Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- EPID:L-2020-LLA-0122 + (Response to U.S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request for Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6)
- EPID:L-2023-LLE-0090 + (Response to Westinghouse Request for Exemption from Title 10 of the Code of Federal Regulations Paragraph 70.50(b)(1))
- EPID:L-2021-LLA-0181 + (Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations)
- EPID:L-2017-LLA-0396 + (Responses to the Request for Additional Information Regarding License Amendment Request to Update the Reactor Coolant System Pressure-Temperature Limits)
- 10 CFR 2.1320, Responsibility and Power of the Presiding Officer In an Oral Hearing + (Responsibility and power of the presiding officer in an oral hearing)
- 10 CFR 4.231, Responsibility of Applicants and Recipients + (Enforcement)
- 10 CFR 51.125, Responsible Official + (Responsible Official)
- EPID:L-2023-LLA-0174 + (Restart Panel Charter)
- EPID:L-2023-LLE-0025 + (Restart Panel Charter)
- EPID:L-2023-LLM-0005 + (Restart Panel Charter)
- 10 CFR 40.56, Restrictions On the Use of Australian-Obligated Source Material + (Restrictions on the use of Australian-obligated source material)
- EPID:L-2020-MCA-0002 + (Resubmittal of Request to Extend the Due Date for Submitting Doe/Nrc Forms 742, 742C, and NRC Form 327 Following Inventory at Framatome Inc., Richland, Washington Site)
- EPID:L-2021-LRO-0060 + (Results of the Steam Generator Tube Inservice Inspection During the 24th Refueling Outage)
- 10 CFR 50.101, Retaking Possession of Special Nuclear Material + (Retaking possession of special nuclear material)
- 10 CFR 75.24, Retention of Records + (Retention of records)
- EPID:L-2023-LRO-0055 + (Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.1)
- 10 CFR 95.51, Retrieval of Classified Matter Following Suspension Or Revocation of Access Authorization + (Retrieval of classified matter following suspension or revocation of access authorization)
- Reuter Stokes + (Reuter Stokes)
- EPID:L-2021-DOT-0007 + (Revalidation Recommendation for the MX-6P Package)
- EPID:L-2020-LLA-0107 + (Revalidation Request, Japanese Package, Model No. GPO-1 (J/2009/AF-96, Rev. 1))
- EPID:L-2021-DOT-0008 + (Revalidation for the Model No. BU-D Package)
- EPID:L-2021-DOT-0005 + (Revalidation of French Certificate of Approval F 381 AF-96, Revision El for the TNF-XI Package)
- EPID:L-2023-LLL-0016 + (Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals)
- 10 CFR 81.53, Review by the Board + (Review by the Board)
- 10 CFR 13.5, Review by the Reviewing Official + (Review by the reviewing official)
- IP 60857, Review of 10 CFR 72.48 Evaluations + (Review of 10 CFR 72.48 Evaluations)
- NRC Generic Letter 83-09, Review of Combustion Engineering Owners' Group Emergency Procedures Guideline Program + (Review of Combustion Engineering Owners' Group Emergency Procedures Guideline Program)
- EPID:L-2022-LLA-0140 + (Review of Limerick Generating Station Defense in Depth and Diversity Common Cause Failure Coping Analysis, WNA-AR-01074-GLIM-P, Rev 1. Without Attachment 3 Enclosure)
- 10 CFR 2.913, Review of Restricted Data Or Other National Security Information Received In Evidence + (Review of Restricted Data or other National Security Information received in evidence)
- 10 CFR 2.341, Review of Decisions and Actions of a Presiding Officer + (Review of decisions and actions of a presiding officer)
- 10 CFR 63.16, Review of Site Characterization Activities. + (Review of site characterization activities.<sup><a href="#N_2_6316">2</a></sup>)
- 10 CFR 60.18, Review of Site Characterization Activities. + (Review of site characterization activities.<sup><a href="#N_1_6018">2</a></sup>)
- 10 CFR 26.413, Review Process + (Review process)
- 10 CFR 26.39, Review Process for Fitness-For-Duty Policy Violations + (Review process for fitness-for-duty policy violations)
- TSTF-329 + (Revise 3.4.17 Bases to Match Specification)
- TSTF-195 + (Revise 3.4.6 Action A.1 to Be Consistent with the Specification)
- TSTF-318 + (Revise 3.5.1 for One Lcpi Pump Inoperable in Each of Two ECCS Divisions)
- CAC:MF5026 + (TSTF-37)
- TSTF-346 + (Revise 3.8.1 Actions to Allow Time to Cooldown Under Natural Circulation)
- TSTF-546 + (Revise APRM Channel Adjustment Surveillance Requirement)
- TAC:MF7622 + (Revise APRM Channel Adjustment Surveillance Requirement)
- TSTF-277 + (Revise Accumulator Boron Concentration Verification SR)
- TSTF-117 + (Revise Accumulator Pressure Reference from Pressurizer to RCS)
- TSTF-305 + (Revise Actions for Exiting Physics Tests)
- TSTF-566 + (Revise Actions for Inoperable RHR Shutdown Cooling Subsystems)
- TSTF-571 + (Revise Actions for Inoperable Source Range Neutron Flux Monitor)
- TSTF-220 + (Revise Actions for Inoperable, Misaligned Apsr)
- TSTF-100 + (Revise Adv Action B to State Restore All But One Adv to Operable Status)
- TSTF-592 + (Revise Automatic Depressurization System (ADS) Instrumentation Requirements)
- TSTF-514 + (Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation)
- TAC:ME6017 + (Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation)