Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RIS 2015-03, Identifying and Reporting Security Incidents Under 10 CFR Part 37 +
- RIS 2014-03, Withdrawn - NRC Regulatory Issue Summary 2014-03, Notice of 10 CFR Part 37 Implementation Deadline for NRC Licensees +
- RIS 2013-03, Pre-Application Communication and Scheduling for Medical Radioisotope Production Facilities Intending to Produce Molybdenum-99 +
- RIS 2012-03, Reintegration of Security Into The Reactor Oversight Process Assessment Program +
- RIS 2010-03, Withdrawn NRC Regulatory Issue Summary 2010-03 Licensing Submittal Information for Small and Modular Reactor Designs +
- RIS 2008-03, Return/Reuse of Water Containing Previously Discharged Radioactive Effluents from Operating Nuclear Power Plants +
- RIS 2007-03, Ionizing Radiation Warning Symbol +
- RIS 2005-03, 10 CFR Part 40 Exemptions for Uranium Contained in Aircraft Counterweights - Storage and Repair +
- RIS 2004-03, NRC Regulatory Issues Summary (RIS) 2004-03, Revision 1: Risk-Informed Approach for Post-Fire Safe-Shutdown Circuit Inspection (Formerly RIS 2004-003) +
- RIS 1999-03, Resolution of Generic Issue 145, Actions to Reduce Common-Cause Failures +
- RIS 2001-03, Changes, Tests, and Experiments +
- RIS 2000-03, Resolution of Safety Issue 158: Performance of Safety Related Power-Operated Valves Under Design Basis Conditions +
- RIS 2012-03, Reintegration of Security Into the Reactor Oversight Process Assessment Program +
- RIS 2018-03, National Terrorism Advisory System and Protective Measures for the Physical Protection of Category 1 and Category 2 Quantities of Radioactive Material +
- RIS 2019-03, Pre-Application Communication and Scheduling for Accident Tolerant Fuel Submittals +
- RIS 2022-03, NRC Plans to Establish Controlled Unclassified Information-Sharing Agreements with Non-Executive Branch Entities +
- RIS 2016-03, 10 CFR 50.59 Issues Identified in NRCs San Onofre Steam Generator Tube Degradation Lessons Learned Report +
- RIS 2011-03, Issuance of SFST-14, Acceptance Review Process +
- RIS 2009-03, Withdrawn NRC Regulatory Issue Summary 2009-03: Process for Scheduling Acceptance Reviews of New Reactor Licensing Applications After April 2009 and Process for Determining Budget Needs for Fy 2011 +
- RIS 2006-03, Guidance on Requesting an Exemption from Biennial Emergency Preparedness Exercise Requirements +
- RIS 2003-03, Release of Draft Review Standard (Rs) 002, Processing Applications for Early Site Permits, for Interim Use +
- RIS 2002-03, Guidance for Submitting Measurement Uncertainty Recapture Power Uprate Applications +
- RIS 2017-03, Preparation and Scheduling of Operator Licensing Examinations +
- RIS 2025-03, Preparation and Scheduling of Operator Licensing Examinations +