Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Inservice Inspection (Watts Bar 2020) + (Inservice)
- Inservice Inspection 2 (Watts Bar 2020) + (Inservice)
- Inservice Inspection (Wolf Creek 2019) + (Inservice)
- Inservice Inspection (Wolf Creek 2021) + (Inservice)
- Inservice Inspection (South Texas 2019) + (Inservice)
- Inservice Inspection (South Texas 2020) + (Inservice)
- Inservice Inspection (South Texas 2021) + (Inservice)
- Inservice Inspection (Clinton 2019) + (Inservice)
- Inservice Inspection (Farley 2020) + (Inservice)
- EPID:L-2020-LLR-0059 + (Inservice Inspection (ISI) and Inservice Testing (IST) Program Relief Requests)
- EPID:L-2021-LRO-0043 + (Inservice Inspection (ISI) and Steam Generator Inspection (SG-ISI) Report)
- EPID:L-2018-LLR-0116 + (Inservice Inspection Plan Fifth Ten-Year Interval Unit 1 Relief Request 6)
- EPID:L-2019-LLR-0074 + (Inservice Inspection Plan, Forth Ten-Year Interval Relief Request 16)
- EPID:L-2017-LRR-0065 + (Inservice Inspection Program Fifth Ten-Year Interval 10 CFR 50.55a Relief Requests)
- EPID:L-2018-LLR-0001 + (Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations)
- NRC Generic Letter 80-101, Inservice Inspection Programs for Prestressed Concrete Containment Structures + (Inservice Inspection Programs for Prestressed Concrete Containment Structures)
- EPID:L-2018-LLR-0133 + (Inservice Inspection Relief Request 14R-63)
- Code Case OMN-20, Inservice Test Frequency + (Inservice Test Frequency)
- EPID:L-2020-LLR-0023 + (Inservice Testing Program Plan for Pumps, Valves, and Snubbers Fifth 10-Year Interval Update for Units 1 and 2; Request for Alternatives to Requirements of ASME OM Code)
- EPID:L-2021-LLR-0090 + (Inservice Testing Program Relief Request VRR-RBS-2021-1 Pressure Isolation Valve Testing Frequency)
- EPID:L-2021-LLR-0040 + (Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency)
- EPID:L-2023-LLR-0068 + (Inservice Testing Program for Pumps and Valves Fifth Interval Update and Associated Relief and Alternative Requests)
- 10 CFR 50 Appendix B Criterion X, Inspection + (Inspection)
- NRC Report 22, Inspection Activity Plan + (Inspection Activity Plan)
- EPID:L-2021-LRM-0043 + (Inspection Manual Chapter 0375 Recommendation for Callaway Plant)
- EPID:L-2018-LRO-0014 + (Inspection Report for End of Cycle 21 Refueling Outage)
- 10 CFR 36.61, Inspection and Maintenance + (Inspection and maintenance)
- 10 CFR 34.31 + (Inspection and maintenance of radiographic exposure devices, transport and storage containers, associated equipment, source changers, and survey instruments)
- 10 CFR 71.93, Inspection and Tests + (Inspection and tests)
- 10 CFR 72.232, Inspection and Tests + (Inspection and tests)
- 10 CFR 52.99, Inspection During Construction + (Inspection during construction)
- TI 2515/193, Inspection of the Implementation of EA-13-109: Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions + (Inspection of the Implementation of EA-13-109: Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions)
- TI 2515/191, Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication, Staffing, Multi-Unit Dose Assessment Plans + (Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans)
- 10 CFR 50 Appendix B Criterion XIV, Inspection, Test, and Operating Status + (Inspection, Test, and Operating Status)
- 10 CFR 39.43, Inspection, Maintenance, and Opening of a Source Or Source Holder + (Inspection, maintenance, and opening of a source or source holder)
- 10 CFR 71.129, Inspection, Test, and Operating Status + (Inspection, test, and operating status)
- 10 CFR 72.168, Inspection, Test, and Operating Status + (Inspection, test, and operating status)
- 10 CFR 30.52, Inspections + (Inspections)
- 10 CFR 26.821, Inspections + (Inspections, Violations, and Penalties)
- 10 CFR 37.105, Inspections + (Inspections)
- 10 CFR 40.62, Inspections + (Inspections)
- 10 CFR 50.70, Inspections + (Inspections)
- 10 CFR 60.75, Inspections + (Inspections)
- 10 CFR 63.75, Inspections + (Inspections)
- 10 CFR 70.55, Inspections + (Inspections)
- 10 CFR 74.81, Inspections + (Enforcement)
- 10 CFR 76.121, Inspections + (Inspections)
- 10 CFR 95.59, Inspections + (Inspections)
- 10 CFR 72.82, Inspections and Tests + (Inspections and tests)
- 10 CFR 19.17 + (Inspections not warranted; informal review)
- NRC Generic Letter 84-11, Inspections of BWR Stainless Steel Piping + (Inspections of BWR Stainless Steel Piping)