Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-81-413, Forwards Response to NRC Request for Addl Info Re Fsar.Matl Will Be Incorporated in Future FSAR Amend + (14:14:39, 8 January 2025)
- L-81-400, Forwards Response to 810824 Request for Addl Info Re Evacuation Time Estimates.Util Adopted Roadway Network Illustrated in Attached Figures C & D for Estimating Roadway Capacities + (14:14:41, 8 January 2025)
- L-81-396, Forwards Responses to Requests for Addl Info.Responses Will Be Incorporated in Future Amend to FSAR + (14:14:42, 8 January 2025)
- L-81-394, Forwards Responses to NRC Request for Addl Info Re Fsar. Info Will Be Incorporated in Future Amend + (14:14:44, 8 January 2025)
- ML17266A496 + (14:14:46, 8 January 2025)
- L-81-384, Forwards Responses to NRC Requests for Addl Info on Open Items in FSAR Section 7 Re Instrumentation & Control Sys. Responses Will Be Incorporated in Future FSAR Amend. Aperture Cards Are Available in PDR + (14:14:47, 8 January 2025)
- L-81-389, Forwards Response to NRC Requests for Addl Info Which Have Not Been Formally Submitted on Docket.Responses Will Be Incorporated in Future Amend to FSAR + (14:14:49, 8 January 2025)
- L-81-381, Forwards Responses to NRC Requests for Addl Info.Responses Will Be Incorporated in FSAR Amend + (14:14:50, 8 January 2025)
- ML17266A492 + (14:14:52, 8 January 2025)
- L-81-362, Forwards Response to NRC Request for Addl Info Re Fsar.Info Will Be Incorporated in Future Amend + (14:14:53, 8 January 2025)
- L-81-348, Forwards Addl Info & Responses to NRC Questions for Ser. Responses Will Be Incorporated Into Future FSAR Amend + (14:14:54, 8 January 2025)
- L-81-337, Forwards Util Responses to NRC Requests for Addl Info Re Fsar.Responses Will Be Incorporated Into FSAR in Future Amend + (14:14:55, 8 January 2025)
- L-81-326, Responds to Generic Ltr 81-01 Re Qualification of Insp,Exam & Testing & Audit Personnel.Revision of App C of Util Topical QA Rept Issued 810723 Addresses Ltr Concerns + (14:14:57, 8 January 2025)
- L-81-314, Forwards Revision 4 to Topical QA Rept,In Respoonse to NRC 810514 Request + (14:14:59, 8 January 2025)
- ML17266A481 + (14:14:59, 8 January 2025)
- ML17266A477 + (14:15:00, 8 January 2025)
- ML17266A473 + (14:15:01, 8 January 2025)
- ML17266A474 + (14:15:01, 8 January 2025)
- ML17266A472 + (14:15:02, 8 January 2025)
- ML17266A467 + (14:15:03, 8 January 2025)
- ML17266A471 + (14:15:03, 8 January 2025)
- ML17266A469 + (14:15:03, 8 January 2025)
- ML17266A466 + (14:15:04, 8 January 2025)
- ML17266A463 + (14:15:05, 8 January 2025)
- 05000335/LER-1981-025-03, /03L-0:on 810430,during Reactor Protection Sys Logic Matrix Test While at 100% Power,Trip Unit Failed to Illuminate as Required.Caused by Bad Connection to Cabinet. Connector Cleaned.Unit Reinserted Into Sys Cabinet + (14:15:06, 8 January 2025)
- L-81-120, Requests Commission Enforcement Assistance to Vindicate NRC Conferred Rights to Immediate Resource Recovery Plant Startup + (14:15:07, 8 January 2025)
- ML17266A460 + (14:15:09, 8 January 2025)
- ML17266A459 + (14:15:10, 8 January 2025)
- 05000335/LER-1981-018-03, /03L-0:on 810416,after Reactor Trip Due to Transformer Failure,Block Valve VL403 for Power Operated Relief Valve Would Not Close.Possibly Caused by Tight Adjustment to Packing Gland + (14:15:11, 8 January 2025)
- 05000335/LER-1981-016-03, /03L-0:on 810407,during Routine Surveillance Testing,Rwt Outlet Valve MV-07-1A Failed to Reopen Electrically.Caused by Faulty Mechanical Stop Mechanism. Mechanism Was Repaired & Checked Satisfactorily + (14:15:12, 8 January 2025)
- 05000335/LER-1981-017-03, /03L-0:on 810417,during Cold Shutdown, Surveillance Stroke Times for HCV 14-1,2,6 & 7 Were Out of Spec.Caused by Approved Mod to Valves to Facilitate Opening in Emergency.Minor Design Change Performed + (14:15:14, 8 January 2025)
- L-81-207, Advises That Response to Fire Protection Rule Items Requested in NRC Was Contained in Util + (14:15:15, 8 January 2025)
- ML17266A453 + (14:15:16, 8 January 2025)
- ML17266A452 + (14:15:16, 8 January 2025)
- ML17266A450 + (14:15:17, 8 January 2025)
- L-81-175, Forwards Applied Biology,Inc Jan 1981 Rept Successful Relocation of Sea Turtle Nests Near St Lucie Plant, Hutchinson Island,Fl + (14:15:18, 8 January 2025)
- ML17266A446 + (14:15:19, 8 January 2025)
- 05000335/LER-1981-015-03, /03L-0:on 810323,acoustic Flow Position Indicator Was Found to Be Inoperable During Routine Surveillance. Probably Caused by Transducer or Associated Cable.Spare Transducer & Cable Installed + (14:15:20, 8 January 2025)
- 05000335/LER-1981-014-03, /03L-0:on 810319,high Containment Radiation Monitoring Channel B for Containment Isolation Signal Failed Low.Caused by Faulty Power Supply Units in Control Room Display Module.Units Replaced + (14:15:22, 8 January 2025)
- 05000335/LER-1981-003-09, /09X-1:on 810123,several Plant Masonry Walls Did Not Meet IE Bulletin 80-11 Criteria.Caused by Design Problems.Mods Completed by 810205 + (14:15:23, 8 January 2025)
- 05000335/LER-1981-010-03, /03L-0:on 810225,inlet Damper to Filters Moved in Open Direction During Testing to Determine If Control Room & Technical Support Ctr Could Be Pressurized W/Makeup Per Tech Spec.Caused by Personnel Error.Flow Adjusted + (14:15:24, 8 January 2025)
- 05000335/LER-1977-022, Updated LER 77-022/01T-1:on 770408,design Study Determined That Installed Atmospheric Steam Dump Valves Did Not Meet Criteria for Cooldown to Shutdown Cooling Window.Caused by Design Error in Sizing of Steam Dump Valves + (14:15:26, 8 January 2025)
- ML17266A440 + (14:15:27, 8 January 2025)
- ML17266A438 + (14:15:27, 8 January 2025)
- 05000335/LER-1981-013-03, /03L-0:on 810216,channel B Hot Leg Reactor Temp Detector Output for Loop 1B Failed Low.Caused by Blown Fuse in Temp Transmitter Power Supply,Fisher Porter Model 55GL1154.Power Supply Replaced & Tested + (14:15:28, 8 January 2025)
- 05000335/LER-1981-012-03, /03L-0:on 810221-28,one of Two Chlorine Detectors in North Control Room Air Intake Failed Several Times. Apparently Caused by Loose Connection on Reset Button.Button Replaced + (14:15:30, 8 January 2025)
- 05000335/LER-1981-009-03, /03L-0:on 810214,primary Digital Data Processing Sys Line Printer Experienced Intermittent Operation Over 16-h.Caused by Line Printer Dampener Failure.Dampener Replaced & Line Printer Returned to Svc + (14:15:34, 8 January 2025)
- 05000335/LER-1981-011-03, /03L-0:on 810226,containment Radiation Monitor Channel a Setpoint Exceeded Tech Spec Limits.Caused by Trip Bistable Setpoint Drift.Setpoint Readjusted + (14:15:36, 8 January 2025)
- ML17266A433 + (14:15:37, 8 January 2025)
- ML17266A432 + (14:15:38, 8 January 2025)
- ML17266A431 + (14:15:38, 8 January 2025)