Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- EPID:L-2020-LLA-0132 + (Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI)
- EPID:L-2021-LLR-0048 + (Request to Use Provisions of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)(iv))
- EPID:L-2022-LLR-0086 + (Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Requests for the Fifth Inservice Testing Interval)
- EPID:L-2022-LLR-0000 + (Request to Use a Portion of Later Edition of the ASME Operation and Maintenance of Nuclear Power Plants)
- EPID:L-2018-LRO-0009 + (Request to Use a Portion of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Lnservice Inspection Activities)
- EPID:L-2021-LLR-0042 + (Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI)
- EPID:L-2019-LLR-0008 + (Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI)
- EPID:L-2019-LLR-0080 + (Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI)
- EPID:L-2020-LLR-0134 + (Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI)
- EPID:L-2023-LLR-0018 + (Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI)
- EPID:L-2020-LLR-0123 + (Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, Relief Request RR5-04)
- EPID:L-2023-LLR-0029 + (Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations)
- 10 CFR 2.1504, Request to Participate In Legislative Hearing + (Request to participate in legislative hearing)
- EPID:L-2021-LLE-0005 + (Request-Calvert Cliffs-Exelon Generation Co., LLC)
- EPID:L-2020-LLE-0228 + (Request-Quad Cities-Exelon Generation Co., LLC)
- EPID:L-2020-LLE-0021 + (Requesting NRC Approval to Proactively Enter Into the Alternative Work Hour Controls Delineated in NRC Letter from H. Nieh to NEI Dated March 28, 2020 During COV-19 Public Health Emergency)
- 10 CFR 19.16 + (Requests by workers for inspections)
- EPID:L-2021-LLA-0038 + (Requests for Addition Information for Proposed Decommissioning Tech Specs License Amendment Request)
- EPID:L-2020-LLA-0277 + (Requests for Continuation of Regulatory Relief Granted in Amendments 37 and 38 of SNM-42 - COVID-19 Pandemic Response)
- EPID:L-2022-LLR-0022 + (Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods)
- EPID:L-2018-LLR-0063 + (Requests for Relief from American Society of Mechanical Engineers (ASME) Section XI Volumetric Examination Requirements Fourth 10-Year Interval, Second and Third Period)
- 10 CFR 2.206, Requests for Action Under This Subpart + (Requests for action under this subpart)
- 10 CFR 2.1109, Requests for Oral Argument + (Requests for oral argument)
- 10 CFR 9.23, Requests for Records + (Requests for records)
- 10 CFR 9.41, Requests for Waiver Or Reduction of Fees + (Requests for waiver or reduction of fees)
- 10 CFR 9.53, Requests; How and Where Presented + (Requests; how and where presented)
- TSTF-197 + (Require Containment Closure When Shutdown Cooling Requirements Are Not Met)
- TSTF-018-A + (Require Only One -SECONDARY - Containment Access Door PER Access Opening to Be Closed)
- TSTF-018 + (Require Only One -SECONDARY - Containment Access Door PER Access Opening to Be Closed)
- TSTF-314 + (Require Static and Transient Fq Measurement)
- TAC:MF4560 + (TSTF-2)
- NRC Generic Letter 83-28, Required Actions Based on Generic Implications of Salem ATWS Events + (Required Actions Based on Generic Implications of Salem ATWS Events)
- 10 CFR 63.312, Required Characteristics of the Reasonably Maximally Exposed Individual + (Required characteristics of the reasonably maximally exposed individual)
- 10 CFR 63.305, Required Characteristics of the Reference Biosphere + (Required characteristics of the reference biosphere)
- 10 CFR 71.39, Requirement for Additional Information + (Requirement for additional information)
- 10 CFR 73.73, Requirement for Advance Notice and Protection of Export Shipments of Special Nuclear Material of Low Strategic Significance + (Requirement for advance notice and protection of export shipments of special nuclear material of low strategic significance)
- 10 CFR 73.74, Requirement for Advance Notice and Protection of Import Shipments of Nuclear Material From Countries That Are Not Party to the Convention On the Physical Protection of Nuclear Material + (Requirement for advance notice and protection of import shipments of nuclear material from countries that are not party to the Convention on the Physical Protection of Nuclear Material)
- 10 CFR 40.67, Requirement for Advance Notice for Importation of Natural Uranium From Countries That Are Not Party to the Convention On the Physical Protection of Nuclear Material + (Requirement for advance notice for importation of natural uranium from countries that are not party to the Convention on the Physical Protection of Nuclear Material)
- 10 CFR 73.72, Requirement for Advance Notice of Shipment of Formula Quantities of Strategic Special Nuclear Material, Special Nuclear Material of Moderate Strategic Significance, Or Irradiated Reactor Fuel + (Requirement for advance notice of shipment of formula quantities of strategic special nuclear material, special nuclear material of moderate strategic significance, or irradiated reactor fuel)
- 10 CFR 71.3, Requirement for License + (Requirement for license)
- 10 CFR 50.10, License Required; Limited Work Authorization + (Requirement of License, Exceptions)
- 10 CFR 51.94, Requirement to Consider Final Environmental Impact Statement + (Requirement to consider final environmental impact statement)
- 10 CFR 51.102, Requirement to Provide a Record of Decision; Preparation + (Requirement to provide a record of decision; preparation)
- 10 CFR 51.35, Requirement to Publish Finding of No Significant Impact; Limitation On Commission Action + (Requirement to publish finding of no significant impact; limitation on Commission action)
- 10 CFR 51.26, Requirement to Publish Notice of Intent and Conduct Scoping Process + (Requirement to publish notice of intent and conduct scoping process)
- 10 CFR 51.41, Requirement to Submit Environmental Information + (Requirement to submit environmental information)
- 10 CFR 54.35, Requirements During Term of Renewed License + (Requirements during term of renewed license)
- 10 CFR 150.31, Requirements for Agreement State Regulation of Byproduct Material + (Requirements for Agreement State regulation of byproduct material)
- 10 CFR 11.11, General Requirements + (Requirements for Special Nuclear Material Access Authorization)
- 10 CFR 40.66, Requirements for Advance Notice of Export Shipments of Natural Uranium + (Requirements for advance notice of export shipments of natural uranium)
- 10 CFR 37.27, Requirements for Criminal History Records Checks of Individuals Granted Unescorted Access to Category 1 Or Category 2 Quantities of Radioactive Material + (Requirements for criminal history records checks of individuals granted unescorted access to category 1 or category 2 quantities of radioactive material)