Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RIS 2000-13, Annual Report On the Effectiveness of Training in the Nuclear Industry for Calendar Year 1999 + (13)
- RIS 2000-13, Annual Report on the Effectiveness of Training in the Nuclear Industry for Calendar Year 1999 + (13)
- RIS 2004-13, Consideration of Sheltering in Licensee'S Range of Protective Action Recommendations + (13)
- RIS 2015-13, Seismic Stability Analysis Methodologies for Spent Fuel Dry Cask Loading Stack-up Configuration + (13)
- RIS 2006-13, NRC000046-NRC Regulatory Issue Summary 2006-13, Information on the Changes Made to the Reactor Oversight Process to More Fully Address Safety Culture + (13)
- RIS 2008-13, Status and Status and Plans for Implementation of NRC Regulatory Authority for Certain Naturally-Occurring and Accelerator-Produced Radioactive Material + (13)
- RIS 2009-13, Emergency Response Data System Upgrade from Modem to Virtual Private Network Appliance + (13)
- RIS 2007-13, Verification of the Authenticity of Materials Possession Licenses + (13)
- RIS 2005-13, NRC Incident Response and the National Response Plan + (13)
- RIS 2004-13, Consideration of Sheltering in Licensees Range of Protective Action Recommendations, Dated August 2004 + (13)
- RIS 2003-13, NRC Review of Responses to Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity + (13)
- RIS 2002-13, Confirmation of Employment Eligibility + (13)
- RIS 2013-14, Reporting Transactions Involving Temporary Jobsites to the National Source Tracking System + (14)
- RIS 2011-14, Metal Fatigue Analysis Performed By Computer Software + (14)
- RIS 2009-14, Licensing Approach for In-Situ Recovery Facility Application Scenarios + (14)
- RIS 2007-14, Fingerprinting Requirements for Licensees Implementing the Increased Control Order + (14)
- RIS 2006-14, NRC Regulatory Issue Summary - Enforcement Requirements for Facility Changes Under 10 CFR 70.72 (c) (2) + (14)
- RIS 2004-14, Focusing Resources in the Office of Nuclear Reactor Regulation As a Result of Review of Security Plan Changes + (14)
- RIS 2003-14, Withdrawn NRC RIS-2003-014: Preparation and Scheduling of Operator Licensing Examinations + (14)
- RIS 2002-14, Proposed Changes to the Safety System Unavailability Performance Indicators + (14)
- RIS 2001-14, Update of Evacuation Time Estimates Position on Reportability Requirements for Reactor Core Isolation Cooling System Failure + (14)
- RIS 2000-14, Withdrawn NRC Regulatory Issue Summary 2000-014: Preparation and Scheduling of Operator Licensing Examinations + (14)
- RIS 2011-14, Metal Fatigue Analysis Performed by Computer Software + (14)
- RIS 2006-14, NRC Regulatory Issue Summary - Enforcement Requirements for Facility Changes Under 10 CFR 70.72 (C) (2) + (14)
- RIS 2004-14, Focusing Resources in the Office of Nuclear Reactor Regulation as a Result of Review of Security Plan Changes + (14)
- RIS 2015-14, Issuance of Enforcement Guidance Memorandum - Emergency Plan and Emergency Plan Implementing Procedure Updates + (14)
- RIS 2008-14, Use of TORMIS Computer Code for Assessment of Tornado Missile Protection + (14)
- RIS 2005-14, Clarification of Implementing Guidance for Compensatory Measures Related to Access Authorization Orders + (14)
- RIS 2014-14, Clarification of Information Security Requirements for Non-Power Reactor Licensees + (14)
- RIS 2015-15, Information Regarding a Specific Exemption in the Requirements for the Physical Protection of Category 1 and Category 2 Quantities of Radioactive Material + (15)
- RIS 2008-15, NRC Staff Position on Crediting Mitigating Strategies Implemented in Response to Security Orders in Risk-informed Licensing Actions and in the Significance Determination Process + (15)
- RIS 2007-15, Unescorted Access to Materials for Non-Manufacturer and Distributor Service Providers + (15)
- RIS 2006-15, Withdrawn NRC Regulatory Issue Summary 2006-15 Preparation and Scheduling of Operator Licensing Examinations + (15)
- RIS 2002-15, OMB Control No.: 3150-0002 NRC Regulatory Issue Summary 2002-15 NRC Approval of Commercial Data Encryption Systems for the Electronic Transmission of Safeguards Information + (15)
- RIS 2005-15, Reporting Requirements for Damaged Industrial Radiographic Equipment + (15)
- RIS 2001-15, Update of Evacuation Time Estimates Performance of DC-Powered Motor-Operated Valve Actuators + (15)
- RIS 2000-15, Recommendations for Ensuring Continued Safe Plant Operation and Minimizing Requests for Enforcement Discretion During Extreme Weather Conditions + (15)
- RIS 2003-15, NRC Regulatory Issue Summary, Consolidation of Region I & Region II Materials Program + (15)
- RIS 2015-16, Planned Licensing Action Submittals for All Power Reactor Licensees + (16)
- RIS 2013-16, Withdrawn - NRC Regulatory Issue Summary 2013-16, Interactions Between The NRC And NRC Stakeholders During a Lapse Of Agency Appropriations + (16)
- RIS 2007-16, U.S. Nuclear Regulatory Commission Regulatory Issue Summary of 2007-16. Revision 1: Implementation of the Requirements of 10 CFR 54.37(b) for Holders of Renewed Licenses + (16)
- RIS 2008-16, Withdrawn NRC Regulatory Issue Summary 2008-16: Preparation and Scheduling of Operator Licensing Examinations + (16)
- RIS 2007-16, Implementation of the Requirements of 10 CFR 54.37(b) for Holders of Renewed Licenses + (16)
- RIS 2003-16, Withdrawn NRC Regulatory Issue Summary 2003-016: NRC Threat Advisory and Protective Measures System + (16)
- RIS 2002-16, Current Incident Response Issues + (16)
- RIS 2001-16, Update of Evacuation Time Estimates + (16)
- RIS 2000-16, Availability of the Reactor Vessel Integrity Database Version 2.0.1 + (16)
- RIS 2004-16, Draft RAI, Extend the First Period of the Fourth 10-year Inservice Inspection Interval + (16)
- RIS 2013-16, Withdrawn - NRC Regulatory Issue Summary 2013-16, Interactions Between the NRC and NRC Stakeholders During a Lapse of Agency Appropriations + (16)
- RIS 2005-16, Issuance of NRC Management Directive 8.17, Licensee Complaints Against NRC Employees + (16)
- RIS 2006-16, Transfer of Management Oversight of Region I Licensees to Region IV + (16)
- RIS 2013-17, Resuming Normal Interactions Between the NRC and NRC Stakeholders Following an Agency Shutdown + (17)
- RIS 2007-17, Withdrawn NRC Regulatory Issue Summary 2007-017: Preparation and Scheduling of Operator Licensing Examinations + (17)
- RIS 2004-17, NRC Regulatory Issue Summary (RIS) 2004-17, Revision 1, Decay-In-Storage Provisions for the Storage of Radioactive Waste Containing Byproduct Material + (17)
- RIS 2006-17, NRC Staff Position on the Requirements of 10 CFR 50.36, Technical Specification, with Respect to Limiting Safety System Settings (LSSS) During Periodic Testing and Calibration of Instrument Channels + (17)
- RIS 2004-17, Revised Decay-in-Storage Provisions for the Storage of Radioactive Waste Containing Byproduct Material + (17)
- RIS 2003-17, Complying with 10 CFR 35.59, Recentness of Training, For Board-Certified Individuals Whose Training and Experience Were Completed More than 7 Years Ago + (17)
- RIS 2002-17, Guidance on Performing Military Service Verification + (17)
- RIS 2001-17, Withdrawn NRC Regulatory Issue Summary 2001-017: Preparation and Scheduling of Operator Licensing Exams + (17)