Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Name" with value "RCS Maximum Flowrate". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • 10 CFR 72.174, Quality Assurance Records  + (Quality assurance records)
  • 10 CFR 71.101, Quality Assurance Requirements  + (Quality Assurance)
  • 10 CFR 72.140, Quality Assurance Requirements  + (Quality Assurance)
  • 10 CFR 34.29  + (Quarterly inventory)
  • Quynh Nguyen  + (Quynh Nguyen)
  • R Lynne Finch  + (R Lynne Finch)
  • EPID:L-2021-LLE-0044  + (R. E. Ginna Nuclear Power Plant - Request for Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR 50, Appendix E, Section IV.F.2.c)
  • EPID:L-2020-LLA-0031  + (R. E. Ginna Nuclear Power Plant, License Amendment Request to Add a One-Time Note for Use of Alternate Residual Heat Removal Methods)
  • EPID:L-2024-LLR-0006  + (R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump)
  • EPID:L-2019-LLA-0157  + (R. E. Ginna Nuclear Power Plant: License Amendment Request - Increase the Main Steam Safety Valve Lift Setpoint Tolerance)
  • EPID:L-2017-LLA-0388  + (R. E. Ginna, License Amendment Request to Revise Technical Specifications for Selected Reactor Trip System and Engineered Safety Feature Actuation System Instrumentation Channels to Incorporate Bypass Test Capability)
  • EPID:L-2018-LLR-0104  + (R. E. Ginna, Relief Request ISI-18 to Extend the Reactor Pressure Vessel Inservice Inspection Interval)
  • EPID:L-2022-LLA-0057  + (R.E.. Ginna Nuclear Power Plant - License Amendment Request to Revise Technical Specifications (TS) for the Spent Fuel Pool Charcoal System and Two (2) TS Administrative Changes)
  • EPID:L-2025-LLO-0000  + (R.Williams, WCS to A.Kock, NRC, 2025 - WCS Request to Modify Conditions in Current 2023 NRC Order for SNM to WCS)
  • EPID:L-2019-LRO-0079  + (R21 Steam Generator Tube Inspection Report)
  • EPID:L-2022-NFO-0000  + (R22 (March 2022) - Steam Generator Tube Inspection Discussion Points 11 March 2022)
  • EPID:L-2020-LLR-0048  + (RA-20-0045, Request for Alternative to Examination Category B-N-1 (VT-3) Visual Examination of Accessible Areas of the Reactor Vessel Interior)
  • EPID:L-2023-LLE-0057  + (RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation)
  • EPID:L-2018-LLA-0103  + (RAI (LAR 18-009) - Vogtle Electric Generating Plant, Unit 3 and 4)
  • EPID:L-2021-NEW-0007  + (RAI Letter for the Model No. TN40HT Package)
  • EPID:000222  + (RAI Regarding Pennsylvania State University Submittal)
  • EPID:L-2022-LLE-0015  + (RAI Response to Nac'S Amendment Request for the NAC International Magnastor Cask System Amendment No. 12)
  • Category:Letter type:RBG  + (RBG)
  • EPID:L-2021-LRM-0009  + (RCP Seal Solutions - May 24 2022 Slide Material (Public))
  • TSTF-116  + (RCS Inventory Balance SR Regarding Steady State Clarification)