Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML22354A276 + (13. Proposed Technical Specifications Appendix C for CoC No. 1026, Renewed Amendment No. 2)
- ML23068A397 + (13. Renewed Certificate of Compliance No. 1014, Amendment No. 3, Appendix B)
- ML17291B265 + (13.6.1 Physical Security - Combined License and Operating Reactors)
- ML20261K097 + (13.8 Kv Buses 1F 1G 1H Power Supply Parallel Alarm Logic Diagram System:Pc)
- ML20260D380 + (13.8 Kv Buses 1F 1G 1H Power Supply Parallel Alarm Logic Diagram System:Pc. Actual Drawing NUMBER:4Z-01-9-Z-40464 1)
- ML20261K087 + (13.8 Kv Buses 1F,1G,1H,Supply Bkrs from Unit 2 Standby Xfmr Logic Diagram System:Pc)
- ML20265C845 + (13.8 Kv Emerg Bus Supply Bkr Logic Diagram System:Pg)
- ML20265C833 + (13.8 Kv Emerg Feeder Bkrs to Aux ESF Xfmrs Logic Diagram System:Pg)
- ML20261K102 + (13.8 Kv Emerg Feeder Bkrs to Aux ESF Xfmrs Logic Diagram System:Pg)
- ML20260D385 + (13.8 Kv Feeder Bkrs to Aux ESF Xfmrs Logic Diagram System: Pc. Actual Drawing NUMBER:5Z-01-9-Z-40465 1)
- ML20261K093 + (13.8 Kv Feeder Bkrs to Aux ESF Xfmrs Logic Diagram System: Pc)
- ML20261H963 + (13.8 Kv and 4.16 Kv Switchgear Internals)
- ML20260D377 + (13.8KV Buses 1F,1G,1H,SUPPLY Bkrs from Unit 2 Standby Xfmr Logic Diagram System:Pc. Actual Drawing NUMBER:4Z-01-9-Z-40463 1)
- ML20260D372 + (13.8KV Buses 1F,1G,1H,SUPPLY Bkrs from Unit 1 Standby Xfmr Logic Diagram System:Pc. Actual Drawing NUMBER:4Z-01-9-Z-40462 1)
- ML20260D364 + (13.8KV Buses 1F,1G,1H,TIE Bkrs Logic Diagram System:Pc. Actual Drawing NUMBER:4Z-01-9-Z-40460 1)
- ML20260D391 + (13.8KV Emerg Feeder Bkrs to Aux ESF Xfmrs Logic Diagram System:Pg. Actual Drawing NUMBER:6Z-01-9-Z-40466 1)
- ML20264D102 + (13.8KV One Line Diagram:Emer Bus 2EPS*SWG001,002,003 & 004 Norm Bus 2NPS-SWG004 & 005)
- ML20264D091 + (13.8KV One Line Diagram:Normal Bus 2NPS-SWG001. Rev Date Illegible)
- ML20264D096 + (13.8KV One Line Diagram:Normal Bus 2NPS-SWG002)
- ML20264D098 + (13.8KV One Line Diagram:Normal Bus 2NPS-SWG003)
- ML20261M012 + (13.8kV Buses 1F,1G,1H Supply Bkrs from Unit 1 Standby Xfmr Logic Diagram System:Pc)
- ML20261M006 + (13.8kV Buses 1F,1G,1H Supply Bkrs from UAT Logic Diagram System:Pc)
- ML20261L999 + (13.8kV Buses 1F,1G,1H,Tie Bkrs Logic Diagram System:Pc)
- ML20261K106 + (13.8kV Feeder Bkrs to Aux BOP Xfmrs Logic Diagram System: Pc)
- ML26006A148 + (13.a. PRA Realism Workshop (ASP Program and RASP Handbook Update))
- ML18267A088 + (1300 CS LAS SS LF-GF)
- ML24295A220 + (1300 Houston - Comparison of Seismic Responses of Deeply Embedded and Surface Supported Structures)
- L-2015-272, 1301103.401, Revision 0, Flaw Tolerance Evaluation of St. Lucie Surge Line Welds Using ASME Code Section XI, Appendix L, May 2015 + (1301103.401, Revision 0, Flaw Tolerance Evaluation of St. Lucie Surge Line Welds Using ASME Code Section XI, Appendix L, May 2015)
- ML013090004 + (130th ACNW Agenda Meeting, November 27-29, 2001)
- ML20266E260 + (13108 Cpk Exchanger.Sheet 1.Actual Drawing Number: MCM 1301.00-0050)
- ML24295A222 + (1320 Tabbakhha - Evaluating Soil-Structure Interaction Effects in Seismic Risk Assessment for Spent Fuel Storage Systems)
- ML020150120 + (132nd ACNW Meeting Agenda February 7-8, 2002)
- ML18267A091 + (1330 Simplified E-P Analysis)
- ML24295A223 + (1340 Jeremic - Assessing and Increasing Resilience of Nuclear Energy Soil-Structure Systems for Dynamic/Seismic Loads)
- ML021820496 + (136th ACNW Agenda Meeting, July 23-25, 2002)
- ML20265C839 + (138 Kv Circuit Switcher & Ground Switch Logic Diagram System:Pg)
- 05000334/LER-1983-002-03, 138-kV Bus 1 Lost.Caused by Inadvertent Operation of Bus back-up Timer Relay 62-Z41. Sbfu & Sru Relays Interchanged,Sbfu Relays Modified & Physical Barrier Around Sbfu Switch Installed + (138-kV Bus 1 Lost.Caused by Inadvertent Operation of Bus back-up Timer Relay 62-Z41. Sbfu & Sru Relays Interchanged,Sbfu Relays Modified & Physical Barrier Around Sbfu Switch Installed)
- ML031640529 + (13RFO, CRDM Nozzle, Examination Report)
- ML25163A021 + (13a - EPRI Project - Hot Cell Exam of Core Barrel Specimens)
- ML22143A831 + (13a: BWRVIP-100 Update)
- ML22143A832 + (13b: EPRI-MRP - PWROG Irrad SS Fracture Toughness Update)
- ML20137N750 + (13th Annual Progress Rept of Pennsylvania State Univ Breazeale Nuclear Reactor,Jul 1984 - June 1985)
- ML18193A745 + (14)
- ML25163A113 + (14 - Advanced Reactor Materials Overview)
- ML24173A139 + (14 - Auxiliary Piping Stress Corrosion Cracking Operating Experience Focus Group and Industry Coordination)
- ML18142A461 + (14 - BWRVIP ISP SLR)
- ML25016A279 + (14 - Discussion on UT in Lieu of RT for Construction)
- ML23152A170 + (14 - NRC - PWSCC Initiation)
- ML21217A263 + (14 - NRC - Update on License Renewal for 40 Years and Research on 100 Years - August 11, 2021)
- ML20262B815 + (14 215 Cask Assembly.Sheet 1 of 2)
- ML20262B804 + (14 215 Cask Assembly.Sheet 1 of 2)