Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000333/LER-1979-109-03, /03L-0:on 791213,during Instrument Surveillance Procedure F-ISP-27,suppression Chamber Temp Recorder 27-TR-102 Found Out of Calibr in Nonconservative Direction. Caused by Failed Printed Circuit Board + (01:08:21, 4 January 2025)
- ML19257B364 + (01:08:26, 4 January 2025)
- 05000321/LER-1979-100, Forwards Updated LER 79-100/03X-1 + (01:09:10, 4 January 2025)
- 05000333/LER-1979-110-03, /03L-0:on 791214,HPCI Sys Steam Supply Inboard Isolation Valve 23-MOV-15 Closed Due to Spurious Isolation Signal.No Cause Found.Isolation Signal Reset & Valve Reopened to Restore HPCI Sys to Operation + (01:09:55, 4 January 2025)
- 05000333/LER-1979-109, Forwards LER 79-109/03L-0 + (01:11:55, 4 January 2025)
- 05000321/LER-1979-106-03, /03L-0:on 791216,during Shutdown,Hpci Steam Supply Valves Closed at 116 Psig,Isolating HPCI & Violating Tech Specs.Cause Not Stated.Design Change Has Been Submitted to Change Setpoint of Pressure Switches + (01:12:33, 4 January 2025)
- ML19257B357 + (01:12:38, 4 January 2025)
- ML19257B356 + (01:12:40, 4 January 2025)
- ML19257B355 + (01:12:42, 4 January 2025)
- ML19257B354 + (01:12:44, 4 January 2025)
- ML19257B353 + (01:12:47, 4 January 2025)
- 05000321/LER-1979-106, Forwards LER 79-106/03L-0 + (01:13:09, 4 January 2025)
- ML19257B350 + (01:13:20, 4 January 2025)
- ML19257B349 + (01:13:21, 4 January 2025)
- ML19257B348 + (01:13:23, 4 January 2025)
- ML19257B347 + (01:13:25, 4 January 2025)
- ML19257B346 + (01:13:27, 4 January 2025)
- ML19257B345 + (01:13:28, 4 January 2025)
- ML19257B344 + (01:13:31, 4 January 2025)
- ML19257B343 + (01:13:34, 4 January 2025)
- 05000333/LER-1979-110, Forwards LER 79-110/03L-0 + (01:13:58, 4 January 2025)
- ML19257B340 + (01:15:01, 4 January 2025)
- ML19257B339 + (01:15:11, 4 January 2025)
- 05000346/LER-1979-131-03, /03L-0:on 791212,steam & Feedwater Rupture Control Sys Channel 4x15-volt Dc Power Supply PS-4 Failed.Caused by Overvoltage Trip Setpoint Actuating at Lower Value than Initial Adjustment.Installed New Power Supply + (01:15:54, 4 January 2025)
- ML19257B337 + (01:16:01, 4 January 2025)
- 05000368/LER-1979-098-03, /03L-0:on 791205,during Mode 1 Operation,Received Sensor Failure Alarms from Core C Protection Calculator. Caused Not Determined.Core Protection Calculator Program Reloaded & Sys Restored to Operation + (01:16:43, 4 January 2025)
- ML19257B335 + (01:16:48, 4 January 2025)
- ML19257B334 + (01:16:50, 4 January 2025)
- ML19257B333 + (01:16:52, 4 January 2025)
- 05000346/LER-1979-131, Forwards LER 79-131/03L-0 + (01:17:33, 4 January 2025)
- ML19257B330 + (01:17:37, 4 January 2025)
- 05000368/LER-1979-099-03, /03L-0:on 791205,during Mode 1 Operation,Outer Door of Emergency Personnel Airlock Found Partially Open.Caused by Mechanical Timing Being Out of Synchronization.Adjustments Made & Door Declared Operable + (01:18:10, 4 January 2025)
- ML19257B328 + (01:18:21, 4 January 2025)
- 05000267/LER-1979-060-03, /03L-0:on 791128,during Maint Shutdown,Found Bearing Water Pressure Differential Switches W/Setpoints Less Conservative than Tech Specs.Caused by Instrument Drift.Switches Readjusted + (01:18:26, 4 January 2025)
- ML19257B325 + (01:18:31, 4 January 2025)
- ML19257B324 + (01:18:33, 4 January 2025)
- ML19257B323 + (01:18:35, 4 January 2025)
- ML19257B322 + (01:18:37, 4 January 2025)
- ML19257B320 + (01:18:39, 4 January 2025)
- ML19257B319 + (01:18:41, 4 January 2025)
- ML19257B318 + (01:18:46, 4 January 2025)
- ML19257B316 + (01:18:52, 4 January 2025)
- ML19257B315 + (01:18:54, 4 January 2025)
- ML19257B314 + (01:18:57, 4 January 2025)
- ML19257B313 + (01:18:58, 4 January 2025)
- ML19257B310 + (01:19:01, 4 January 2025)
- ML19257B309 + (01:19:03, 4 January 2025)
- 05000346/LER-1979-129-03, /03L-0:on 791211,during Control Room Emergency Vent Sys 18-month Test ST 5076.02,charcoal Filter Bank in Unit 1-2 Failed to Meet Required Efficiency.Caused by Leak Between Filter Plate & Assembly.Plate Nuts Properly Torqued + (01:19:35, 4 January 2025)
- ML19257B307 + (01:19:39, 4 January 2025)
- ML19257B306 + (01:19:43, 4 January 2025)
- 05000344/LER-1979-016-03, /03L-0:on 791208,routine Insp Found Leaking Pipe in Primary Coolant Charging Sys Core Component Pot Mini Flow Lines.Caused by Crack Developing at Gauge Marks Left on Pipe Surface from Improperly Installed 2-inch Welded Pipe + (01:19:46, 4 January 2025)