Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RETS Inspection (Indian Point 2019) + (RETS)
- RETS Inspection (LaSalle 2020) + (RETS)
- RETS Inspection (Limerick 2019) + (RETS)
- RETS Inspection (McGuire 2019) + (RETS)
- RETS Inspection (Millstone 2019) + (RETS)
- RETS Inspection (Millstone 2021) + (RETS)
- RETS Inspection (Monticello 2019) + (RETS)
- RETS Inspection (Nine Mile Point 2020) + (RETS)
- RETS Inspection (North Anna 2019) + (RETS)
- RETS Inspection (Oconee 2020) + (RETS)
- RETS Inspection (Peach Bottom 2021) + (RETS)
- RETS Inspection (Perry 2019) + (RETS)
- RETS Inspection (Prairie Island 2021) + (RETS)
- RETS Inspection (Prairie Island 2020) + (RETS)
- RETS Inspection (Quad Cities 2021) + (RETS)
- RETS Inspection (Saint Lucie 2020) + (RETS)
- RETS Inspection (Salem 2020) + (RETS)
- RETS Inspection (Seabrook 2021) + (RETS)
- RETS Inspection (Sequoyah 2019) + (RETS)
- RETS Inspection (Surry 2019) + (RETS)
- RETS Inspection (Surry 2021) + (RETS)
- RETS Inspection (Susquehanna 2020) + (RETS)
- RETS Inspection (Turkey Point 2020) + (RETS)
- RETS Inspection (Waterford 2021) + (RETS)
- RETS Inspection (Watts Bar 2020) + (RETS)
- EPID:L-2021-NFN-0003 + (RIPE Exemption 11-17-21 Pre-submittal Public Meeting Presentation Slides)
- EPID:L-2021-LRM-0087 + (RIPE Exemption to Eliminate Dafas Pre-submittal Meeting Summary)
- TSTF-498 + (RISK-INFORMED Containment Isolation Valve Completion Times (BAW-2461))
- TAC:MD4000 + (RISK-INFORMED Containment Isolation Valve Completion Times (BAW-2461))
- TSTF-424 + (RISK-INFORMED HPSI Aot/Ct Extension - WCAP-15773)
- TAC:MD2341 + (RISK-INFORMED HPSI Aot/Ct Extension - WCAP-15773)
- Category:Letter type:RNP + (RNP)
- RP Occupational Rad Safety Baseline Inspection (Harris 2019) + (RP Occupational Rad Safety Baseline)
- 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation + (RPS Actuation)
- TSTF-320 + (RPS Electric Power Monitoring Modes of Applicability)
- TSTF-418 + (RPS and ESFAS Test Times and Completion Times - WCAP-14333)
- CAC:MF9900 + (Surveillance Test Interval Extensions for Components of the Reactor Protection System - WCAP-15376-P)
- TAC:MC1756 + (Surveillance Test Interval Extensions for Components of the Reactor Protection System - WCAP-15376-P)
- TAC:MD5880 + (Surveillance Test Interval Extensions for Components of the Reactor Protection System - WCAP-15376-P)
- CAC:MF6067 + (RPS and ESFAS Test Times and Completion Times - WCAP-14333)
- TAC:ME0246 + (Surveillance Test Interval Extensions for Components of the Reactor Protection System - WCAP-15376-P)
- TAC:ME5836 + (RPS and ESFAS Test Times and Completion Times - WCAP-14333)
- TAC:MD7720 + (Surveillance Test Interval Extensions for Components of the Reactor Protection System - WCAP-15376-P)
- TAC:MD7718 + (Surveillance Test Interval Extensions for Components of the Reactor Protection System - WCAP-15376-P)
- TAC:MD7531 + (RPS and ESFAS Test Times and Completion Times - WCAP-14333)
- TAC:MF3128 + (Clarify Application of Setpoint Methodology for LSSS Functions)
- CAC:MF4131 + (Surveillance Test Interval Extensions for Components of the Reactor Protection System - WCAP-15376-P)
- TAC:MF4131 + (RPS and ESFAS Test Times and Completion Times - WCAP-14333)
- TAC:MC6482 + (RPS and ESFAS Test Times and Completion Times - WCAP-14333)
- TAC:MC8898 + (RPS and ESFAS Test Times and Completion Times - WCAP-14333)
- TSTF-582 + (RPV WIC Enhancements)