Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Assembly.Sheet 1". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20263P077  + (Assembly Layout:General Service Cold Penetration Assembly Type C-1,C-2,C-3 & C-4)
  • ML20262E686  + (Assembly Reactor.Sheet 3 of 3)
  • ML20266B624  + (Assembly Rear Panel Itemiser)
  • ML20266B920  + (Assembly Side View)
  • ML20261H961  + (Assembly Transportation Shield 14-170 Series III Cask.Sheet 1 of 2)
  • ML20261H964  + (Assembly Transportation Shield 14-170 Series III Cask.Sheet 2 of 2)
  • ML20263J369  + (Assembly Transportation Shield HN-100 Series 3-A Certification. Sheet 1 of 1)
  • ML20264A381  + (Assembly Transportation Shield HN-100 Series 2. Sheet 1 of 1)
  • ML20263S422  + (Assembly Transportation Shield HN-100 Series 2. Sheet 1 of 1)
  • ML20263N556  + (Assembly Transportation Shield HN-600. Sheet 1 of 1)
  • ML20262L301  + (Assembly Transportation Shield HN-600. Sheet 1 of 1)
  • ML20259B797  + (Assembly Transportation Shield HN-600. Sheet 1 of 1)
  • ML20260B320  + (Assembly Transportation Shield Model HN-100 Series-2. Sheet 1 of 7)
  • ML20262C783  + (Assembly Transportation Shield Model HN-100 Series 3 Certification. Sheet 1 of 1)
  • ML20266H441  + (Assembly Transportation Shield Model HN100 Series 3 Certification. Sheet 1 of 1)
  • ML20259B660  + (Assembly Transportation Shield Model HN100 Series 3 Certification. Sheet 1 of 1)
  • ML20266E919  + (Assembly Transportation Shield Model HN100 Series-3 Certification. Sheet 1 of 1)
  • ML20263R462  + (Assembly Transportation Shield Model HN100 Series-3 Certification. Sheet 1 of 1)
  • ML20262B660  + (Assembly Transportation Shield Model HN100 Series-3 Certification. Sheet 1 of 1)
  • ML20261F732  + (Assembly Transportation Shield Model HN100 Series-3 Certification. Sheet 1 of 1)
  • ML20261J270  + (Assembly Transportation Shield Model HN100 SERIES-3 Certification.Sheet 1 of 1)
  • ML20263C272  + (Assembly Transportation Shield:Model HN100 Series-3 Certification. Sheet 1 of 1)
  • ML20262C728  + (Assembly Transportation Shield:Model HN100 Series-3 Certification. Sheet 1 of 1)
  • ML20259E056  + (Assembly Transportation Shield:Model HN100 Series-3 Certification. Sheet 1 of 1)
  • ML20260J138  + (Assembly,Argonne Transportation Sheild. Sheet 1 of 1)
  • ML20266G084  + (Assembly:Crd Housing Support Assembly Reactor. Sheet 1 of 2)
  • ML20260C134  + (Assembly:Transportation Shield,HN-100 Series-2. Sheet 1 of 1)
  • ML19324B765  + (Asserts Dissatisfaction About Delay in Releasing Rept of 890712 Insp to Public & Failure of Some NRC Officials in Responding to Author Inquiries)
  • ML19338F456  + (Asserts That Adequate Record Compiled & No Further Actions Necessary.Suggests That NRC Expedite Record Review & Issue Final Rule.Recommends Affirmative Findings Be Made)
  • ML20210U360  + (Asserts That Plant Designed,Constructed & Preoperationally Tested Consistent W/Fsar,Ser,Addl licensing-related Documents & NRC Regulations & Merits License,Per 830311 & 820408 Transmittals.Fsar Will Be Updated Per NRC)
  • ML19323B211  + (Asserts That Unshielded Steel Containment at Facility Is Insufficient to Contain Radiation.Condition Violates NUREG- 0578,Requirement 2.213 & Does Not Meet Minimal NRC Containment Integrity Requirements.Plant Must Be Shut Down)
  • 05000528/FIN-2010005-05  + (Assess Acceptability of Licensee-Approved Change to Fire Damper Test Frequency)
  • 05000482/FIN-2012008-12  + (Assess Cause of Normal Diesel Fire Pump Failure)
  • 05000285/FIN-2012009-03  + (Assess Corrective Actions and Determine Structural Effect of Water Intrusion and Boric Acid on Interior Containment Walls)
  • 05000482/FIN-2012008-05  + (Assess Impact of Emergency Diesel Generator Ground on Mission Time)
  • 05000482/FIN-2012008-11  + (Assess Impact of Failure of Temporary Pump to Match the Functionality of Diesel Fire Pump)
  • ML20014D655  + (Assess Lpr 2020 Memo - Lpr Schedule Part 1 Cy 2020)
  • 05000247/FIN-2006005-03  + (Assess Reliability / Unavailability of the Gas Turbine System and Impacts on Functionality)
  • 05000482/FIN-2012008-13  + (Assess Security Power Supply Anomaly)
  • 05000413/FIN-2006010-01  + (Assess the Overall Increase In Station Risk Resulting From the Combination Of Unsealed Electrical Conduits Entering the 1A DG Room And Turbine Buildings and Floodpaths Into the SSF)
  • ML20125B975  + (Assesses Change in large-scale Stress Tests Proposed by DOE at 850522 Meeting in Washington,Dc.Testing Program Described by Baker Inconsistent W/Hydraulic Property Testing Stated in STP 1.1)
  • ML19220B332  + (Assesses Generic Implications of Fire in safety-related Motor Control Center at Tmi.Ie Circular Will Be Issued Instead of Bulletin)
  • ML19220C622  + (Assesses Impact of TMI Incident on Existing Emergency Control Ctr Bypass Programs.Analysis & Reporting Expected to Slip Due to Diversion of Key Staff)
  • ML20080Q607  + (Assesses Operability of Purge & Vent Valves in Light of Concerns Outlined in Ser.Valves Will Be Opened to No More than 30 Degrees & Will Close from 30 Degrees Open Position in Event of DBA-LOCA)
  • ML20235C944  + (Assesses Plant Application for Ol,Per 740821 Agreement to Render Technical Assistance.No Const or Licensing Delays Anticipated Pending Resolution of Concern Re Dynamic Loads on Containment Resulting from LOCA & Relief Valve Action)
  • ML20050D043  + (Assesses Probable Consequences If Commission Decides to Review ALAB-590,eliminating Bases Requirement for Admission of Contention)
  • ML19350B956  + (Assesses R&D Associates, Some Hydrogen Control Considerations for Ice-Condenser Nuclear Plants. Test Results Confirm Statepoint Determinations in Steam Test Series.Fog Coagulation Needs More Research)
  • ML19221A479  + (Assesses RCS Behavior in Percolating Mode Before Buildup of Large Amounts of Noncondensibles)
  • ML19338F474  + (Assesses Util Capability to Implement near-term NRC Action Plan Requirements (NUREG 0660) & Proposed Schedule.Plan Items Re Implementation Status,Proposed Implementation Plan & Current Shift Technical Advisor Training Program Encl)
  • ML19276E424  + (Assessing Impact of Nuclear Power Plants on Environ, Second Annual Research Progress Rept)