Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- EPID:L-2017-RNW-0016 + (Final Interim Remedial Investigation Data Summary Report Westinghouse Columbia Fuel Fabrication Facility)
- EPID:L-2020-TOP-0024 + (Final SE MRP-227, Rev 1-A Supplemental Information)
- EPID:L-2016-TOP-0015 + (Final SER (Non-Prop) - TR-0116-21012, Revision 1, NuScale Power Critical Heat Flux Correlations.)
- EPID:L-2018-TOP-0029 + (Final Safety Evaluation for Framatome Inc. Topical Report EMF-93-177, Revision 1, Supplement 2P, Revision 1, Mechanical Design for BWR Fuel Channels: Z4B Material)
- EPID:L-2020-TOP-0023 + (Final Safety Evaluation for GEH QAPD Revision 15 Review)
- EPID:L-2020-TOP-0027 + (Final Safety Evaluation for Sargent & Lundy, LLC Nuclear Quality Assurance Program Topical Report SL-TR-1, Revision 25)
- EPID:L-2014-TOP-0004 + (Final Safety Evaluation for Topical Report ANP-10332P, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Loss of Coolant Accident Scenarios)
- EPID:L-2019-LRM-0014 + (Final Safety Evaluation for Topical Report ANP-10341P, the ORFEO-GAIA and ORFEO-NMGRID Critical Heat Flux Correlations)
- EPID:L-2018-TOP-0032 + (Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-15942-P-A/WCAP-15492-NP-A, Supplement 1, Revision 1, Material Changes for SVEA-96 Optima2 Fuel Assemblies)
- EPID:L-2014-TOP-0003 + (Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-17769-P/NP, Revision 0, Reference Fuel Design SVEA-96 Optima3)
- EPID:L-2021-TOP-0022 + (Final Safety Evaluation of Metallic Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-013))
- EPID:L-2023-TOP-0024 + (Final Safety Evaluation of Metallic Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-013))
- 10 CFR 2.344, Final Decision + (Final decision)
- 10 CFR 14.37 + (Final denial of claim)
- 10 CFR 51.91, Final Environmental Impact Statement--Contents + (Final environmental impact statement--contents)
- 10 CFR 51.90, Final Environmental Impact Statement--General + (Final Environmental Impact Statements--General Requirements)
- 10 CFR 51.118, Final Environmental Impact Statement--Notice of Availability + (Final environmental impact statement--notice of availability)
- 10 CFR 51.97, Final Environmental Impact Statement-Materials License + (Final Environmental Impact Statements-Materials Licenses)
- 10 CFR 15.47 + (Finality of a compromise)
- 10 CFR 52.98, Finality of Combined Licenses; Information Requests + (Finality of combined licenses; information requests)
- 10 CFR 2.406, Finality of Decisions On Separate Issues + (Finality of decisions on separate issues)
- 10 CFR 52.39, Finality of Early Site Permit Determinations + (Finality of early site permit determinations)
- 10 CFR 52.171, Finality of Manufacturing Licenses; Information Requests + (Finality of manufacturing licenses; information requests)
- 10 CFR 52.83, Finality of Referenced Nrc Approvals; Partial Initial Decision On Site Suitability + (Finality of referenced NRC approvals; partial initial decision on site suitability)
- 10 CFR 52.145, Finality of Standard Design Approvals; Information Requests + (Finality of standard design approvals; information requests)
- 10 CFR 52.63, Finality of Standard Design Certifications + (Finality of standard design certifications)
- EPID:L-2018-LLL-0028 + (Financial Assurance Documents and Financial Statements for June 30, 2018 and 2017 for the Reed Institute Dba Reed College)
- EPID:L-2023-LLE-0008 + (Financial Assurance Information for Kewaunee License Transfer)
- EPID:L-2017-LRO-0054 + (Financial Assurance Requirements for Decommissioning Nuclear Power Reactors)
- 10 CFR 61.61, Applicant Qualifications and Assurances + (Financial Assurances)
- Management Directive Volume 4, Financial Management + (Financial Management)
- 10 CFR 5.430, Financial Assistance + (Financial assistance)
- 10 CFR 30.35 + (Financial assurance and recordkeeping for decommissioning)
- 10 CFR 40.36, Financial Assurance and Recordkeeping for Decommissioning + (Financial assurance and recordkeeping for decommissioning)
- 10 CFR 70.25, Financial Assurance and Recordkeeping for Decommissioning + (Financial assurance and recordkeeping for decommissioning)
- 10 CFR 72.30, Financial Assurance and Recordkeeping for Decommissioning + (Financial assurance and recordkeeping for decommissioning)
- 10 CFR 61.63, Financial Assurances for Institutional Controls + (Financial assurances for institutional controls)
- 10 CFR 61.15, Financial Information + (Financial information)
- 10 CFR 51.32, Finding of No Significant Impact + (Finding of No Significant Impact)
- 10 CFR 2.1209, Findings of Fact and Conclusions of Law + (Findings of fact and conclusions of law)
- NRC Generic Letter 80-96, Fire Protection + (Fire Protection)
- NRC Generic Letter 80-103, Fire Protection - Revised Federal Register Notice + (Fire Protection - Revised Federal Register Notice)
- NRC Generic Letter 82-21, Fire Protection Audits + (Fire Protection Audits)
- Fire Protection Change + (Fire Protection Change)
- NRC Generic Letter 77-02, Fire Protection Functional Responsibilities + (Fire Protection Functional Responsibilities)
- NRC Generic Letter 85-01, Fire Protection Policy Steering Committee Report + (Fire Protection Policy Steering Committee Report)
- NRC Generic Letter 80-45, Fire Protection Rule + (Fire Protection Rule)
- NRC Generic Letter 81-12, Fire Protection Rule (45 FR 76602, 11/19/80) + (Fire Protection Rule (45 FR 76602, 11/19/80))
- Fire Protection- RBS Inspection (River Bend 2019) + (Fire Protection- RBS)
- 10 CFR 36.27, Fire Protection + (Fire protection)
- 10 CFR 50.48, Fire Protection + (Fire protection)