Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ULNRC-05893, Callaway, Unit 1, Enclosure 13 to ULNRC-0589 - Drawing 8600-X-88133, Building Fill & Backfill Cross Sections, Power Block + (04:22:23, 28 July 2018)
- ML12191A398 + (07:21:53, 28 July 2018)
- ML12191A397 + (07:21:58, 28 July 2018)
- TAC:ME7126 + (11:07:35, 28 July 2018)
- TAC:ME7802 + (11:10:59, 28 July 2018)
- DCL-12-050, Diablo Canyon, Units 1 and 2, Attachment 16 to DCL-12-050, PGE-12-52 Np, Westinghouse Input to Diablo Canyon Digital Process Protection System Replacement Uncertainty Calculations Summary Lar. + (14:14:16, 28 July 2018)
- DCL-12-050, Diablo Canyon, Units 1 and 2, Attachment 4 to DCL-12-050, Scm 36-01, Rev. 0, Process Protection System (PPS) Replacement Software Configuration Management Plan (SCMP) Nuclear Safety Related. + (14:14:33, 28 July 2018)
- TAC:ME7583 + (14:59:22, 28 July 2018)
- TAC:ME7124 + (14:59:27, 28 July 2018)
- TAC:ME7123 + (15:08:21, 28 July 2018)
- TAC:ME8308 + (18:25:23, 28 July 2018)
- TAC:ME4969 + (18:59:11, 28 July 2018)
- TAC:ME7703 + (19:30:25, 28 July 2018)
- TAC:ME6974 + (20:23:40, 28 July 2018)
- TAC:MR6538 + (22:09:25, 28 July 2018)
- LR-N12-0124, Salem Generating Station, Units 1 and 2 - Attachment 1 to LR-N12-0124, Generic Letter 2004-02, Updated Supplemental Response for Salem Regarding Generic Letter 2004-02 + (01:20:46, 29 July 2018)
- DCL-12-041, 2011 Annual Radiological Environmental Operating Report. Part 4 of 5 + (02:24:13, 29 July 2018)
- DCL-12-041, 2011 Annual Radiological Environmental Operating Report. Part 3 of 5 + (02:26:54, 29 July 2018)
- DCL-12-041, 2011 Annual Radiological Environmental Operating Report. Part 2 of 5 + (02:27:52, 29 July 2018)
- DCL-12-041, 2011 Annual Radiological Environmental Operating Report. Part 5 of 5 + (02:28:37, 29 July 2018)
- TAC:ME7193 + (03:27:23, 29 July 2018)
- LR-N12-0121, Salem and Hope Creek - Radiological Environmental Monitoring Program, 2011 Annual Radiological Environmental Operating Report, January 1 to December 31, 2011 + (03:48:23, 29 July 2018)
- TAC:ME7303 + (04:21:36, 29 July 2018)
- TAC:ME5875 + (07:36:44, 29 July 2018)
- NL-12-032, NRC Pre-Filed Hearing Exhibit NRC000021 - Correction to Previous Response Regarding Unit 1 Buried Piping Indian Point Nuclear Generating Unit Nos. 1, 2 & 3 + (13:57:12, 29 July 2018)
- TAC:ME0004 + (02:41:48, 30 July 2018)
- TAC:ME7257 + (02:45:39, 30 July 2018)
- RS-12-023, WCAP-17330-NP, Rev. 1, H*: Resolution of NRC Technical Issue Regarding Tubesheet Bore Eccentricity (Model F/Model D5). + (04:07:23, 30 July 2018)
- L-2012-072, ANP-3067, Rev. 1, St. Lucie, Unit 1 EPU - Information to Support NRC Review of RCS Depressurization with Pressurizer Overfill + (09:23:43, 30 July 2018)
- ENS 53528 + (11:30:15, 30 July 2018)
- ENS 53529 + (11:30:18, 30 July 2018)
- ML12054A196 + (13:36:32, 30 July 2018)
- ML120540078 + (14:00:18, 30 July 2018)
- TAC:ME7236 + (14:22:55, 30 July 2018)
- TAC:ME5900 + (14:37:23, 30 July 2018)
- ML120480282 + (15:18:34, 30 July 2018)
- ML12045A396 + (16:52:35, 30 July 2018)
- ML12045A394 + (16:52:38, 30 July 2018)
- ML12045A393 + (16:52:39, 30 July 2018)
- ML12045A392 + (16:52:41, 30 July 2018)
- ML12045A391 + (16:52:42, 30 July 2018)
- ML12045A390 + (16:52:44, 30 July 2018)
- ML12045A389 + (16:52:46, 30 July 2018)
- ML12045A387 + (16:52:47, 30 July 2018)
- Anne Bingham + (18:05:45, 30 July 2018)
- ML12038A205 + (20:09:15, 30 July 2018)
- ML12038A203 + (20:09:25, 30 July 2018)
- TAC:ME6801 + (23:11:38, 30 July 2018)
- DCL-12-006, Diablo Canyon - Inservice Inspection Program Plan, Third 10-Year Inspection Interval, Revision 1, Drawing No. 102028, Sheet 39, Through Drawing No. 104628, Sheet 46 + (23:14:03, 30 July 2018)
- DCL-12-006, Diablo Canyon - Inservice Inspection Program Plan, Third 10-Year Inspection Interval, Revision 1, Page 201 Through Drawing No. 102028, Sheet 38 + (23:16:04, 30 July 2018)
- DCL-12-006, Diablo Canyon - Inservice Inspection Program Plan, Third 10-Year Inspection Interval, Revision 1, Page 101 Through Page 200 + (23:17:59, 30 July 2018)