Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Name" with value "Eliminate Manipulation from the Definition of Core Alteration". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • TSTF-047  + (Eliminate Manipulation from the Definition of Core Alteration)
  • TSTF-260  + (Eliminate Monthly Position Verification for Automatic Valves)
  • TSTF-599  + (Eliminate Periodic Surveillance Test of Simultaneous Start of Redundant Diesel Generators)
  • TSTF-191  + (Eliminate Reference to Manual Trip in Bases)
  • TSTF-048  + (Eliminate Repeated Information from LCO 3.0.7 Bases)
  • TSTF-313  + (Eliminate Requirement for DG Start from Standby Conditions)
  • TSTF-433  + (Eliminate SR 3.8.2.1, Note 2 from the PWR ITS Nuregs)
  • TSTF-439  + (Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO)
  • TAC:MF0617  + (Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO)
  • CAC:MF7496  + (Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO)
  • CAC:MF5026  + (TSTF-37)
  • TAC:MD6398  + (Increase Flexibility in Mode Restraints)
  • TAC:ME9470  + (Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO)
  • TAC:ME6360  + (Allow 7 Day Completion Time for a TURBINE-DRIVEN AFW Pump Inoperable)
  • TAC:MC7505  + (Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO)
  • TAC:MD8050  + (Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO)
  • TAC:MF5559  + (Provide RISK-INFORMED Extended Completion Times - RITSTF Initiative 4B)
  • TAC:MF5370  + (Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO)
  • TAC:MD4068  + (Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO)
  • TAC:MC7597  + (Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO)
  • TAC:MB2257  + (Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO)
  • CAC:MF6576  + (Provide RISK-INFORMED Extended Completion Times - RITSTF Initiative 4B)
  • TSTF-113  + (Eliminate Shutdown to Mode 4 for Inoperable Porvs)
  • TSTF-251  + (Eliminate TS 5.5.6, PRE-STRESSED Concrete Containment Tendon Surveillance Program)
  • TSTF-240  + (Eliminate Unnecessary Actions to Restore Compliance with the LCO)
  • TSTF-471  + (Eliminate Use of Term Core Alterations in Actions and Notes)