Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- EPID:L-2021-LRO-0014 + (2020 Steam Generator Tube Inspection Report)
- 2020Q1 + (2020Q1)
- 2020Q2 + (2020Q2)
- 2020Q3 + (2020Q3)
- 2020Q4 + (2020Q4)
- EPID:L-2022-LLA-0105 + (2021 Annual Radiological Environmental Operating Report)
- 2021Q1 + (2021Q1)
- 2021Q2 + (2021Q2)
- 2021Q3 + (2021Q3)
- 2021Q4 + (2021Q4)
- 2022Q1 + (2022Q1)
- 2022Q2 + (2022Q2)
- 2022Q3 + (2022Q3)
- 2022Q4 + (2022Q4)
- EPID:L-2023-LLR-0040 + (2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report)
- 2023Q1 + (2023Q1)
- 2023Q2 + (2023Q2)
- 2023Q3 + (2023Q3)
- 2023Q4 + (2023Q4)
- EPID:L-2024-LLR-0017 + (2024 Rpn - CGD Inspection Information Request)
- 2024Q1 + (2024Q1)
- 2024Q2 + (2024Q2)
- 2024Q3 + (2024Q3)
- 2024Q4 + (2024Q4)
- 2025Q1 + (2025Q1)
- 2025Q3 + (2025Q3)
- 2025Q4 + (2025Q4)
- EPID:L-2022-LRO-0145 + (23rd Refueling Outage Steam Generator Tube Inspection Report)
- EPID:L-2021-LLA-0130 + (2nd Round of RAIs for the Model No. HI-STAR 80 Package)
- EPID:L-2021-LLA-0054 + (3 to Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, 10 CFR 50.59 Summary Report and Revised NRC Commitments Report)
- TSTF-331 + (3.1.5 Bases Change)
- TSTF-158 + (3.1.5 Safety Rod Insertion Limits, Required Action A.1 Deletion)
- TSTF-344 + (3.1.8 and 3.1.9 SR Frequency Change)
- TSTF-135 + (3.3 - RPS and ESFAS Instrumentation)
- TSTF-264 + (3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRS)
- TAC:MC6651 + (3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRS)
- CAC:MF5026 + (TSTF-37)
- TAC:MC2023 + (3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRS)
- TSTF-261 + (3.4.5 and 3.4.6 - Omit LCO Reference to at Least PER Writer'S Guide)
- TSTF-262 + (3.4.6, 3.4.7, and 3.4.8: Allow Dhr/Rhr/Sdc Pumps to Be Aligned for LPI)
- TSTF-155 + (3.5.1 Core Flood TANKS- Deletion of Condition D and Modification of Condition C)
- TSTF-199 + (3.8.4 - Delete Maintenance Surveillances)
- EPID:L-2022-OLL-0012 + (301 Post Exam Comments)
- 10 CFR 4.504 + (4.504--4.509 Reserved)
- 10 CFR 4.512 + (4.512--4.529 Reserved)
- 10 CFR 4.531 + (4.531--4.539 Reserved)
- 10 CFR 4.541 + (4.541--4.548 Reserved)
- 10 CFR 4.552 + (4.552--4.559 Reserved)
- 10 CFR 4.561 + (4.561--4.569 Reserved)
- 10 CFR 50.73(a)(2)(i)(C), 50.54(x) TS Deviation + (50.54(x) TS Deviation)