Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5 +
- RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5 +
- RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5 +
- RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 5 +
- RIS 2013-07, NRC Staff Position on the Use of American Society of Mechanical Engineers Certification Mark +
- RIS 2011-07, New York State (NYS) Pre-Filed Evidentiary Hearing Exhibit Nys000310, NRC Regulatory Issue Summary 2011-07 License Renewal Submittal Information for Pressurized Water Reactor Internals Aging Management +
- RIS 2010-07, Regulatory Requirements For Application of Weld Overlays and Other Mitigation Techniques in Piping Systems Approved for Leak-Before-Break +
- RIS 2009-07, Status Update for Implementation of NRC Regulatory Authority for Certain Naturally Occurring and Accelerator-Produced Radioactive Material +
- RIS 2007-07, Clarification of Increased Controls for Licensees That Possess Collocated Radioactive Material During Transportation Activities +
- RIS 2006-07, Proposed Changes to the Safety System Unavailability Performance Indicators +
- RIS 2005-07, Performance of Manual Actions to Satisfy the Requirements of 10 CFR Part 50 Appendix R Section Iii.G.2 +
- RIS 2001-07, 10 CFR 50.75(f)(1) Reports on the Status of Decommissioning Funds (Due March 31, 2001) +
- RIS 2000-07, Use of Risk Informed Decision Making in License Amendment Reviews +
- RIS 2010-07, Regulatory Requirements for Application of Weld Overlays and Other Mitigation Techniques in Piping Systems Approved for Leak-Before-Break +
- RIS 2005-07, Performance of Manual Actions to Satisfy the Requirements of 10 CFR Part 50 Appendix R Section III.G.2 +
- RIS 2016-07, Containment Shell or Liner Moisture Barrier Inspection +
- RIS 2015-07, Withdrawn NRC Regulatory Issue Summary 2015-07, Process for Scheduling and Allocating Resources in FY2017 for the Review of New Licensing Applications for Large Light Water Reactors and Small Modular Reactors +
- RIS 2014-07, Enhancements to the Vendor Inspection Program - Vendor Information Request +
- RIS 2012-07, Withdrawn NRC Regulatory Issue Summary 2012-07 Preparation and Scheduling of Operator Licensing Examinations +
- RIS 2011-07, New York State (NYS) Pre-Filed Evidentiary Hearing Exhibit NYS000310, NRC Regulatory Issue Summary 2011-07 License Renewal Submittal Information for Pressurized Water Reactor Internals Aging Management +
- RIS 2008-07, Dose Limit for Patient Release Under 10 CFR 35.75 +
- RIS 2004-07, Release of Final Standard (RS)-002, Processing Applications for Early Site Permits +
- RIS 2003-07, Issuance of Regulations Revising Filing Requirements for Advance Notification of the Shipment of Spent Nuclear Fuel and Special Nuclear Material +
- RIS 2002-07, Subject, Clarification of NRC Requirements Applicable to Worker Fatigue and Self-Declarations of Fitness-For-Duty +