- EPID:L-2022-LLR-0058 + ((CPNPP) - Relief Request Application P-1, Inservice Testing (IST))
- EPID:L-2023-LLE-0023 + ((CPNPP) - Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule)
- EPID:L-2020-LLE-0235 + ((CPNPP) - Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(l) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic)
- EPID:L-2023-LLE-0037 + ((CPNPP) - Revised Requested Compliance Date - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation)
- EPID:L-2022-LRO-0144 + ((CPNPP) - Unit 1 Refueling Outage 22 (1RF22) Steam Generator 180 Day Report)
- EPID:L-2022-LRO-0065 + ((CPNPP) Unit 2 Refueling Outage 19 (2RF19) Steam Generator 180 Day Report)
- EPID:L-2024-LLR-0053 + ((Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality)
- EPID:L-2023-LLA-0058 + ((Cpnpp), Reply to a Notice of Violation Transmitted Via NRC Letter from Gregory Werner to Ken Peters Dated 11/01/2022, Comanche Peak Nuclear Power Plant, Units 1 and 2 Integrated Inspection Report 05000445/2022003 .)
- EPID:L-2020-LLR-0066 + ((Exelon) Requests an Alternative from Certain Reporting Requirements of ASME Boiler and Pressure Vessel (B&Pv) Code, Section XI, IWA-1400, IWA-6240, and 10 CFR 50.55a(b)(2)(xxxii))
- EPID:L-2024-DFR-0002 + ((Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan)
- EPID:L-2018-LLA-0116 + ((GGNS) - License Amendment Request: Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6)
- EPID:L-2020-LLE-0189 + ((IP2 and IP3) - Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic)
- EPID:L-2019-LLA-0071 + ((Lgs), Units 1 and 2 - Response to Requested Supplemental Information for a One Time Alternative Request Pertaining to Dry Shield Canisters Equipped with Boral Neutron Absorber Plates)
- (Ogc) Steven Savoy + ((Ogc) Steven Savoy)
- EPID:L-2020-LRM-0084 + ((PINGP) COVID-19 Exemption Request for the 2020 Biennial Emergency Preparedness Exercise)
- (Res) Tom Boyce + ((Res) Tom Boyce)
- (Schwartzman) Jennifer Holzman + ((Schwartzman) Jennifer Holzman)
- EPID:L-2021-LLE-0056 + ((Songs), Independent Spent Fuel Storage Installation (ISFSI) - Request for Exemption from 10 CFR 72.106(b))
- EPID:L-2023-LLE-0016 + ((TMI-2), Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E)
- EPID:L-2023-LLE-0091 + ((TMI-2), Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation)
- EPID:L-2022-DPR-0002 + ((TMl-2) - License Amendment Request - Three Mile Island, Unit 2, Decommissioning Technical Specifications, Response to Questions)
- EPID:L-2023-SPR-0004 + ((U)Submission for Approval of the Standard Practice and Procedures Plan (Sppp) and Transportation Plan for Global Laser Enrichment Headquarters)
- EPID:L-2020-LLR-0141 + ((VCSNS) Unit 1 - Alternative Requests RR-4-25 for Elimination of Reactor Pressure Vessel Threads in Flange Examination for the Remainder of the Fourth 10-Year ISI Interval)
- EPID:L-2020-LRO-0084 + ((VCSNS) Unit 1 - Special Report (Spr) 2020002 - Steam Generator Tube Inspection Report)
- EPID:L-2020-LLR-0077 + ((Vcsns), Unit 1 - Alternative Requests RR-4-19 and RR-4-21, Use of a Performance Based Testing Frequency for Check Valves as Alternatives to the Requirements of the American Society of Mechanical Engineers)
- EPID:L-2017-LLA-0348 + ((Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change)
- EPID:L-2018-LLA-0267 + ((Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.2)
- EPID:L-2023-LLA-0157 + ((Vcsns), Unit 1 - License Amendment Request - Inverter Allowed Outage Time (AOT) Extension)
- EPID:L-2021-LLA-0094 + ((Vcsns), Unit 1 - Proposed Amendment to Relocate Unit Staff Qualification from Technical Specifications to Quality Assurance Program Description (QAPD))
- EPID:L-2022-LLR-0033 + ((Vcsns), Unit 1, Potential Condition Prohibited by Technical Specification 3.8.1.1)
- EPID:L-2024-LLE-0003 + ((Vnc) Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation)
- EPID:L-2019-LLA-0230 + ((Waterford 3) - License Amendment Request to Revise Technical Specification 3.8.1.1 Surveillance Requirements)
- EPID:L-2019-LLA-0203 + ((Waterford 3) - Revision to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual)
- 10 CFR 50.76, . Licensee'S Change of Status; Financial Qualifications + (. Licensee's change of status; financial qualifications)
- EPID:L-2023-LLL-0013 + (0 to Updated Final Safety Analysis Report)
- EPID:L-2018-LRM-0021 + (04/10/2018 Public Teleconference Meeting Slides MPS3 C Charging Pump)
- EPID:L-2022-SPR-0003 + (09-14-2021 Ltr: Exemption Request for NFS NRC-Observed Force-on-Force Exercise)
- EPID:L-2021-EPR-0003 + (09-17-2021 Ltr: Exemption Request for NFS Biennial Emergency Preparedness Exercise)
- EPID:L-2017-PMP-0010 + (1 OF 3, LER 16-004-01 for Columbia Generating Station Regarding Automatic Scram Due to Off-site Load Reject)