Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NRC Generic Letter 81-34, Safety Concerns Associated with Pipe Breaks in the BWR Scram System + (Safety Concerns Associated with Pipe Breaks in the BWR Scram System)
- NRC Generic Letter 81-30, Safety Concerns Associated with Pipe Breaks in the BWR Scram System + (Safety Concerns Associated with Pipe Breaks in the BWR Scram System)
- NRC Generic Letter 81-20, Safety Concerns Associated with Pipe Breaks in the BWR Scram System + (Safety Concerns Associated with Pipe Breaks in the BWR Scram System)
- NRC Generic Letter 86-01, Safety Concerns Associated with Pipe Breaks in the BWR Scram System + (Safety Concerns Associated with Pipe Breaks in the BWR Scram System)
- NUREG-2165, Safety Culture Common Language + (Safety Culture Common Language)
- EPID:L-2024-LRM-0051 + (Safety Determination of a Potential Structural Failure of the Full Basket During Accident Conditions for the HI-STORM 100 and HI-STORM Flood/Wind Dry Cask Storage Systems)
- NRC Generic Letter 83-31, Safety Evaluation of "Abnormal Transient Operating Guidelines" + (Safety Evaluation of "Abnormal Transient Operating Guidelines")
- NRC Generic Letter 83-05, Safety Evaluation of "Emergency Procedure Guidelines, Revision 2," June 1982 + (Safety Evaluation of "Emergency Procedure Guidelines, Revision 2," June 1982)
- NRC Generic Letter 83-23, Safety Evaluation of "Emergency Procedure Guidelines" + (Safety Evaluation of "Emergency Procedure Guidelines")
- NRC Generic Letter 83-22, Safety Evaluation of "Emergency Response Guidelines" + (Safety Evaluation of "Emergency Response Guidelines")
- NRC Generic Letter 84-04, Safety Evaluation of Westinghouse Topical Reports Dealing with Elimination of Postulated Pipe Breaks in PWR Primary Main Loops (Generic Letter 84-04) + (Safety Evaluation of Westinghouse Topical Reports Dealing with Elimination of Postulated Pipe Breaks in PWR Primary Main Loops (Generic Letter 84-04))
- TSTF-548 + (Safety Function Determination Program Changes for Consistency)
- Safety Issues Resolution Branch + (Safety Issues Resolution Branch)
- TSTF-564 + (Safety Limit MCPR to COLR)
- NRC Generic Letter 82-24, Safety Relief Valve Quencher Loads: BWR MARK II and III Containments + (Safety Relief Valve Quencher Loads: BWR MARK II and III Containments)
- 10 CFR 72.70, Safety Analysis Report Updating + (Records, Reports, Inspections, and Enforcement)
- 10 CFR 72.248, Safety Analysis Report Updating + (Safety analysis report updating)
- 10 CFR 35.310, Safety Instruction + (Safety instruction)
- 10 CFR 35.410, Safety Instruction + (Safety instruction)
- 10 CFR 35.315, Safety Precautions + (Safety precautions)
- 10 CFR 35.415, Safety Precautions + (Safety precautions)
- 10 CFR 35.615, Safety Precautions for Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery Units + (Safety precautions for remote afterloader units, teletherapy units, and gamma stereotactic radiosurgery units)
- 10 CFR 35.610, Safety Procedures and Instructions for Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery Units + (Safety procedures and instructions for remote afterloader units, teletherapy units, and gamma stereotactic radiosurgery units)
- 10 CFR 70.62, Safety Program and Integrated Safety Analysis + (Safety program and integrated safety analysis)
- NRC Generic Letter 89-10, Safety-Related Motor-Operated Valve Testing and Surveillance + (Safety-Related Motor-Operated Valve Testing and Surveillance)
- 10 CFR 73.58, Safety/Security Interface Requirements for Nuclear Power Reactors + (Safety/security interface requirements for nuclear power reactors)
- Saginaw Intervenor + (Saginaw Intervenor)
- Sailaja Mokkapati + (Sailaja Mokkapati)
- Saint Lucie + (Saint Lucie)
- Saint Lucie JPM Retake Exam Inspection (Saint Lucie 2019) + (Saint Lucie JPM Retake Exam)
- Saint-Alban + (Saint-Alban)
- Saint-Laurent + (Saint-Laurent)
- EPID:L-2024-RNW-0019 + (Salado Isolation Mining Contractors LLC (Simco) - Certificate of Compliance No. 9218, Model No. Trupact-II Package)
- Salem + (Salem)
- Sally Billings + (Sally Billings)
- Sally Dee + (Sally Dee)
- Sally Hardy + (Sally Hardy)
- Sally Wilding + (Sally Wilding)
- Salman Haq + (Salman Haq)
- Sam Colvard + (Sam Colvard)
- Sam Graves + (Sam Graves)
- Samantha Crane + (Samantha Crane)
- Samantha Muir + (Samantha Muir)
- Samantha Wooley + (Samantha Wooley)
- Samarium + (Samarium)
- 10 CFR 32.19 + (Same: Conditions of licenses)
- 10 CFR 32.54 + (Same: Labeling of devices)
- 10 CFR 32.58 + (Same: Labeling of devices)
- 10 CFR 32.59 + (Same: Leak testing of each source)
- 10 CFR 32.56 + (Same: Material transfer reports)
- 10 CFR 32.52 + (Same: Material transfer reports and records)