Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- EPID:L-2019-LLA-0158 + (ATR-FFSC, Docket 71-9330, Amd for CoC Rev 14)
- NRC Generic Letter 79-53, ATWS + (ATWS)
- NRC Generic Letter 79-12, ATWS – Enclosing Letter to GE, with NUREG-0460, Vol. 3 + (ATWS – Enclosing Letter to GE, with NUREG-0460, Vol. 3)
- Aa-Ron Margerum + (Aa-Ron Margerum)
- Aaron Armstrong + (Aaron Armstrong)
- Aaron Mccraw + (Aaron Mccraw)
- Aaron Sanders + (Aaron Sanders)
- Aaron Zamecnik + (Aaron Zamecnik)
- Abba-Joseph Awano + (Abba-Joseph Awano)
- Abegail Olarte + (Abegail Olarte)
- Abilene Christian University + (Abilene Christian University)
- EPID:L-2022-NFW-0002 + (Abilene Christian University Construction Permit Application Preliminary Safety Analysis Report Revision 1)
- EPID:L-2022-NFC-0016 + (Abilene Christian University, Slides for Partially Closed September 18, 2023, Meeting on MC&A)
- Abimbola Aregbe + (Abimbola Aregbe)
- Abunasser Shaheen + (Abunasser Shaheen)
- 10 CFR 26.91, Acceptable Devices for Conducting Initial and Confirmatory Tests for Alcohol and Methods of Use + (Acceptable devices for conducting initial and confirmatory tests for alcohol and methods of use)
- NRC Generic Letter 79-57, Acceptance Criteria for the Mark I Containment Long Term Program + (Acceptance Criteria for the Mark I Containment Long Term Program)
- LIC-109, Acceptance Review Procedures + (Acceptance Review Procedures)
- EPID:L-2021-LLA-0086 + (Acceptance Review of the Model No. TN-40 Package)
- EPID:2023 + (Acceptance and Review Schedule Historical and Cultural Resources License Amendment Request - EPID: 2023-LLA-0026)
- 10 CFR 2.603, Acceptance and Docketing of Application for Early Review of Site Suitability Issues In a Construction Permit Proceeding + (Acceptance and docketing of application for early review of site suitability issues in a construction permit proceeding)
- 10 CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Nuclear Power Reactors + (Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors)
- 10 CFR 50.60, Acceptance Criteria for Fracture Prevention Measures for Lightwater Nuclear Power Reactors for Normal Operation + (Acceptance criteria for fracture prevention measures for lightwater nuclear power reactors for normal operation)
- ML17004A135, Acceptance of Requested Licensing Re: Cyber Security Implementation Schedule + (Acceptance of Requested Licensing Re: Cyber Security Implementation Schedule)
- 10 CFR 14.43 + (Acceptance of payment constitutes release)
- 10 CFR 2.1007, Access + (Access)
- IP 71130.01, Access Authorization + (Access Authorization)
- Access Authorization Inspection (Arkansas Nuclear 2021) + (Access Authorization)
- Access Authorization Inspection (Braidwood 2021) + (Access Authorization)
- Access Authorization Inspection 2 (Braidwood 2021) + (Access Authorization)
- Access Authorization Inspection (Browns Ferry 2020) + (Access Authorization)
- Access Authorization Inspection 2 (Browns Ferry 2020) + (Access Authorization)
- Access Authorization Inspection (Byron 2021) + (Access Authorization)
- Access Authorization Inspection (Calvert Cliffs 2020) + (Access Authorization)
- Access Authorization Inspection (Clinton 2021) + (Access Authorization)
- Access Authorization Inspection 2 (Clinton 2021) + (Access Authorization)
- Access Authorization Inspection (Davis Besse 2021) + (Access Authorization)
- Access Authorization Inspection (Dresden 2021) + (Access Authorization)
- Access Authorization Inspection (Farley 2020) + (Access Authorization)
- Access Authorization Inspection 2 (Farley 2020) + (Access Authorization)
- Access Authorization Inspection (Fermi 2021) + (Access Authorization)
- Access Authorization Inspection (Ginna 2019) + (Access Authorization)
- Access Authorization Inspection (Harris 2021) + (Access Authorization)
- Access Authorization Inspection (Hatch 2020) + (Access Authorization)
- Access Authorization Inspection 2 (Hatch 2020) + (Access Authorization)
- Access Authorization Inspection (Hope Creek 2021) + (Access Authorization)
- Access Authorization Inspection (LaSalle 2021) + (Access Authorization)
- Access Authorization Inspection (Limerick 2020) + (Access Authorization)
- Access Authorization Inspection (Millstone 2021) + (Access Authorization)
- Access Authorization Inspection (Monticello 2021) + (Access Authorization)
- Access Authorization Inspection (North Anna 2021) + (Access Authorization)