Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20263P077 + (Assembly Layout:General Service Cold Penetration Assembly Type C-1,C-2,C-3 & C-4)
- ML20262E686 + (Assembly Reactor.Sheet 3 of 3)
- ML20266B624 + (Assembly Rear Panel Itemiser)
- ML20266B920 + (Assembly Side View)
- ML20261H961 + (Assembly Transportation Shield 14-170 Series III Cask.Sheet 1 of 2)
- ML20261H964 + (Assembly Transportation Shield 14-170 Series III Cask.Sheet 2 of 2)
- ML20263J369 + (Assembly Transportation Shield HN-100 Series 3-A Certification. Sheet 1 of 1)
- ML20264A381 + (Assembly Transportation Shield HN-100 Series 2. Sheet 1 of 1)
- ML20263S422 + (Assembly Transportation Shield HN-100 Series 2. Sheet 1 of 1)
- ML20263N556 + (Assembly Transportation Shield HN-600. Sheet 1 of 1)
- ML20262L301 + (Assembly Transportation Shield HN-600. Sheet 1 of 1)
- ML20259B797 + (Assembly Transportation Shield HN-600. Sheet 1 of 1)
- ML20260B320 + (Assembly Transportation Shield Model HN-100 Series-2. Sheet 1 of 7)
- ML20262C783 + (Assembly Transportation Shield Model HN-100 Series 3 Certification. Sheet 1 of 1)
- ML20266H441 + (Assembly Transportation Shield Model HN100 Series 3 Certification. Sheet 1 of 1)
- ML20259B660 + (Assembly Transportation Shield Model HN100 Series 3 Certification. Sheet 1 of 1)
- ML20266E919 + (Assembly Transportation Shield Model HN100 Series-3 Certification. Sheet 1 of 1)
- ML20263R462 + (Assembly Transportation Shield Model HN100 Series-3 Certification. Sheet 1 of 1)
- ML20262B660 + (Assembly Transportation Shield Model HN100 Series-3 Certification. Sheet 1 of 1)
- ML20261F732 + (Assembly Transportation Shield Model HN100 Series-3 Certification. Sheet 1 of 1)
- ML20261J270 + (Assembly Transportation Shield Model HN100 SERIES-3 Certification.Sheet 1 of 1)
- ML20263C272 + (Assembly Transportation Shield:Model HN100 Series-3 Certification. Sheet 1 of 1)
- ML20262C728 + (Assembly Transportation Shield:Model HN100 Series-3 Certification. Sheet 1 of 1)
- ML20259E056 + (Assembly Transportation Shield:Model HN100 Series-3 Certification. Sheet 1 of 1)
- ML20260J138 + (Assembly,Argonne Transportation Sheild. Sheet 1 of 1)
- ML20266J088 + (Assembly.Sheet 1)
- ML20266G084 + (Assembly:Crd Housing Support Assembly Reactor. Sheet 1 of 2)
- ML20260C134 + (Assembly:Transportation Shield,HN-100 Series-2. Sheet 1 of 1)
- ML19324B765 + (Asserts Dissatisfaction About Delay in Releasing Rept of 890712 Insp to Public & Failure of Some NRC Officials in Responding to Author Inquiries)
- ML19338F456 + (Asserts That Adequate Record Compiled & No Further Actions Necessary.Suggests That NRC Expedite Record Review & Issue Final Rule.Recommends Affirmative Findings Be Made)
- ML20210U360 + (Asserts That Plant Designed,Constructed & Preoperationally Tested Consistent W/Fsar,Ser,Addl licensing-related Documents & NRC Regulations & Merits License,Per 830311 & 820408 Transmittals.Fsar Will Be Updated Per NRC)
- ML19323B211 + (Asserts That Unshielded Steel Containment at Facility Is Insufficient to Contain Radiation.Condition Violates NUREG- 0578,Requirement 2.213 & Does Not Meet Minimal NRC Containment Integrity Requirements.Plant Must Be Shut Down)
- 05000528/FIN-2010005-05 + (Assess Acceptability of Licensee-Approved Change to Fire Damper Test Frequency)
- 05000482/FIN-2012008-12 + (Assess Cause of Normal Diesel Fire Pump Failure)
- 05000285/FIN-2012009-03 + (Assess Corrective Actions and Determine Structural Effect of Water Intrusion and Boric Acid on Interior Containment Walls)
- 05000482/FIN-2012008-05 + (Assess Impact of Emergency Diesel Generator Ground on Mission Time)
- 05000482/FIN-2012008-11 + (Assess Impact of Failure of Temporary Pump to Match the Functionality of Diesel Fire Pump)
- ML20014D655 + (Assess Lpr 2020 Memo - Lpr Schedule Part 1 Cy 2020)
- 05000247/FIN-2006005-03 + (Assess Reliability / Unavailability of the Gas Turbine System and Impacts on Functionality)
- 05000482/FIN-2012008-13 + (Assess Security Power Supply Anomaly)
- 05000413/FIN-2006010-01 + (Assess the Overall Increase In Station Risk Resulting From the Combination Of Unsealed Electrical Conduits Entering the 1A DG Room And Turbine Buildings and Floodpaths Into the SSF)
- ML20125B975 + (Assesses Change in large-scale Stress Tests Proposed by DOE at 850522 Meeting in Washington,Dc.Testing Program Described by Baker Inconsistent W/Hydraulic Property Testing Stated in STP 1.1)
- ML19220B332 + (Assesses Generic Implications of Fire in safety-related Motor Control Center at Tmi.Ie Circular Will Be Issued Instead of Bulletin)
- ML19220C622 + (Assesses Impact of TMI Incident on Existing Emergency Control Ctr Bypass Programs.Analysis & Reporting Expected to Slip Due to Diversion of Key Staff)
- ML20080Q607 + (Assesses Operability of Purge & Vent Valves in Light of Concerns Outlined in Ser.Valves Will Be Opened to No More than 30 Degrees & Will Close from 30 Degrees Open Position in Event of DBA-LOCA)
- ML20235C944 + (Assesses Plant Application for Ol,Per 740821 Agreement to Render Technical Assistance.No Const or Licensing Delays Anticipated Pending Resolution of Concern Re Dynamic Loads on Containment Resulting from LOCA & Relief Valve Action)
- ML20050D043 + (Assesses Probable Consequences If Commission Decides to Review ALAB-590,eliminating Bases Requirement for Admission of Contention)
- ML19350B956 + (Assesses R&D Associates, Some Hydrogen Control Considerations for Ice-Condenser Nuclear Plants. Test Results Confirm Statepoint Determinations in Steam Test Series.Fog Coagulation Needs More Research)
- ML19221A479 + (Assesses RCS Behavior in Percolating Mode Before Buildup of Large Amounts of Noncondensibles)
- ML19338F474 + (Assesses Util Capability to Implement near-term NRC Action Plan Requirements (NUREG 0660) & Proposed Schedule.Plan Items Re Implementation Status,Proposed Implementation Plan & Current Shift Technical Advisor Training Program Encl)
- ML19276E424 + (Assessing Impact of Nuclear Power Plants on Environ, Second Annual Research Progress Rept)