Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17342A290 + (17:12:25, 7 January 2025)
- L-85-407, Application for Amends to Licenses DPR-31 & DPR-41,revising Tech Specs Re Testing Requirements for safety-related Snubbers to Define Snubber Type & Deleting Test Acceptance Criteria Re 50% Drag Force Increase.Fee Paid + (17:12:26, 7 January 2025)
- ML17342A288 + (17:12:26, 7 January 2025)
- ML17342A285 + (17:12:32, 7 January 2025)
- TAC:53053 + (17:12:32, 7 January 2025)
- ML17342A283 + (17:12:35, 7 January 2025)
- ML17342A281 + (17:12:37, 7 January 2025)
- IR 05000820/2010015 + (17:12:38, 7 January 2025)
- L-85-409, Withdraws 850201 Request for NRC Review of Reanalysis of Spent Fuel Rack Modules W/Only Overhanging Rows Loaded W/ Fuel,Based on DG Mcdonald + (17:12:40, 7 January 2025)
- ML17342A278 + (17:12:40, 7 January 2025)
- L-85-425, Forwards Application Fee for NRC Review of Re Implementation of Alternate Safe Shutdown Capability + (17:12:42, 7 January 2025)
- ML17342A274 + (17:12:44, 7 January 2025)
- IR 05000250/1985031 + (17:12:47, 7 January 2025)
- L-85-390, Forwards IAEA, Design Info Questionnaire, in Response to NRC Re Safeguards Program.Questionnaire Withheld + (17:12:48, 7 January 2025)
- ML17342A271 + (17:12:48, 7 January 2025)
- L-85-418, Reaffirms Commitment to Submit Appropriate Tech Specs Re Availability & Performance Monitoring of Standby Steam Generator Feedwater Pumps & Provides General Info Concerning Status of Sys.Two Pumps Installed + (17:12:50, 7 January 2025)
- ML17342A265 + (17:12:52, 7 January 2025)
- L-85-350, Forwards Revised Pages to Inservice Test Program for Pumps & Valves,In Response to NRC 850520 Request for Rev.Revs Reflect Test Requirements for MOV-750 & MOV-751 + (17:12:53, 7 January 2025)
- ML17342A263 + (17:12:55, 7 January 2025)
- ML17342A262 + (17:12:56, 7 January 2025)
- IR 05000250/1985028 + (17:12:58, 7 January 2025)
- ML17342A257 + (17:12:59, 7 January 2025)
- ML17342A256 + (17:13:00, 7 January 2025)
- ML17342A254 + (17:13:01, 7 January 2025)
- L-85-382, Responds to Violations Noted in Insp Repts 50-250/85-26 & 50-251/85-26.Corrective Actions:Revs to Administrative Procedure 0190.19 Will Be Discussed W/Foremen & Supervisors to Ensure Awareness of Work Order Guidelines + (17:13:02, 7 January 2025)
- L-85-398, Forwards Addl Info Re Category C-2 Steam Generator Tube Insps,Completing Response to Generic Ltr 85-02.Addl Tubes Will Be Inspected on case-by-case Basis + (17:13:07, 7 January 2025)
- IR 05000250/1985029 + (17:13:09, 7 January 2025)
- ML17342A236 + (17:13:11, 7 January 2025)
- ML17342A237 + (17:13:11, 7 January 2025)
- L-85-389, Forwards 1985 Inservice Insp Summary Rept for Turkey Point Nuclear Power Plant Unit 3, Per ASME Code.Owner Data Rept of Repairs or Replacement & Data Rept for Eddy Current Exam Results Included + (17:13:12, 7 January 2025)
- L-85-346, Withdraws Part of 840402 Application for Amends to Licenses DPR-31 & DPR-41,dealing W/Operability/Surveillance Requirements Referencing Inservice Test Programs.Revised Pages Encl + (17:13:14, 7 January 2025)
- L-85-393, Advises of Need to Evaluate NRC SER Impact Re Westinghouse Owners Group ATWS Mitigating Sys Actuation Circuitry Generic Design Program to Determine Best Logic.Implementation Schedule Will Be Submitted 90 Days After SER Issuance + (17:13:16, 7 January 2025)
- L-85-381, Advises That Response to Generic Ltr 85-12 Re Implementation of TMI Action Item II.K.3.5, Automatic Trip of Reactor Coolant Pumps & Safety Evaluation Will Be Provided by 851220 + (17:13:18, 7 January 2025)
- ML17342A218 + (17:13:20, 7 January 2025)
- L-85-364, Forwards Addl Response to Generic Ltr 83-28,Item 1.2 Re post-trip Review,Data & Info Capability,Per 850815 Telcon & NRC 850719 Draft Technical Evaluation Rept.Reliability of Digital Data Processing Sys Also Discussed + (17:13:21, 7 January 2025)
- ML17342A211 + (17:13:23, 7 January 2025)
- L-85-368, Forwards Reactor Containment Bldg Integrated Leak Rate Test,Types A,B & C Periodic Test, Per 10CFR50 App J + (17:13:24, 7 January 2025)
- L-85-361, Forwards Revised Rev 8 to Fpltqar 1-76A, Topical QA Rept + (17:13:26, 7 January 2025)
- ML17342A206 + (17:13:26, 7 January 2025)
- L-85-353, Responds to Violations Noted in Insp Repts 50-250/85-22 & 50-251/85-22.Corrective Actions:Administrative Procedures & Electrical Dept Guidelines Revised to Provide Detailed Instructions & Increased Use of Supervisory Hold Points + (17:13:28, 7 January 2025)
- ML17342A201 + (17:13:30, 7 January 2025)
- L-85-363, Requests Deferral of 1-wk Maint & Surveillance Insps Until After Unit 4 Refueling Outage,Scheduled to Begin in Jan 1986.Deferral Necessary Due to Other Insps Scheduled & Impact Insps May Have on Key Plant Personnel + (17:13:31, 7 January 2025)
- L-85-338, Semiannual Radioactive Effluent Release Rept,Jan-June 1985 + (17:13:33, 7 January 2025)
- IR 05000515/2006005 + (17:13:35, 7 January 2025)
- ML17342A194 + (17:13:37, 7 January 2025)
- ML17342A192 + (17:13:41, 7 January 2025)
- IR 05000708/2008019 + (17:13:43, 7 January 2025)
- ML17342A189 + (17:13:44, 7 January 2025)
- L-85-342, Responds to Violations Noted in Insp Repts 50-250/85-24 & 50-251/85-24.Corrective Actions:Operating Procedures 0205.1 & 0205.2 Revised & Rod Drop Times for Shutdown Bank a Recalculated + (17:13:45, 7 January 2025)
- L-85-327, Responds to Violations Noted in Insp Repts 50-250/85-13 & 50-251/85-13.Corrective Actions:Requirement Will Be Added to Maint Procedure (MP)1407.7 for Reactor Vessel Stud Detensioning & Removal + (17:13:47, 7 January 2025)
- TAC:56177 + (17:13:49, 7 January 2025)