Browse wiki

Jump to navigation Jump to search
June 21, 2019  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
August 26, 2016  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
11:28:26, 7 March 2018  +
TSTF-37  +, TSTF-30  +, TSTF-45  +, TSTF-46  +, Clarify SR on Bypass of DG Automatic Trips  +, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil  +, Modify Section 3.8 Mode Restriction Notes  +, Allow Administrative Means of Position Verification for Locked or Sealed Valves  +, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration  +, Control Rod SCRAM Time Testing  +, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRS  +, SFDP Clarifications  +, Add Met Vs. Perform to Specification 1.4, Frequency  +, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration  +, Determination of Cumulative and Projected Dose Contributions in Recp  +, Revise 3.5.1 for One Lcpi Pump Inoperable in Each of Two ECCS Divisions  +, Secondary Containment and Shield Building Boundary Integrity SRS  +, EFCV Completion Time to 72 Hours  +, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO  +, Removing Restart of Shutdown Clock for Increasing Suppression Pool Temperature  +  and Clarify the Control Rod Block Instrumentation Required Action  +
August 26, 2016  +
Approved  +  and Closed  +