Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Fessenheim + (Fessenheim)
- H.2 + (Field Presence)
- EPID:L-2017-LLR-0113 + (Fifth 10-Year Inservice Testing (IST) Program Interval Relief Requests PR-01 Through PR-06, and PR-09,)
- EPID:L-2017-LLR-0140 + (Fifth Inservice Inspection Interval Program Plan Relief Request No. RR-05)
- EPID:L-2017-LLR-0136 + (Fifth Inservice Inspection Interval Relief Request 15R-16)
- EPID:L-2017-LLR-0099 + (Fifth Ten Year Lnservice Inspection Interval, Relief Request No. 17-0N-001; Alternative to Extend the Code Case N-770, Inspection Item B Examination Frequency)
- EPID:L-2020-LLR-0127 + (Fifth Ten-Year Inservice Inspection Interval Relief Request No. 7 for Train a and B Component Cooling Water (CCW) Supply and Return Piping)
- EPID:L-2022-LLR-0032 + (Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10)
- EPID:L-2020-LLR-0040 + (Fifth Ten-Year Inservice Inspection Interval Relief Request No. 6)
- EPID:L-2024-LLR-0059 + (Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02)
- Figueroa Said Daibes + (Figueroa Said Daibes)
- 10 CFR 70.21, Filing + (License Applications)
- 10 CFR 14.11, Who May File a Claim + (Filing Procedures and Requirements)
- 10 CFR 14.21, Filing a Claim After an Agency Final Denial + (Filing a claim after an agency final denial)
- 10 CFR 2.110, Filing and Administrative Action On Submittals for Standard Design Approval Or Early Review of Site Suitability Issues + (Filing and administrative action on submittals for standard design approval or early review of site suitability issues)
- 10 CFR 62.11, Filing and Distribution of a Determination Request + (Request for a Commission Determination)
- 10 CFR 60.22, Filing and Distribution of Application + (Filing and distribution of application)
- 10 CFR 61.20, Filing and Distribution of Application + (Filing and distribution of application)
- 10 CFR 63.22, Filing and Distribution of Application + (Filing and distribution of application)
- 10 CFR 12.301, Filing and Service of Documents + (Procedures for Considering Applications)
- 10 CFR 13.26, Filing and Service of Papers + (Filing and service of papers)
- 10 CFR 2.602, Filing Fees + (Early Partial Decisions on Site Suitability-Construction Permit)
- NRC Generic Letter 84-18, Filing of Applications for Licenses and Amendments + (Filing of Applications for Licenses and Amendments)
- 10 CFR 2.101, Filing of Application + (Filing of application)
- 10 CFR 54.17, Filing of Application + (Filing of application)
- 10 CFR 50.30, Filing of Application for Licenses; Oath Or Affirmation + (Applications for Licenses, Certifications, and Regulatory Approvals; Form; Contents; Ineligibility of Certain Applicants)
- 10 CFR 72.16, Filing of Application for Specific License + (License Application, Form, and Contents)
- 10 CFR 52.15, Filing of Applications + (Filing of applications)
- 10 CFR 52.45, Filing of Applications + (Filing of applications)
- 10 CFR 52.75, Filing of Applications + (Filing of applications)
- 10 CFR 52.135, Filing of Applications + (Filing of applications)
- 10 CFR 52.155, Filing of Applications + (Filing of applications)
- 10 CFR 2.302, Filing of Documents + (Filing of documents)
- 10 CFR 61.72, Filing of Proposals for State and Tribal Participation + (Filing of proposals for State and Tribal participation)
- NRC Generic Letter 82-30, Filings Related to 10 CFR 50 Production and Utilization Facilities + (Filings Related to 10 CFR 50 Production and Utilization Facilities)
- EPID:L-2020-LLE-0071 + (Final ASP Analysis - Hatch 1 (LER 321-91-001))
- EPID:L-2019-PMP-0067 + (Final Accident Sequence Precursor Analysis - River Bend Station, Division '1' Standby Diesel Generator Speed Sensor Power Supply Failure (LER 458-2022-003) - Precursor)
- ML15194A015, Final Determination of Licensee Seismic Probabilistic Risk Assessments + (Final Determination of Licensee Seismic Probabilistic Risk Assessments)
- NRC Generic Letter 95-04, Final Disposition of the Systematic Evaluation Program Lessons-Learned Issues + (Final Disposition of the Systematic Evaluation Program Lessons-Learned Issues)
- EPID:L-2017-FPR-0025 + (Final Environmental Assessment and Finding of No Significant Impact for DTEs Updated Triennial Decommissioning Funding Plans for Fermi-2 ISFSI)
- EPID:L-2022-SLE-0002 + (Final Environmental Impact Statement Federal Register Notice)
- 10 CFR 51.90, Final Environmental Impact Statement--General + (Final Environmental Impact Statements--General Requirements)
- 10 CFR 51.99, Reserved + (Final Environmental Impact Statements--Rulemaking)
- 10 CFR 51.97, Final Environmental Impact Statement-Materials License + (Final Environmental Impact Statements-Materials Licenses)
- 10 CFR 51.95, Postconstruction Environmental Impact Statements + (Final Environmental Impact Statements-Production and Utilization Facilities)
- EPID:L-2017-RNW-0016 + (Final Interim Remedial Investigation Data Summary Report Westinghouse Columbia Fuel Fabrication Facility)
- EPID:L-2020-TOP-0024 + (Final SE MRP-227, Rev 1-A Supplemental Information)
- EPID:L-2016-TOP-0015 + (Final SER (Non-Prop) - TR-0116-21012, Revision 1, NuScale Power Critical Heat Flux Correlations.)
- EPID:L-2018-TOP-0029 + (Final Safety Evaluation for Framatome Inc. Topical Report EMF-93-177, Revision 1, Supplement 2P, Revision 1, Mechanical Design for BWR Fuel Channels: Z4B Material)
- EPID:L-2020-TOP-0023 + (Final Safety Evaluation for GEH QAPD Revision 15 Review)
- EPID:L-2020-TOP-0027 + (Final Safety Evaluation for Sargent & Lundy, LLC Nuclear Quality Assurance Program Topical Report SL-TR-1, Revision 25)
- EPID:L-2014-TOP-0004 + (Final Safety Evaluation for Topical Report ANP-10332P, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Loss of Coolant Accident Scenarios)
- EPID:L-2019-LRM-0014 + (Final Safety Evaluation for Topical Report ANP-10341P, the ORFEO-GAIA and ORFEO-NMGRID Critical Heat Flux Correlations)
- EPID:L-2018-TOP-0032 + (Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-15942-P-A/WCAP-15492-NP-A, Supplement 1, Revision 1, Material Changes for SVEA-96 Optima2 Fuel Assemblies)
- EPID:L-2014-TOP-0003 + (Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-17769-P/NP, Revision 0, Reference Fuel Design SVEA-96 Optima3)