Emergency Exercises, Drills, Tests, and Evaluations)
- ML19308B861 + (B&W & AR Power & Light Co Correspondence & Internal Memoranda Re Overpressurization of Nitrogen Supply Vent to Pressurizer,Pressurizer Level Setpoint & Pressurizer Electromatic Relief Valve Vent Mod)
- ML20204J540 + (B&W 177 FA Plant In-Core Detector Sys Uncertainty Using Monte Carlo Analysis)
- ML20024C498 + (B&W 177 FA-Type Plants)
- ML20024C506 + (B&W 177 FA-Type Plants Pressurizers)