Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000397/LER-1992-021, :on 920513,discovered That Certain QC-2 Instruments Were Not Appropriately Isolated from QC-1.Caused by Less than Adequate Design.No Corrective Action Was Taken + (10:26:46, 8 January 2025)
- ML17289A608 + (10:26:47, 8 January 2025)
- GO2-92-130, Requests Waiver of Compliance from TS 3.6.5.1.a Re Secondary Containment Integrity & 3.6.3.a Re Primary Containment Isolation Valves,Per Generic Ltr 89-10 + (10:26:48, 8 January 2025)
- GO2-92-133, Discusses Implementation of Phase II Emergency Operating Procedures,Per Insp Rept 50-397/91-27 & Corrective Action Plan for Licensed Operator Requalification Program.Proposes That Phase I of Procedures Be Used Through Nov 1992 Exam + (10:26:49, 8 January 2025)
- GO2-92-135, Responds to NRC Re Violations Noted in Insp Rept 50-397/92-01.Corrective Actions:Degraded Voltage Calculation 2.12.58 Will Be Completed + (10:26:52, 8 January 2025)
- GO2-92-129, Special Rept:On 920420,seismic Triaxial Peak Accelerograph & Space Frame Removed to Allow Refueling of Reactor Core. Accelerometer Will Be Returned to Svc When Space Frame Reattached to Reactor Vessel Prior to Startup + (10:26:53, 8 January 2025)
- IR 05000397/1992015 + (10:26:56, 8 January 2025)
- ML17289A597 + (10:26:57, 8 January 2025)
- 05000397/LER-1992-018, :on 920428,determined That Six Locations Not Provided W/Emergency Lighting Capacity & Operator Actions Required for Fire Outside Main CR Not in Procedures.Caused by Inadequate Design.Lighting Provided + (10:26:59, 8 January 2025)
- ML17289A592 + (10:27:01, 8 January 2025)
- TAC:M79712 + (10:27:01, 8 January 2025)
- ML17289A590 + (10:27:02, 8 January 2025)
- ML17289A589 + (10:27:02, 8 January 2025)
- ML17289A586 + (10:27:03, 8 January 2025)
- ML17289A585 + (10:27:04, 8 January 2025)
- ML17289A584 + (10:27:05, 8 January 2025)
- GO2-92-126, Informs NRC That Form NRC-474 Certifying Existing WNP-2 Simulator Will Be Submitted Prior to 920630.Contractor Fabricating New Simulator Experiencing Delays.Util Prefers Recertification of Existing Simulator Over Addl Exemption + (10:27:06, 8 January 2025)
- ML17289A582 + (10:27:06, 8 January 2025)
- ML17289A580 + (10:27:08, 8 January 2025)
- ML17289A578 + (10:27:09, 8 January 2025)
- GO2-92-125, Responds to Telcon W/Wm Dean Re 901231,911015 & 920410 Applications for Amend to License NPF-21 Re Scram Discharge Vol Setpoints,Rcic Actuation Instrumentation & Surveillance Requirements & Generic Ltr 88-01,respectively + (10:27:10, 8 January 2025)
- ML17289A577 + (10:27:10, 8 January 2025)
- ML17289A574 + (10:27:12, 8 January 2025)
- ML17289A571 + (10:27:13, 8 January 2025)
- ML17289A569 + (10:27:15, 8 January 2025)
- 05000397/LER-1992-016, :on 920424,determined That RCIC Sys Not Adequately Transferred to Remote Shutdown Panel.Caused by Misapplication of Design Inputs.Power Supply for RCIC Control Sys (48-volt Dc) Will Be Modified + (10:27:16, 8 January 2025)
- 05000397/LER-1991-003, :on 910201,review of Sp for Testing Downstream Standby Gas Treatment HEPA Filters Indicated That Methods Used Not in Compliance W/Tss Due to Inadequate air-aerosol Mixing.Appropriate Procedures Modified + (10:27:17, 8 January 2025)
- GO2-92-117, Informs of Completion of Harsh Environ Setpoint Calculations for Equipment Setpoint Methodology Program Plan,Per Mar 1992 Commitment.Implementation of Equipment Setpoint Changes in Process + (10:27:18, 8 January 2025)
- TAC:M55579 + (10:27:18, 8 January 2025)
- ML17289A565 + (10:27:20, 8 January 2025)
- ML17289A564 + (10:27:23, 8 January 2025)
- ML17289A563 + (10:27:24, 8 January 2025)
- TAC:M83279 + (10:27:25, 8 January 2025)
- ML17289A561 + (10:27:25, 8 January 2025)
- ML17289A560 + (10:27:26, 8 January 2025)
- ML17289A559 + (10:27:27, 8 January 2025)
- GO2-92-115, Monthly Operating Rept for Apr 1992 for WNP-2 + (10:27:28, 8 January 2025)
- GO2-92-119, Forwards Supplemental Ltr Re Unsatisfactory HHS-certified Lab Performance.Services of Laboratory of Pathology Not Used Until Inconsistencies Resolved.New Lab Is Compuchem Laboratories + (10:27:29, 8 January 2025)
- GO2-92-120, Responds to NRC Re Violations Noted in Insp Rept 50-397/92-03 on 920124-0308.Corrective Actions:Test Procedure PPM 8.3.230TP Revised to Require Drywell to Drywell Test Flow Path to Satisfy TS Requirements + (10:27:31, 8 January 2025)
- 05000397/LER-1992-013, :on 920318,annunciator for RHR B/C VLV Open Permissive Found Lit & RHR Pressure Switch Found Isolated During Startup.Cause Not Determined.Pressure Switch Returned to Svc & Annunicator & Permissive Cleared + (10:27:33, 8 January 2025)
- 05000397/LER-1992-012, :on 920318,determined That Removal of Access Plugs Over RHR Pump Rooms a & B Exposed Both Rooms to Potential Flooding from Common Source.Caused by Faulty Mgt Methods.Interim Guidance Provided + (10:27:35, 8 January 2025)
- GO2-92-123, Submits Rept on Flaw in Reactor Recirculation Piping,Per Generic Ltr 88-01.Indication in ISI Weld 20RRC(6)-8 Reexamined on 920421 to Determine Any Size Change.Results Listed on Encl Submitted for Approval for Restart on 920629 + (10:27:35, 8 January 2025)
- ML17289A543 + (10:27:37, 8 January 2025)
- ML17289A542 + (10:27:38, 8 January 2025)
- ML17289A540 + (10:27:39, 8 January 2025)
- 05000397/LER-1992-015, :on 920413,unexplained Pressure Drop in ADS B Section of Containment Instrument Air Sys Header Occurred. Caused by Inadequate Written Procedures.Valve CIA-V-41B Inspected & PPM-8.9.130 Replaced + (10:27:40, 8 January 2025)
- ML17289A535 + (10:27:41, 8 January 2025)
- ML17289A536 + (10:27:41, 8 January 2025)
- GO2-92-118, Forwards App B, 8X8 Extended Burnup, of EMF-92-040 for Review & Approval of Mechanical Design Analysis to Extend Assembly Exposure Limits from 35 Gwd/Mtu to 37 Gwd/Mtu + (10:27:42, 8 January 2025)
- ML17289A532 + (10:27:44, 8 January 2025)
- GO2-92-109, Radiological Environ Monitoring Program 1991 Annual Rept for Nuclear Plant 2 + (10:27:45, 8 January 2025)