Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 10 CFR 75.33, Accounting Reports + (Accounting reports)
- Acevedo Marcos Rolon + (Acevedo Marcos Rolon)
- 10 CFR 9.60, Acknowledgement of Requests + (NRC Procedures for Processing Requests)
- Acquisition Management Division + (Acquisition Management Division)
- 10 CFR 70.41, Authorized Use of Special Nuclear Material + (Acquisition, Use, and Transfer of Special Nuclear Material, Creditors' Rights)
- Actinium + (Actinium)
- 10 CFR 10.34, Action by the Commission + (Action by the Commission)
- 10 CFR 10.33, Action by the Deputy Executive Director for Corporate Management and Chief Information Officer + (Action by the Deputy Executive Director for Corporate Management and Chief Information Officer)
- 10 CFR 2.103, Action On Applications for Byproduct, Source, Special Nuclear Material, Facility and Operator Licenses + (Action on applications for byproduct, source, special nuclear material, facility and operator licenses)
- EPID:L-2020-LLE-0018 + (Actions Related to the Requirements for Work Hour Controls During the Coronavirus Disease 2019 Public Health Emergency)
- NRC Generic Letter 80-33, Actions Req. From OL Applicants of B&W Designed NSSS Resulting From NRC B&O Task Force Review of TMI2 Accident + (Actions Req. From OL Applicants of B&W Designed NSSS Resulting From NRC B&O Task Force Review of TMI2 Accident)
- NRC Generic Letter 80-20, Actions Req. From OL Applicants of NSSS Designs by W and CE Resulting From NRC B&O Task Force Review of TMI2 Accident + (Actions Req. From OL Applicants of NSSS Designs by W and CE Resulting From NRC B&O Task Force Review of TMI2 Accident)
- 10 CFR 10.31, Actions On the Recommendations + (Actions on the recommendations)
- NRC Generic Letter 89-02, Actions to Improve the Detection of Counterfeit and Fraudulently Marketed Products + (Actions to Improve the Detection of Counterfeit and Fraudulently Marketed Products)
- 10 CFR 30.3 + (Activities requiring license)
- Ada Bowie + (Ada Bowie)
- Adakou Foli + (Adakou Foli)
- Adam Gendelman + (Adam Gendelman)
- Adam Glazer + (Adam Glazer)
- Adam Janik + (Adam Janik)
- Adam Nielsen + (Adam Nielsen)
- Adam Ruh + (Adam Ruh)
- Adam Schwartzman + (Adam Schwartzman)
- Adam Sharif + (Adam Sharif)
- Adam Tucker + (Adam Tucker)
- Adam Wilson + (Adam Wilson)
- Adam Ziedonis + (Adam Ziedonis)
- TSTF-477 + (Add Action for Two Inoperable Control Room AC Subsystems)
- TAC:MF2528 + (Add Action for Two Inoperable Control Room AC Subsystems)
- TAC:MF7224 + (Add Action for Two Inoperable Control Room AC Subsystems)
- TAC:MD5796 + (Add Action for Two Inoperable Control Room AC Subsystems)
- TAC:ME5748 + (Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B)
- TAC:MD6352 + (Add Action for Two Inoperable Control Room AC Subsystems)
- TAC:MD6770 + (Add Action for Two Inoperable Control Room AC Subsystems)
- TAC:MF3374 + (Add Action for Two Inoperable Control Room AC Subsystems)
- TAC:MD5769 + (Add Action for Two Inoperable Control Room AC Subsystems)
- TAC:MD6137 + (Add Action for Two Inoperable Control Room AC Subsystems)
- TSTF-553 + (Add Action for Two Inoperable Creatcs Trains)
- TAC:MF7061 + (Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6B and 6C)
- TAC:MF6668 + (Add Action for Two Inoperable Creatcs Trains)
- TSTF-306 + (Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration)
- CAC:MF5026 + (TSTF-37)
- TAC:ME7720 + (Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration)
- TAC:ME0157 + (Control Room Habitability)
- TAC:ME5192 + (Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration)
- TAC:ME3713 + (Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration)
- TAC:ME5939 + (Minimum Vs. Steady State Voltage and Frequency)
- TAC:MB8958 + (Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration)
- CAC:MG0150 + (Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration)
- TSTF-016 + (Add Action to LCO 3.8.9 to Require Entry Into LCO 3.0.0 When There is a Loss of Function)
- TSTF-145 + (Add Action to Verify Flow Path is Isolated When 2 Civs Inoperable)