Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NRC Generic Letter 86-06, Implementation of TMI Action Item II.K.3.5, "Automatic Trip of Reactor Coolant Pumps" + (Implementation of TMI Action Item II.K.3.5, "Automatic Trip of Reactor Coolant Pumps")
- NRC Generic Letter 86-05, Implementation of TMI Action Item II.K.3.5, "Automatic Trip of Reactor Coolant Pumps" + (Implementation of TMI Action Item II.K.3.5, "Automatic Trip of Reactor Coolant Pumps")
- 10 CFR 2.334, Implementing Hearing Schedule for Proceeding + (Implementing hearing schedule for proceeding)
- NRC Generic Letter 83-34, Important to Safety + (Important to Safety)
- EPID:L-2020-LLR-0067 + (Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements)
- TSTF-476 + (Improved BPWS Control Rod Insertion Process (NEDO-33091))
- TAC:ME9600 + (Improved BPWS Control Rod Insertion Process (NEDO-33091))
- TAC:MD6922 + (Improved BPWS Control Rod Insertion Process (NEDO-33091))
- TAC:MD8194 + (Improved BPWS Control Rod Insertion Process (NEDO-33091))
- TAC:MD6814 + (Improved BPWS Control Rod Insertion Process (NEDO-33091))
- TAC:MD6205 + (Improved BPWS Control Rod Insertion Process (NEDO-33091))
- Imtiaz Madni + (Imtiaz Madni)
- EPID:L-2019-LLR-0018 + (In-Service Inspection Plans Fourth Ten-Year Interval: Unit 1 Relief Requests 15 and 16)
- EPID:L-2018-LLR-0012 + (In-service Testing Program for Pumps, Valves, & Snubbers Fifth & Fourth 10-Year Interval Updates for Units 2 & 3)
- NRC Generic Letter 82-28, Inadequate Core Cooling Instrumentation System + (Inadequate Core Cooling Instrumentation System)
- EPID:L-2018-LLL-0011 + (Inadequate Protection from Tornado Missiles Identified Due to Nonconforming Design, LER 17-002-00 for Callaway Plant, Unit 1, Regarding Inadequate Protection from Tornado Missiles Identified Due to Nonconforming Design)
- EPID:L-2017-LLL-0037 + (Inadequate Protection from Tornado Missiles Identified Due to Nonconforming Design Conditions, LER 17-001-00 for Palisades Nuclear Plant Regarding Inadequate Protection from Tornado Missiles Identified Due to Nonconforming Design Conditions)
- NRC Generic Letter 85-05, Inadvertent Boron Dilution Events + (Inadvertent Boron Dilution Events)
- 10 CFR 76.65, Inalienability of Certificates + (Inalienability of certificates)
- 10 CFR 40.46, Inalienability of Licenses + (Inalienability of licenses)
- 10 CFR 70.36, Inalienability of Licenses + (Inalienability of licenses)
- 10 CFR 55.25, Incapacitation Because of Disability Or Illness + (Incapacitation because of disability or illness)
- X.1 + (Incentives, Sanctions, and Rewards)
- Inchcape Testing Services + (Inchcape Testing Services)
- EPID:L-2020-LLE-0211 + (Incoming Request-Beaver Valley-Energy Harbor Nuclear Corp)
- EPID:L-2021-LLE-0013 + (Incoming Request-Braidwood-Exelon Generation Co. LLC)
- EPID:L-2020-LLE-0232 + (Incoming Request-Clinton-Exelon Generation Co., LLC)
- EPID:L-2020-LLE-0208 + (Incoming Request-Davis-Besse-Energy Harbor Nuclear Corp)
- EPID:L-2022-LLE-0002 + (Incoming Request-Davis-Besse-Energy Harbor Nuclear Corp)
- EPID:L-2022-LLE-0008 + (Incoming Request-La Salle-Constellation Energy, COVID-19 Related Request for Exemption from Part 26 Work Hours Requirements)
- EPID:L-2021-LLE-0004 + (Incoming Request-La Salle-Exelon Generation Co., LLC)
- EPID:L-2020-LLE-0222 + (Incoming Request-Peach Bottom-Exelon Generation Co., LLC)
- EPID:L-2020-LLE-0209 + (Incoming Request-Perry-Energy Harbor Nuclear Corp)
- EPID:L-2021-LLE-0010 + (Incoming Request-Quad Cities-Exelon Generation Co., LLC)
- EPID:L-2020-LLR-0145 + (Incoming Web Based Relief Request-Palo Verde)
- NRC Generic Letter 82-23, Inconsistency Between Requirements of 10CFR 73.40(D) and Standard Tech Specs For Performing Audits of Sadeguards Contin + (Inconsistency Between Requirements of 10CFR 73.40(D) and Standard Tech Specs For Performing Audits of Sadeguards Contin)
- NRC Generic Letter 82-17, Inconsistency of Requirements Between 50.54(t) and 50.15 + (Inconsistency of Requirements Between 50.54(t) and 50.15)
- TSTF-212 + (Incorporate Approved Topical BAW-10167, Supplement 3 in SR 3.3.3.1 and SR 3.3.4.1)
- TSTF-059 + (Incorporate CE NPSD-994 Recommendations Into the Sits Specification)
- TSTF-058 + (Incorporate CE NPSD-995 Recommendations Into the ECCS Specification)
- TSTF-368 + (Incorporate CEOG Topical Report to Eliminate Pressure Sensor Response Time Testing)
- TAC:MB4130 + (Missed Surveillance Requirements)
- TSTF-527 + (Incorporate Model Application Commitments as Reviewer'S Notes)
- TSTF-139 + (Incorrect Criteria Defined in B 3.7.16)
- TSTF-370 + (Increase Accumulator Completion Time from 1 Hour to 24 Hours - WCAP-15049)
- TAC:ME1437 + (Increase Accumulator Completion Time from 1 Hour to 24 Hours - WCAP-15049)
- TAC:MC6416 + (Increase Accumulator Completion Time from 1 Hour to 24 Hours - WCAP-15049)
- TAC:MC2301 + (Increase Accumulator Completion Time from 1 Hour to 24 Hours - WCAP-15049)
- TAC:MC2309 + (Increase Accumulator Completion Time from 1 Hour to 24 Hours - WCAP-15049)
- TSTF-537 + (Increase CIV Completion Time - Update of TSTF-373)
- TAC:ME8311 + (Increase CIV Completion Time from 72 Hours to 7 Days (NPSD-1168))