Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18022B050 + (09:45:03, 7 January 2025)
- HNP-98-072, Forwards Corrected License Amend 77 TS Pages 3/4 7-11 & B 3/4 0-2,inadvertently Not Included or Not Issued as Part of Subject License Amend + (09:45:06, 7 January 2025)
- ML18022B045 + (09:45:10, 7 January 2025)
- ML18022B043 + (09:45:14, 7 January 2025)
- HNP-98-073, Special Rept:On 970719,declared Channel 751 of Digital Metal Impact Monitoring Sys Monitors Inoperable.Caused by Noise Originating in Channel 751 pre-amplifier/accelerometer Sensor Located in Containment.Channel 751 in Containment + (09:45:15, 7 January 2025)
- ML18022B041 + (09:45:18, 7 January 2025)
- TAC:M83627 + (09:45:18, 7 January 2025)
- HNP-98-017, Responds to RAI on Shearon Harris IPEEE Submittal,Dtd 971215.Rev 0 to C-007, CP&L Harris IPEEE: HCLPF Capacity Calculations for 1X-SAB CST Tank & 1X-SN RWST Tank, Encl + (09:45:20, 7 January 2025)
- ML18022B035 + (09:45:21, 7 January 2025)
- HNP-97-184, Forwards Rev 31 to PLP-201, Emergency Plan, IAW 10CFR50, App E.Changes Incorporated by Rev Includes Five Listed Categories + (09:45:22, 7 January 2025)
- HNP-97-168, Forwards Revised Epips,Including Rev 2 to PEP-260,rev 6 to PEP-250,rev 3 to PEP-110,rev 1 to PEP-230,rev 2 to PEP-240, Rev 3 to PEP-270,rev 2 to PEP-330,rev 3 to PEP-350 & Rev 8 to PEP-500 + (09:45:24, 7 January 2025)
- ML18022B025 + (09:45:26, 7 January 2025)
- HNP-97-169, Forwards ISI Rept Which Covers Insps Performed During Cycle 7 Operation,Including Refueling Outage 7,in First 10-year Insp Interval + (09:45:27, 7 January 2025)
- ML18022B022 + (09:45:30, 7 January 2025)
- 05000400/LER-1996-001, Ack That Corrective Actions as Implemented W/Regard to Item Deviates from Ones Which Were Described in NOV Response & Stated in LER 96-001-00 + (09:45:31, 7 January 2025)
- IR 05000400/1997004 + (09:45:33, 7 January 2025)
- 05000400/LER-1997-014, :on 970514,SI Occurred During Ssps Surveillance Testing.Caused by Inattention to Detail During Recent Rev to Surveillance Test Procedure Being Used.Revised Deficient Surveillance Procedures + (09:45:35, 7 January 2025)
- HNP-97-092, Requests That Approval of Proposed Changes Be Issued Prior to 970430 to Support Installation & Testing of Proposed Mod Prior to Restart from Upcoming Refueling Outage Re EDG Protection During Testing Re 961114 Discovery of Deficiency + (09:45:37, 7 January 2025)
- HNP-97-091, Submits Completion of Spent Fuel Survey Commitments.Changes Will Be Incorporated in FSAR Amend 48 Scheduled for Issuance No Later than Six Months Following RFO7 Completion + (09:45:38, 7 January 2025)
- 05000400/LER-1997-006, :on 970318,breach Was Identified in Thermo-Lag Fire Barrier Wall Due to Inadequate Initial Design,Poor Construction Methods & Incomplete as-built Design.Visual Insp of Thermo-Lag Barrier Walls Performed + (09:45:44, 7 January 2025)
- HNP-97-084, Annual Radioactive Effluent Release Rept 960101-1231 + (09:45:45, 7 January 2025)
- NL-17-2015, Response to NRC RAIs Regarding Decommissioning Funding Status Reports + (09:45:47, 7 January 2025)
- HNP-97-065, Transmits Rev 30 to Shearon Harris Nuclear Power Plant Emergency Plan (PLP-201).Changes Include Evacuation Time Estimate Update,Positions of Responsibility,Changes to General Info & Correction of Clerical Errors + (09:45:48, 7 January 2025)
- HNP-97-036, Application for Amend to License NPF-63,revising TS 3.5.1 to Provide Optional Method of Meeting Surveillance Requirement & to Add New Action Statement Re Boron Concentration + (09:45:50, 7 January 2025)
- ML18022B007 + (09:45:50, 7 January 2025)
- ML18022B004 + (09:45:52, 7 January 2025)
- HNP-97-059, Application for Amend to License NPF-63,increasing AOT for Refueling Water Storage Tank to Twelve Hs While Performing TS Surveillance 4.4.6.2.2 + (09:45:53, 7 January 2025)
- HNP-97-043, Application for Amend to License NPF-63,amending TS 3/4.4.5, Sgs, & Associated Bases,To Add Sleeve Installation as Alternative to Tube Plugging for Repairing Degraded ST Tubes.Trs encl.CEN-630-P,rev 1 Withheld + (09:45:55, 7 January 2025)
- HNP-97-027, Supplements Utils Re Violations Noted in Insp Rept 50-400/96-10.Corrective Actions: a ESW Pump Will Be Replaced During Refueling Outage 7 & Procedure AP-107, TS Interpretations, Has Been Revised to Clarify Purpose + (09:45:56, 7 January 2025)
- ML18022A995 + (09:45:59, 7 January 2025)
- HNP-96-141, Forwards Special Rept Which Provides Results of SG Tube ISI Performed in Sept 1995 During Plant Refueling Outage 6 + (09:46:00, 7 January 2025)
- HNP-96-138, Forwards One Copy of Rev 28 to Shnpp Emergency Plan (PLP- 201) Which Replaces All Pages of Previous Revs + (09:46:02, 7 January 2025)
- ML18022A990 + (09:46:02, 7 January 2025)
- 05000400/LER-1996-012, :on 960724,SIII Inverter Was Taken OOS for Repair.Caused by Faulty ferro-resonant Transformer within Inverters Internal Circuitry.Repairs & Load Testing for Siii Were Completed + (09:46:05, 7 January 2025)
- HNP-95-091, Forwards Application for Renewal of NPDES Permit NC0039586, Submitted to Nc Div of Environ Mgt on 951003 + (09:46:06, 7 January 2025)
- HNP-95-086, Special Rept,Identifying Number of SG Tubes Plugged as Result of Recent SG Tube ISI Conducted During Refueling Outage 6 + (09:46:08, 7 January 2025)
- TAC:M91722 + (09:46:16, 7 January 2025)
- ML18022A974 + (09:46:17, 7 January 2025)
- IR 05000400/1995013 + (09:46:22, 7 January 2025)
- ML18022A971 + (09:46:23, 7 January 2025)
- HNP-95-087, Part 21 Rept Re Failure of Charging SI Pump Miniflow Check Valves.Caused by Cocking of Piston Towards Valve Outlet Port Due to Large Hydraulic Surge.Valves That Experienced Failures Replaced + (09:46:24, 7 January 2025)
- 05000400/LER-1995-008-01, :on 950902,charging/SI Pump B (Csip) Returned to Svc Prior to Required Acceptance Testing.Caused by Personnel Error.Csip a Placed in Svc on 950902 & Csip B Declared Inoperable + (09:46:27, 7 January 2025)
- 05000400/LER-1995-007-01, :on 950901,inadvertent Start of Turbine Driven AFW Pump/Unplanned ESF Actuation Occurred Due to Inadequate Test Procedures.Revised Appropriate Procedures + (09:46:28, 7 January 2025)
- HNP-95-084, Forwards Rev 25 to Vol 1 to Shearon Harris Nuclear Power Plant Emergency Plan, Replacing Pages of Previous Rev W/ Exception of Emergency Action Level Flow Paths,Remaining Same as Previous Rev.W/One Oversize Drawing + (09:46:30, 7 January 2025)
- HNP-95-075, Provides Update on Review Process & Approach to Resolving Concerns W/Mechanical Properties of Thermo-Lag Fire Barriers,In Response to GL 92-08 + (09:46:31, 7 January 2025)
- 05000400/LER-1995-005-02, :on 950731,TS Violation Occurred Due to Missed Compensatory Vent Stack Flow Rate Estimate.Counseled Individual Involved & Training for Appropriate Operations Personnel Will Be Performed + (09:46:34, 7 January 2025)
- ML18022A962 + (09:46:35, 7 January 2025)
- ML18022A960 + (09:46:36, 7 January 2025)
- ML18022A958 + (09:46:37, 7 January 2025)
- ML18022A957 + (09:46:41, 7 January 2025)
- HNP-95-097, Forwards Vols 1 & 2 of Special Rept - SG Tube ISI Results RFO 5. Rept Provides Results of SG Tube ISIs Performed in Apr 1994 + (09:46:42, 7 January 2025)