Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Name" with value "CNRO". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • C Edwards  + (C Edwards)
  • C Graves  + (C Graves)
  • C700  + (C700)
  • 10 CFR 76  + (CERTIFICATION OF GASEOUS DIFFUSION PLANTS)
  • 05000470  + (CESSAR-DC)
  • EPID:L-2019-LLR-0066  + (CFR 50.55a Relief Number WF3-RR-19-2, Proposed Alternative to Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 1 in Accordance with 10 CFR 50.55a(z)(2))
  • EPID:L-2024-LLR-0032  + (CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair)
  • EPID:L-2020-LLR-0119  + (CFR 50.55a Request Associated with the Fifth Ten-Year Inservice Testing Interval)
  • EPID:L-2022-LLR-0043  + (CFR 50.55a Request I4R-09 for the Fourth Inservice Inspection Program Interval, Relief from Examination of Reactor Vessel Flange Threads)
  • EPID:L-2020-LLR-0053  + (CFR 50.55a Request Number 2-TYP-4-RV-07 for Bottom Mounted Instrumentation Penetration Examinations)
  • EPID:L-2023-LLR-0026  + (CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components)
  • EPID:L-2023-LLR-0066  + (CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency)
  • EPID:L-2020-LLR-0052  + (CFR 50.55a Request Number: VRR4, Revision 0, Containment Isolation Valve Test Frequency)
  • EPID:L-2020-LLR-0049  + (CFR 50.55a Request Number: VRR5, Revision 0, Relief Valve Test Frequency)
  • EPID:L-2023-LLR-0008  + (CFR 50.55a Request RP-5 Regarding Inservice Pump Testing)
  • EPID:L-2023-LLR-0002  + (CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program)
  • EPID:L-2018-LLR-0099  + (CFR 50.55a Request for Alternative HNP-ISI-ALT-05-04 Implementation of BWRVIP Documents in Lieu of Certain 8-N-1 and 8-N-2 Examinations)
  • EPID:L-2018-LLR-0023  + (CFR 50.55a Requests No. 1-RR-5-9 Associated with the Firth Ten-Year Interval for the In-service Inspection Program)
  • EPID:L-2023-LLR-0007  + (CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv))
  • EPID:L-2021-LLR-0072  + (CFR 50.55a Requests RP-1, RP-2, RP-3, and RP-4 Regarding Inservice Pump and Valve Testing)
  • EPID:L-2021-LLA-0033  + (CH-TRAMPAC R6 - February 2021)
  • TSTF-507  + (CLIIP Traveler to Increase Standardization)
  • TAC:MD9433  + (TSTF-6)
  • Category:Letter type:CNL  + (CNL)
  • EPID:L-2025-LLE-0007  + (CNL-25-013 SQN U2 Request for Exemption from Part 26 Work Hours)
  • EPID:L-2018-LLA-0278  + (COL Docs - Acceptance Letter for Vogtle, Unit 3 Only, LAR-18-026 Column Line 1 Wall Reinforcement Area Change)
  • EPID:L-2017-LLA-0376  + (COL Docs - Draft RAI #1 for LAR-17-039, Unqualified Service Level 1 Coatings Program)
  • EPID:L-2017-LLA-0143  + (COL Docs - Draft RAI No.2 on Vogtle LAR-17-010 Pipe Rupture Hazard and Flooding Analysis)
  • EPID:L-2017-LLA-0098  + (COL Docs - FW: LAR-17-028 RAI Response Supplement)
  • EPID:L-2017-LLA-0085  + (COL Docs - Final RAI for Alt- 7 for Vogtle 3and 4)
  • EPID:L-2018-LLA-0005  + (COL Docs - Vogtle LAR-17-043 Final Audit Plan)
  • EPID:L-2018-LLA-0225  + (COL Docs - Vogtle LAR-18-021 PORV Noise Mitigation - Acceptance Letter)
  • EPID:L-2020-LLA-0064  + (COLR Limerick 1, Rev. 15, Core Operating Limits Report for Limerick Generating Station Unit 1 Reload 18 Cycle 19)
  • EPID:L-2021-LLE-0006  + (COVID-19 Related Request for Exemption from Part 26 Work Hours Requirements)
  • EPID:L-2021-LLE-0017  + (COVID-19 Related Request for Exemption from Part 26 Work Hours Requirements)
  • EPID:L-2021-LLE-0041  + (COVID-19 Related Request for Exemption from Part 26 Work Hours Requirements)
  • EPID:L-2021-LLE-0042  + (COVID-19 Related Request for Exemption from Part 26 Work Hours Requirements)
  • EPID:L-2020-LLE-0000  + (COVID-19 Related Request for Exemption from Part 26 Work Hours Requirements)
  • EPID:L-2022-LLE-0006  + (COVID-19 Related Request for Exemption from Part 26 Work Hours Requirements)
  • EPID:L-2022-LLE-0003  + (COVID-19 Related Request for Exemption from Part 26 Work Hours Requirements)
  • EPID:L-2021-LLE-0058  + (COVID-19 Related Request for Exemption from Part 26 Work Hours Requirements)
  • Category:Letter type:CP  + (CP)
  • 10 CFR 10  + (CRITERIA AND PROCEDURES FOR DETERMINING ELIGIBILITY FOR ACCESS TO RESTRICTED DATA OR NATIONAL SECURITY INFORMATION OR AN EMPLOYMENT CLEARANCE)
  • 10 CFR 11  + (CRITERIA AND PROCEDURES FOR DETERMINING ELIGIBILITY FOR ACCESS TO OR CONTROL OVER SPECIAL NUCLEAR MATERIAL)
  • 10 CFR 62  + (CRITERIA AND PROCEDURES FOR EMERGENCY ACCESS TO NON-FEDERAL AND REGIONAL LOW-LEVEL WASTE DISPOSAL FACILITIES)
  • Category:Letter type:CY  + (CY)
  • Cadmium  + (Cadmium)
  • Caesium  + (Caesium)
  • Calcium  + (Calcium)
  • Cale Young  + (Cale Young)