Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18078B167 + (11:14:39, 6 January 2025)
- 05000272/LER-1979-021-03, /03L-0 on 790302:overhead Annuciators in Control Room Alarmed,Indicating Power Range Nuclear Instrumentation Channel Failure.Caused by Failure of N41 Channel High Voltage Power Supply.Failed Power Supply Replaced + (11:14:40, 6 January 2025)
- 05000272/LER-1979-021, Forwards LER 79-021/03L-0 + (11:14:42, 6 January 2025)
- ML18078B162 + (11:14:43, 6 January 2025)
- ML18078B161 + (11:14:44, 6 January 2025)
- ML18078B159 + (11:14:44, 6 January 2025)
- ML18078B156 + (11:14:45, 6 January 2025)
- ML18078B155 + (11:14:46, 6 January 2025)
- ML18078B154 + (11:14:47, 6 January 2025)
- 0CAN031803, Notification of Confirmatory/Action Letter Focus Area Inspection Readiness + (11:14:48, 6 January 2025)
- ML18078B152 + (11:14:49, 6 January 2025)
- ML18078B151 + (11:14:50, 6 January 2025)
- ML18078B150 + (11:14:51, 6 January 2025)
- ML18078B148 + (11:14:52, 6 January 2025)
- ML18078B149 + (11:14:52, 6 January 2025)
- ML18078B147 + (11:14:53, 6 January 2025)
- ML18078B146 + (11:14:54, 6 January 2025)
- 05000272/LER-1978-063-03, /03X-1 on 780910:containment Fan Cooling Unit 13 Inoperable. Caused by Flow Control Transmitter Failure Due to Silt Buildup in Low Pressure Sensing Line.Transmitter Cleaned & Sensing Line Blown Out + (11:14:56, 6 January 2025)
- 05000272/LER-1978-063, Forwards LER 78-063/03X-1 + (11:14:58, 6 January 2025)
- 05000272/LER-1978-067-03, /03X-1 on 780929:during Normal Operation,Resident NRC Inspector Noted Missing Fire Barrier in Cable Penetration.Caused by Failure of Administrative Controls. Penetration Immediately Sealed + (11:15:00, 6 January 2025)
- 05000272/LER-1978-067, Forwards LER 78-067/03X-1 + (11:15:02, 6 January 2025)
- 05000272/LER-1978-029-01, /01X-1 on 780610:during Training Startups,Two Power Range Channels Found Inoperable.Caused by Personnel Error in Which Wrong Leads Were Disconnected from Reactivity Computer.Procedures Revised + (11:15:03, 6 January 2025)
- 05000272/LER-1978-029, Forwards LER 78-029/01X-1 + (11:15:05, 6 January 2025)
- 05000272/LER-1978-061-01, /01X-2 on 780907:noted Defect in Protection Sys Which Could Allow Airborne Activity to Be Released to Outside Atmosphere.Caused by Design Deficiency.Design Change Installed in Protection Sys + (11:15:07, 6 January 2025)
- 05000272/LER-1978-061, Forwards LER 78-061/01X-2 + (11:15:09, 6 January 2025)
- ML18078B130 + (11:15:11, 6 January 2025)
- ML18078B128 + (11:15:12, 6 January 2025)
- ML18078B123 + (11:15:15, 6 January 2025)
- ML18078B121 + (11:15:20, 6 January 2025)
- ML18078B120 + (11:15:24, 6 January 2025)
- ML18078B119 + (11:15:25, 6 January 2025)
- ML18078B116 + (11:15:26, 6 January 2025)
- ML18078B115 + (11:15:28, 6 January 2025)
- ML18078B113 + (11:15:29, 6 January 2025)
- 05000272/LER-1979-018-03, /03L-0 on 790223:auxiliary Feedwater Pump Breaker Cubicle Was Hot.Caused by Burned Out Closing Spring Charging Motor.Motor & Breaker Replaced + (11:15:31, 6 January 2025)
- 05000272/LER-1979-018, Forwards LER 79-018/03L-0 + (11:15:32, 6 January 2025)
- ML18078B107 + (11:15:33, 6 January 2025)
- IR 05000311/1979008 + (11:15:37, 6 January 2025)
- 05000390/LER-2018-002, Regarding Shield Building Inoperability Due to Annulus Vacuum Transient + (11:15:38, 6 January 2025)
- ML18078B103 + (11:15:40, 6 January 2025)
- 05000272/LER-1979-022-03, /03L-0 on 790221:during Normal Operations,While Conducting Routine Insp,Nrc Inspector Found Missed Tech Spec Surveillance Reading.Caused by Personnel Error.Surveillance Posted on Plant Status Board + (11:15:42, 6 January 2025)
- 05000272/LER-1979-022, Forwards LER 79-022/03L-0 + (11:15:43, 6 January 2025)
- ML18078B095 + (11:15:45, 6 January 2025)
- ML18078B097 + (11:15:45, 6 January 2025)
- ML18078B094 + (11:15:46, 6 January 2025)
- ML18078B092 + (11:15:48, 6 January 2025)
- 05000272/LER-1979-017-03, /03L-0 on 790219:gross Activity Surveillance of Coolant Sys & Steam Generators Was Not Performed.Caused by Personnel Error in Not Returning Gas Bottles to Storage.New Bottle Storage Pad Will Be Built + (11:15:49, 6 January 2025)
- 05000272/LER-1979-017, Forwards LER 79-017/03L-0 + (11:15:51, 6 January 2025)
- ML18078B082 + (11:15:52, 6 January 2025)
- ML18078B073 + (11:15:53, 6 January 2025)
- ML18078B064 + (11:15:54, 6 January 2025)