Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20204C361 + (01:32:10, 8 December 2024)
- ML20204C360 + (01:32:11, 8 December 2024)
- 05000482/LER-1987-011, :on 870218 & 0317,analysis of Operating Data of Cycles I & II Determined That Reactor Core Thermal Power Exceeded 3,411 MW by Less than 1.0%.Caused by Personnel Error.Transmitters Recalibr + (01:32:13, 8 December 2024)
- ML20204C343 + (01:32:14, 8 December 2024)
- ML20204C339 + (01:32:15, 8 December 2024)
- ML20204C334 + (01:32:16, 8 December 2024)
- ML20204C329 + (01:32:16, 8 December 2024)
- 05000410/LER-1986-007, :on 861120,ESF Actuation Occurred.Caused by Two Electrical Protection Assemblies (Epas) Tripping Twice in 2 H Causing Loss of Power to Circuit Bus Due to Personnel Error During MSIV Testing.Epas Reset + (01:32:18, 8 December 2024)
- ML20204C325 + (01:32:19, 8 December 2024)
- ML20204C318 + (01:32:21, 8 December 2024)
- ML20204C320 + (01:32:21, 8 December 2024)
- ML20204C316 + (01:32:22, 8 December 2024)
- ML20204C315 + (01:32:22, 8 December 2024)
- ML20204C313 + (01:32:23, 8 December 2024)
- ML20204C311 + (01:32:24, 8 December 2024)
- ML20204C312 + (01:32:24, 8 December 2024)
- ML20204C308 + (01:32:25, 8 December 2024)
- ML20204C307 + (01:32:26, 8 December 2024)
- ML20204C298 + (01:32:27, 8 December 2024)
- ML20204C305 + (01:32:27, 8 December 2024)
- ML20204C296 + (01:32:28, 8 December 2024)
- ML20204C288 + (01:32:29, 8 December 2024)
- ML20204C281 + (01:32:35, 8 December 2024)
- ML20204C274 + (01:32:36, 8 December 2024)
- ML20204C276 + (01:32:36, 8 December 2024)
- ML20204C272 + (01:32:37, 8 December 2024)
- ML20204C265 + (01:32:38, 8 December 2024)
- ML20204C271 + (01:32:38, 8 December 2024)
- TXX-6353, Documents Agreement W/Ca Reed During 870306 Telcon Re FOIA 86-A-12(85-59).Name,title & Other Specific Info Re Individual Taking Test Will Be Withheld from Public Disclosure + (01:32:39, 8 December 2024)
- ML20204C261 + (01:32:40, 8 December 2024)
- 05000344/LER-1987-004, :on 870219,reactor Trip Bypass Breaker B Opened During Termination of Periodic Instrument & Control Test 10-1 Due to Sulfer Smell.Caused by Incorrect Termination of Test.Trip Signal Blocks Reinstated + (01:32:42, 8 December 2024)
- ML20204C255 + (01:32:43, 8 December 2024)
- ML20204C252 + (01:32:43, 8 December 2024)
- ML20204C243 + (01:32:44, 8 December 2024)
- ML20204C240 + (01:32:45, 8 December 2024)
- ML20204C235 + (01:32:46, 8 December 2024)
- ML20204C237 + (01:32:46, 8 December 2024)
- ML20204C234 + (01:32:47, 8 December 2024)
- ML20204C228 + (01:32:48, 8 December 2024)
- ML20204C230 + (01:32:48, 8 December 2024)
- ML20204C223 + (01:32:49, 8 December 2024)
- ML20204C222 + (01:32:50, 8 December 2024)
- B12467, Forwards Revised Response to NRC Human Factors Engineering Items on Three Loop Operation of Plant as Suppl to 870220 Submittal,Per Request + (01:32:51, 8 December 2024)
- ML20204C214 + (01:32:51, 8 December 2024)
- ML20204C212 + (01:32:52, 8 December 2024)
- ML20204C211 + (01:32:53, 8 December 2024)
- 05000328/LER-1987-004-01, :on 870220,cable in Electrical Penetration 36 Found W/O Redundant Overcurrent Protection.Caused by Personnel Error.Circuit Breaker/Fuse Combination Corrected. Work Request Submitted on 861014 + (01:32:58, 8 December 2024)
- ML20204C207 + (01:32:59, 8 December 2024)
- ML20204C205 + (01:32:59, 8 December 2024)
- ML20204C203 + (01:33:00, 8 December 2024)
- ML20204C200 + (01:33:01, 8 December 2024)
- ML20204C198 + (01:33:01, 8 December 2024)