Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Name" with value "§72.79 Facility information and <strong>verification.</strong>". Since there have been only a few results, also nearby values are displayed.

Showing below up to 49 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

    • EPID:L-2020-LLA-0090  + ((07/30/2020) E-mail from M. Mirzai to R. Guzman Permanently Defueled Technical Specifications License Amendment Request Boral Surveillance Monitoring Program)
    • (Adm) Steven Savoy  + ((Adm) Steven Savoy)
    • EPID:L-2020-LRM-0082  + ((Ano), Pre-Submittal Meeting with NRC - Request to Extend Allowable Outage Time (AOT) for the Emergency Cooling Pond (ECP))
    • EPID:L-2022-LLR-0002  + ((CPNPP) - ASME OM Inservice Test Program Relief Request SNB-3, Snubber Inservice Program Third Internal Extension)
    • EPID:L-2019-LLQ-0002  + ((CPNPP) - Biennial Review of Procedures and Station Operations Review Committee Meetings)
    • EPID:L-2023-LLM-0000  + ((CPNPP) - Decommissioning Report)
    • EPID:L-2020-LLR-0106  + ((CPNPP) - Inservice Test (IST) Program Request to Use Later Code Edition)
    • EPID:L-2022-LLA-0170  + ((CPNPP) - Non-Voluntary License Amendment Request to Revise Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications)
    • EPID:L-2021-LLL-0022  + ((CPNPP) - Relief Request 1A4-3 for Continued Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and 2 Piping Welds for Unit 1 Inservice Inspection)
    • EPID:L-2022-LLR-0058  + ((CPNPP) - Relief Request Application P-1, Inservice Testing (IST))
    • EPID:L-2023-LLE-0023  + ((CPNPP) - Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule)
    • EPID:L-2020-LLE-0235  + ((CPNPP) - Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(l) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic)
    • EPID:L-2023-LLE-0037  + ((CPNPP) - Revised Requested Compliance Date - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation)
    • EPID:L-2022-LRO-0144  + ((CPNPP) - Unit 1 Refueling Outage 22 (1RF22) Steam Generator 180 Day Report)
    • EPID:L-2022-LRO-0065  + ((CPNPP) Unit 2 Refueling Outage 19 (2RF19) Steam Generator 180 Day Report)
    • EPID:L-2024-LLR-0053  + ((Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality)
    • EPID:L-2023-LLA-0058  + ((Cpnpp), Reply to a Notice of Violation Transmitted Via NRC Letter from Gregory Werner to Ken Peters Dated 11/01/2022, Comanche Peak Nuclear Power Plant, Units 1 and 2 Integrated Inspection Report 05000445/2022003 .)
    • EPID:L-2020-LLR-0066  + ((Exelon) Requests an Alternative from Certain Reporting Requirements of ASME Boiler and Pressure Vessel (B&Pv) Code, Section XI, IWA-1400, IWA-6240, and 10 CFR 50.55a(b)(2)(xxxii))
    • EPID:L-2024-DFR-0002  + ((Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan)
    • EPID:L-2018-LLA-0116  + ((GGNS) - License Amendment Request: Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6)
    • EPID:L-2020-LLE-0189  + ((IP2 and IP3) - Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic)
    • EPID:L-2019-LLA-0071  + ((Lgs), Units 1 and 2 - Response to Requested Supplemental Information for a One Time Alternative Request Pertaining to Dry Shield Canisters Equipped with Boral Neutron Absorber Plates)
    • (Ogc) Steven Savoy  + ((Ogc) Steven Savoy)
    • EPID:L-2020-LRM-0084  + ((PINGP) COVID-19 Exemption Request for the 2020 Biennial Emergency Preparedness Exercise)
    • (Res) Tom Boyce  + ((Res) Tom Boyce)
    • (Schwartzman) Jennifer Holzman  + ((Schwartzman) Jennifer Holzman)
    • EPID:L-2021-LLE-0056  + ((Songs), Independent Spent Fuel Storage Installation (ISFSI) - Request for Exemption from 10 CFR 72.106(b))
    • EPID:L-2023-LLE-0016  + ((TMI-2), Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E)
    • EPID:L-2023-LLE-0091  + ((TMI-2), Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation)
    • EPID:L-2022-DPR-0002  + ((TMl-2) - License Amendment Request - Three Mile Island, Unit 2, Decommissioning Technical Specifications, Response to Questions)
    • EPID:L-2023-SPR-0004  + ((U)Submission for Approval of the Standard Practice and Procedures Plan (Sppp) and Transportation Plan for Global Laser Enrichment Headquarters)
    • EPID:L-2020-LLR-0141  + ((VCSNS) Unit 1 - Alternative Requests RR-4-25 for Elimination of Reactor Pressure Vessel Threads in Flange Examination for the Remainder of the Fourth 10-Year ISI Interval)
    • EPID:L-2020-LRO-0084  + ((VCSNS) Unit 1 - Special Report (Spr) 2020002 - Steam Generator Tube Inspection Report)
    • EPID:L-2020-LLR-0077  + ((Vcsns), Unit 1 - Alternative Requests RR-4-19 and RR-4-21, Use of a Performance Based Testing Frequency for Check Valves as Alternatives to the Requirements of the American Society of Mechanical Engineers)
    • EPID:L-2017-LLA-0348  + ((Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change)
    • EPID:L-2018-LLA-0267  + ((Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.2)
    • EPID:L-2023-LLA-0157  + ((Vcsns), Unit 1 - License Amendment Request - Inverter Allowed Outage Time (AOT) Extension)
    • EPID:L-2021-LLA-0094  + ((Vcsns), Unit 1 - Proposed Amendment to Relocate Unit Staff Qualification from Technical Specifications to Quality Assurance Program Description (QAPD))
    • EPID:L-2022-LLR-0033  + ((Vcsns), Unit 1, Potential Condition Prohibited by Technical Specification 3.8.1.1)
    • EPID:L-2024-LLE-0003  + ((Vnc) Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation)
    • EPID:L-2019-LLA-0230  + ((Waterford 3) - License Amendment Request to Revise Technical Specification 3.8.1.1 Surveillance Requirements)
    • EPID:L-2019-LLA-0203  + ((Waterford 3) - Revision to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual)
    • 10 CFR 50.76, . Licensee'S Change of Status; Financial Qualifications  + (. Licensee's change of status; financial qualifications)
    • EPID:L-2023-LLL-0013  + (0 to Updated Final Safety Analysis Report)
    • EPID:L-2018-LRM-0021  + (04/10/2018 Public Teleconference Meeting Slides MPS3 C Charging Pump)
    • EPID:L-2022-SPR-0003  + (09-14-2021 Ltr: Exemption Request for NFS NRC-Observed Force-on-Force Exercise)
    • EPID:L-2021-EPR-0003  + (09-17-2021 Ltr: Exemption Request for NFS Biennial Emergency Preparedness Exercise)
    • EPID:L-2017-PMP-0010  + (1 OF 3, LER 16-004-01 for Columbia Generating Station Regarding Automatic Scram Due to Off-site Load Reject)