Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18078A244 + (11:25:40, 6 January 2025)
- ML18078A242 + (11:25:40, 6 January 2025)
- ML18078A241 + (11:25:41, 6 January 2025)
- ML18078A237 + (11:25:42, 6 January 2025)
- 05000272/LER-1978-064-03, /03L-0 on 780912:reactor Trip Setpoint Greater than T/S Limit During Check of Pressure Protec Channel 2. Caused by Unstable Output from Comparator Feeding Trip Bistable.Comparator Replaced + (11:25:43, 6 January 2025)
- 05000272/LER-1978-064, Forwards LER 78-064/03L-0 + (11:25:45, 6 January 2025)
- 05000272/LER-1978-062-03, /03L-0 on 780913:during Normal Oper the 12 Reactor Coolant Flow Channel 2 Was Not Indicating Due to Failure of a Hagan Controls Signal Isolator + (11:25:50, 6 January 2025)
- 05000272/LER-1978-062, Forwards LER 78-062/03L + (11:25:54, 6 January 2025)
- ML18078A216 + (11:25:55, 6 January 2025)
- ML18078A217 + (11:25:55, 6 January 2025)
- ML18078A215 + (11:25:56, 6 January 2025)
- ML18078A214 + (11:25:56, 6 January 2025)
- ML18078A212 + (11:25:57, 6 January 2025)
- ML18078A213 + (11:25:57, 6 January 2025)
- ML18078A211 + (11:25:58, 6 January 2025)
- ML18078A210 + (11:25:59, 6 January 2025)
- ML18078A209 + (11:25:59, 6 January 2025)
- ML18078A208 + (11:26:00, 6 January 2025)
- ML18078A207 + (11:26:00, 6 January 2025)
- ML18078A205 + (11:26:01, 6 January 2025)
- ML18078A206 + (11:26:01, 6 January 2025)
- ML18078A203 + (11:26:05, 6 January 2025)
- ML18078A204 + (11:26:05, 6 January 2025)
- ML18078A191 + (11:26:06, 6 January 2025)
- RS-18-030, Relief Requests Associated with the Fourth Inservice Inspection Interval + (11:26:07, 6 January 2025)
- ML18078A180 + (11:26:08, 6 January 2025)
- ML18078A174 + (11:26:09, 6 January 2025)
- ML18078A168 + (11:26:09, 6 January 2025)
- ML18078A165 + (11:26:10, 6 January 2025)
- ML18078A148 + (11:26:11, 6 January 2025)
- ML18078A142 + (11:26:12, 6 January 2025)
- ML18078A143 + (11:26:12, 6 January 2025)
- ML18078A138 + (11:26:13, 6 January 2025)
- RS-18-031, Update to Dresden Nuclear Power Station Unit 1 Post-Shutdown Decommissioning Activities Report + (11:26:13, 6 January 2025)
- ML18078A124 + (11:26:14, 6 January 2025)
- ML18078A109 + (11:26:15, 6 January 2025)
- ML18078A110 + (11:26:15, 6 January 2025)
- ML18078A099 + (11:26:16, 6 January 2025)
- ML18078A098 + (11:26:16, 6 January 2025)
- ML18078A096 + (11:26:17, 6 January 2025)
- ML18078A087 + (11:26:18, 6 January 2025)
- 05000395/LER-2018-001, Valid Actuation of Emergency Diesel Generator + (11:26:19, 6 January 2025)
- ML18078A061 + (11:26:20, 6 January 2025)
- L-18-017, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado + (11:26:21, 6 January 2025)
- ND-18-0289, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.6.03.02.1 (Index Number 597) + (11:26:24, 6 January 2025)
- ND-18-0322, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.5.02.02.1 (Index Number 522) + (11:26:25, 6 January 2025)
- L-18-061, Units. 1 & 2, Davis-Besse, and Perry, Response to Request for Additional Information Regarding Exemption Request for a Physical Barrier Requirement + (11:26:26, 6 January 2025)
- L-2018-053, Replacement Pages to Enclosure 3, SLRA Section 4 + (11:26:27, 6 January 2025)
- ML18078A016 + (11:26:29, 6 January 2025)
- ML18078A008 + (11:26:30, 6 January 2025)
- ML18078A007 + (11:26:31, 6 January 2025)
- ML18078A004 + (11:26:31, 6 January 2025)