Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18022A990 + (09:46:02, 7 January 2025)
- 05000400/LER-1996-012, :on 960724,SIII Inverter Was Taken OOS for Repair.Caused by Faulty ferro-resonant Transformer within Inverters Internal Circuitry.Repairs & Load Testing for Siii Were Completed + (09:46:05, 7 January 2025)
- HNP-95-091, Forwards Application for Renewal of NPDES Permit NC0039586, Submitted to Nc Div of Environ Mgt on 951003 + (09:46:06, 7 January 2025)
- HNP-95-086, Special Rept,Identifying Number of SG Tubes Plugged as Result of Recent SG Tube ISI Conducted During Refueling Outage 6 + (09:46:08, 7 January 2025)
- TAC:M91722 + (09:46:16, 7 January 2025)
- ML18022A974 + (09:46:17, 7 January 2025)
- IR 05000400/1995013 + (09:46:22, 7 January 2025)
- ML18022A971 + (09:46:23, 7 January 2025)
- HNP-95-087, Part 21 Rept Re Failure of Charging SI Pump Miniflow Check Valves.Caused by Cocking of Piston Towards Valve Outlet Port Due to Large Hydraulic Surge.Valves That Experienced Failures Replaced + (09:46:24, 7 January 2025)
- 05000400/LER-1995-008-01, :on 950902,charging/SI Pump B (Csip) Returned to Svc Prior to Required Acceptance Testing.Caused by Personnel Error.Csip a Placed in Svc on 950902 & Csip B Declared Inoperable + (09:46:27, 7 January 2025)
- 05000400/LER-1995-007-01, :on 950901,inadvertent Start of Turbine Driven AFW Pump/Unplanned ESF Actuation Occurred Due to Inadequate Test Procedures.Revised Appropriate Procedures + (09:46:28, 7 January 2025)
- HNP-95-084, Forwards Rev 25 to Vol 1 to Shearon Harris Nuclear Power Plant Emergency Plan, Replacing Pages of Previous Rev W/ Exception of Emergency Action Level Flow Paths,Remaining Same as Previous Rev.W/One Oversize Drawing + (09:46:30, 7 January 2025)
- HNP-95-075, Provides Update on Review Process & Approach to Resolving Concerns W/Mechanical Properties of Thermo-Lag Fire Barriers,In Response to GL 92-08 + (09:46:31, 7 January 2025)
- 05000400/LER-1995-005-02, :on 950731,TS Violation Occurred Due to Missed Compensatory Vent Stack Flow Rate Estimate.Counseled Individual Involved & Training for Appropriate Operations Personnel Will Be Performed + (09:46:34, 7 January 2025)
- ML18022A962 + (09:46:35, 7 January 2025)
- ML18022A960 + (09:46:36, 7 January 2025)
- ML18022A958 + (09:46:37, 7 January 2025)
- ML18022A957 + (09:46:41, 7 January 2025)
- HNP-95-097, Forwards Vols 1 & 2 of Special Rept - SG Tube ISI Results RFO 5. Rept Provides Results of SG Tube ISIs Performed in Apr 1994 + (09:46:42, 7 January 2025)
- ML18022A954 + (09:46:42, 7 January 2025)
- IR 05000207/2002017 + (09:46:45, 7 January 2025)
- HNP-95-016, Proposed Tech Specs 3.1.1.2 Re Relocating Shutdown Margin Vs Boron Concentration Curve to COLR + (09:46:47, 7 January 2025)
- ML18022A950 + (09:46:47, 7 January 2025)
- ML18022A947 + (09:46:49, 7 January 2025)
- HNP-95-019, Forwards Request for Enforcement Discretion from TS 3.3.1, Table 3.3-1, RTS Instrumentation & 3.3.2,Table 3.3-3, ESFAS Instrumentation, Permitting Continued Operation W/ Ssps Inoperable for Longer than Allowed by TS 3.3.2 + (09:46:50, 7 January 2025)
- ML18022A945 + (09:46:52, 7 January 2025)
- ML18022A941 + (09:46:53, 7 January 2025)
- CAC:MF9757 + (09:46:53, 7 January 2025)
- HNP-94-071, Transmits Rev 23 to Emergency Plan PLP-201 & Rev 4 to EPIP- PEP-001,rev 8 to EPIP PEP-101,rev 12 Change 4 to EPIP PEP-102,rev 10 to EPIP PEP-103, Rev 6 to EPIP PEP-104,rev 6 to EPIP PEP-201 & Rev 5 to EPIP PEP-202 + (09:46:54, 7 January 2025)
- HNP-94-065, Forwards ISI Summary 1st Interval,2nd Period,5th Refueling Outage 1-2-05 Completed 940803, in Accordance W/Asme Boiler & PV Code,Section Xi,Article IWA-6220(b) + (09:46:56, 7 January 2025)
- IR 05000400/1994012 + (09:47:02, 7 January 2025)
- ML18022A930 + (09:47:03, 7 January 2025)
- ML18022A928 + (09:47:04, 7 January 2025)
- HNP-94-032, Forwards Vols 1,2 & 3 of Radiological Environ Operating Rept 1993 + (09:47:05, 7 January 2025)
- ML18022A924 + (09:47:09, 7 January 2025)
- HNP-93-851, Forwards Rev 21 to PLP-201, Emergency Plan & Revised EPIPs Including Change 1,Rev 11 to PEP-102,Rev 8 to PEP-103,Change 1,Rev 4 to PEP-104,Rev 9 to PEP-204,Rev 5 to PEP-206,Rev 3 to PEP-216 & Change 1,Rev 7 to PEP-217.W/3 Oversize Figs + (09:47:15, 7 January 2025)
- HNP-93-828, Suppls 930226 Application for Amend to License NPF-63 Re RCS pressure-temp Limits + (09:47:19, 7 January 2025)
- ML18022A918 + (09:47:19, 7 January 2025)
- RAIO-0118-58286, LLC Response to NRC Request for Additional Information No. 316 (Erai No. 9222) on the NuScale Design Certification Application + (09:47:21, 7 January 2025)
- ML18022A914 + (09:47:23, 7 January 2025)
- HNP-93-819, Submits Proposed Alternative to Shearon Plant Commitment to Perform Biennial Reviews of Plant Procedures Per ANSI Standard N18.7-1976 Re Change in QA Program + (09:47:24, 7 January 2025)
- TAC:M84620 + (09:47:26, 7 January 2025)
- ML18022A909 + (09:47:29, 7 January 2025)
- ML18022A907 + (09:47:30, 7 January 2025)
- ML18022A906 + (09:47:31, 7 January 2025)
- ML18022A905 + (09:47:32, 7 January 2025)
- ML18022A903 + (09:47:34, 7 January 2025)
- ML18022A904 + (09:47:34, 7 January 2025)
- ML18022A901 + (09:47:35, 7 January 2025)
- ML18022A900 + (09:47:36, 7 January 2025)
- ML18022A897 + (09:47:37, 7 January 2025)