Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 10 CFR 50.61, Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events + (Fracture toughness requirements for protection against pressurized thermal shock events)
- Framatome + (Framatome)
- EPID:L-2018-DFA-0010 + (Framatome - Amend 12 Updated DFP)
- Framatome ANP Richland + (Framatome ANP Richland)
- EPID:L-2018-SPR-0001 + (Framatome Amendment 11, Approval of Physical Protection Plan, Revision 11)
- EPID:L-2021-EPR-0002 + (Framatome Amendment Requesting Extension to Performance Date of EP Drill to June 30, 2022)
- EPID:L-2023-RNW-0025 + (Framatome Inc. Request for Five Year Renewal of Certificate of Compliance No. 9248 for the Model No. SP-1, SP-2, and SP-3 Packaging)
- EPID:L-2023-RNW-0024 + (Framatome Inc., Request for Five Year Renewal of Certificate of Compliance No. 9252 for the Model No. 51032-2 Packaging)
- EPID:L-2021-LLA-0218 + (Framatome Inc., Richland Nuclear Fuel Fabrication Facility'S Request to Amend License No. SNM-1227; Docket No. 70-1257 and Approval of Criticality Safety Methods)
- EPID:L-2023-LLA-0073 + (Framatome Inc., Richland Nuclear Fuel Fabrication Facility'S Intent to Amend License No. SNM-1227;)
- EPID:L-2020-LLA-0247 + (Framatome MAP-12 and MAP-13 Shipping Container, Amendment)
- EPID:L-2018-LLA-0009 + (Framatome, Inc., Amendment 10 Name Change)
- EPID:L-2021-LLA-0201 + (Framatome, Inc., Submittal of Model No. TN-B1 Transport Package, License Amendment Request)
- EPID:L-2019-PMP-0011 + (Framatome, Inc., Submittal of NRC Form 327)
- Francis Peduzzi + (Francis Peduzzi)
- Francium + (Francium)
- Frank Akstulewicz + (Frank Akstulewicz)
- Frank Arner + (Frank Arner)
- Frank Ehrhardt + (Frank Ehrhardt)
- Frank Picanso + (Frank Picanso)
- Frank Tran + (Frank Tran)
- Frankie Vega + (Frankie Vega)
- Fred Bower + (Fred Bower)
- Fred Forsaty + (Fred Forsaty)
- Fred Hutchinson Cancer Center + (Fred Hutchinson Cancer Center)
- Fred Miller + (Fred Miller)
- Fred Schofer + (Fred Schofer)
- Frederic Gooding + (Frederic Gooding)
- Frederick Brown + (Frederick Brown)
- Frederick Sock + (Frederick Sock)
- Frederick Sullivan + (Frederick Sullivan)
- Fredonia Stewart + (Fredonia Stewart)
- S.3 + (Free Flow of Information)
- 10 CFR 9.11, Scope of Subpart + (Freedom of Information Act Regulations)
- Friends of the Earth + (Friends of the Earth)
- 10 CFR 5.525, Fringe Benefits + (Fringe benefits)
- TSTF-226 + (Fuel Loading with Control Rods Withdrawn or Removed from Defueled Core Cells)
- Fuel Manufacturing Branch + (Fuel Manufacturing Branch)
- TSTF-225 + (Fuel Movement with Inoperable Refueling Equipment Interlocks)
- TAC:MC6760 + (Control Rod SCRAM Time Testing)
- TAC:M98473 + (Fuel Movement with Inoperable Refueling Equipment Interlocks)
- TSTF-070 + (Fuel Storage Pool Verification)
- Fuente Eduardo Sastre + (Fuente Eduardo Sastre)
- Fukushima Dai-Ichi + (Fukushima Daiichi)
- 10 CFR 35.635, Full Calibration Measurements On Gamma Stereotactic Radiosurgery Units + (Full calibration measurements on gamma stereotactic radiosurgery units)
- 10 CFR 35.633, Full Calibration Measurements On Remote Afterloader Units + (Full calibration measurements on remote afterloader units)
- 10 CFR 35.632, Full Calibration Measurements On Teletherapy Units + (Full calibration measurements on teletherapy units)
- NRC Generic Letter 81-17, Functional Criteria for Emergency Response Facilities + (Functional Criteria for Emergency Response Facilities)
- NRC Generic Letter 80-73, Functional Criteria for Emergency Response Facilities, NUREG-0696 + (Functional Criteria for Emergency Response Facilities, NUREG-0696)
- 10 CFR 61.62, Funding for Disposal Site Closure and Stabilization + (Funding for disposal site closure and stabilization)
- 10 CFR 150.32, Funds for Reclamation Or Maintenance of Byproduct Material + (Funds for reclamation or maintenance of byproduct material)