Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18283B530 + (17:23:43, 5 January 2025)
- ML18283B531 + (17:23:43, 5 January 2025)
- ML18283B529 + (17:23:44, 5 January 2025)
- ML18283B528 + (17:23:44, 5 January 2025)
- ML18283B523 + (17:23:45, 5 January 2025)
- ML18283B487 + (17:23:46, 5 January 2025)
- ML18283B521 + (17:23:46, 5 January 2025)
- ML18283B485 + (17:23:47, 5 January 2025)
- ML18283B486 + (17:23:47, 5 January 2025)
- 05000259/LER-2076-003-03, Eight Alarms Received from July 13 to 31, 1976 from Smoke Detectors in Spreading Room B Due to Sensitivity + (17:23:49, 5 January 2025)
- ML18283B478 + (17:23:50, 5 January 2025)
- 05000296/LER-2076-007-03, Abnormal Occurrence Report BFRO-50-296/767 Rupture Disk Located on the Steam Discharge Line That Ruptured During a Startup Test Run on the Unit 3 HPCI Turbine + (17:23:52, 5 January 2025)
- ML18283B474 + (17:23:53, 5 January 2025)
- ML18283B475 + (17:23:53, 5 January 2025)
- ML18283B473 + (17:23:54, 5 January 2025)
- ML18283B471 + (17:23:55, 5 January 2025)
- ML18283B470 + (17:23:58, 5 January 2025)
- ML18283B463 + (17:23:59, 5 January 2025)
- ML18283B469 + (17:23:59, 5 January 2025)
- ML18283B462 + (17:24:00, 5 January 2025)
- ML18283B461 + (17:24:01, 5 January 2025)
- ML18283B460 + (17:24:01, 5 January 2025)
- ML18283B459 + (17:24:02, 5 January 2025)
- ML18283B458 + (17:24:06, 5 January 2025)
- 05000259/LER-2076-012, Main Steamline D Flow Indicator FI-46-4 & Differential Pressure Indicating Switches Pdis-1-50 (A-D) Were Found Unresponsive to Steamflow During Startup Testing at 270 Mwe + (17:24:07, 5 January 2025)
- 05000259/LER-2076-015, HPCI Steamflow Indicators (Pdis 73-1A & -1B) Were Reading Low During Startup Testing + (17:24:09, 5 January 2025)
- 05000259/LER-2076-016, False Alarm Was Received from Smoke Detector in Spreading Room B Due to Increased Detector Sensitivity + (17:24:11, 5 January 2025)
- 05000259/LER-2076-019, Start Circuit 1 of D/G 3D Was Found Inoperable Because of Relay Failure in Speed Sensing Circuit During Performance of Scheduled Maintenance Test + (17:24:13, 5 January 2025)
- 05000259/LER-2076-018, Torus Oxygen Sensor Failed to Respond Properly to Calibration Gas While Performing Surveillance Test During Startup Testing + (17:24:15, 5 January 2025)
- 05000259/LER-2076-020, Drywell Temperature Recorder TR-64-52 Became Erratic During Startup Testing + (17:24:16, 5 January 2025)
- ML18283B449 + (17:24:17, 5 January 2025)
- ML18283B447 + (17:24:19, 5 January 2025)
- 05000259/LER-2077-001, Relief Valve on Pump Discharge Opened at Lower than Set Pressure During Performance of Surveillance Instruction 4.4.A.1 on Standby Liquid Control Pump 3A + (17:24:21, 5 January 2025)
- 05000259/LER-2077-002, HPCI Restraints R-24 & R-35 on Pump Discharge Line Were Discovered with Loose Bolts & Broken Cinch Anchors Upon Completion of Operation of HPCI System During Reactor Scram on 1/26/1977 + (17:24:23, 5 January 2025)
- 05000259/LER-2077-003, Reactor Low Water Level Scram Switch LIS-3-203D Failed to Operate During Routine Surveillance Testing + (17:24:26, 5 January 2025)
- 05000259/LER-2077-004, Cmflpd Exceeded Limit on 1/15 & 1/18/1977, & MAPRAT Exceeded Limit on 1/18 & 1/24/1977 + (17:24:28, 5 January 2025)
- 05000259/LER-2077-005, A & B RPS MG Sets Failed to Trip During Startup Test, ST1 31, Loss of T-G, and Off Site Power Test + (17:24:30, 5 January 2025)
- 05000259/LER-2077-006, Drywell High Pressure Switch PS-64-56A Exceeded Technical Specification Limit of 2.00 Psig by 0.04 Psi 6 During Normal Operation + (17:24:32, 5 January 2025)
- 05000259/LER-2077-007, Torus Oxygen Sensor O2M-76-42 Failed to Calibrate to 2-percent Oxygen Calibration Gas During Normal Operation + (17:24:34, 5 January 2025)
- 05000259/LER-2077-009, Smoke Detector in Reactor Building Gave a False Alarm for Fire Protection Zone Due to Increased Detector Sensitivity During Normal Operation + (17:24:35, 5 January 2025)
- 05000296/LER-2077-008, For Browns Ferry Nuclear Plant, Unit 3, Relief Valve on Discharge of Standby Liquid Control Pump 3A Was Observed to Open at 1300 Psig Instead of Designed Setting of 1400 Psig & Stuck in Partially Open Position During Performanc + (17:24:37, 5 January 2025)
- 05000296/LER-2077-007, For Browns Ferry Nuclear Plant, Unit 3, Torus Oxygen Sensor O2M-76-42 Failed to Calibrate to 2-Percent Oxygen Calibration Gas During Normal Operation + (17:24:39, 5 January 2025)
- 05000296/LER-2077-010, For Browns Ferry Nuclear Plant, Unit 3, HPCI Turbine Steam Supply Valve 3-FCV-73-16 Failed to Open During Performance of an Operability Surveillance Instruction + (17:24:41, 5 January 2025)
- 05000296/LER-2077-012, For Browns Ferry Nuclear Plant, Unit 3, Problems with Offgas System Occurred Between July 7 and July 15, 1977 + (17:24:43, 5 January 2025)
- 05000296/LER-2077-011, For Browns Ferry Nuclear Plant, Unit 3, Smoke Detector in Spreading Room B Gave False Alarm Due to Increased Detector Sensitivity During Routine Startup Operation + (17:24:45, 5 January 2025)
- 05000296/LER-2077-014, For Browns Ferry Nuclear Plant, Unit 3, Unidentified Leakage Inside the Drywell Had Exceeded 5 Gpm During Routine Monitoring of Control Room Meters + (17:24:47, 5 January 2025)
- 05000296/LER-2077-013, For Browns Ferry Nuclear Plant, Unit 3, SLC Pump 3A Discharge Relief Valve Lifted at 1275 Psig During Surveillance Testing When Pump Was Started Against Throttled Test Valve Set at That Pressure + (17:24:50, 5 January 2025)
- 05000296/LER-2077-015, For Browns Ferry Nuclear Plant, Unit 3, HPCI Turbine Speed Controller Would Not Control Turbine During Surveillance Testing + (17:24:51, 5 January 2025)
- 05000296/LER-2077-016, For Browns Ferry Nuclear Plant, Unit 3, Torus Oxygen Sensor O2M-76-42 Failed to Operate Properly During Normal Operation + (17:24:56, 5 January 2025)
- 05000296/LER-2077-017, For Browns Ferry Nuclear Plant, Unit 3, Primary Containment Isolation Valve 3-FCV-77-2A on Drywell Floor Drain Sump Pump Discharge Line Would Not Operate as Required by Tech Spec 3.7.D.L During Routine Operability Checks + (17:24:58, 5 January 2025)
- 05000296/LER-2078-001, For Browns Ferry Nuclear Plant, Unit 3, Torus Oxygen Sensor O2M-76-42 Found to Be Erratic & Did Not Meet Requirements of Technical Specification 4.7.H During Normal Operation + (17:25:00, 5 January 2025)