Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TAC:07099 + (11:12:12, 3 January 2025)
- ML19270F432 + (11:12:13, 3 January 2025)
- ML19270F428 + (11:12:14, 3 January 2025)
- ML19270F411 + (11:12:15, 3 January 2025)
- ML19270F410 + (11:12:16, 3 January 2025)
- ML19270F409 + (11:12:16, 3 January 2025)
- ML19270F408 + (11:12:18, 3 January 2025)
- ML19270F406 + (11:12:19, 3 January 2025)
- ML19270F407 + (11:12:19, 3 January 2025)
- ML19270F405 + (11:12:20, 3 January 2025)
- ML19270F404 + (11:12:22, 3 January 2025)
- ML19270F403 + (11:12:23, 3 January 2025)
- NUREG-0022, Forwards Suppl 4 to SER (NUREG-75/054) Re Application for Const Permits + (11:12:27, 3 January 2025)
- ML19270F400 + (11:12:29, 3 January 2025)
- ML19270F398 + (11:12:30, 3 January 2025)
- ML19270F397 + (11:12:31, 3 January 2025)
- ML19270F396 + (11:12:32, 3 January 2025)
- ML19270F395 + (11:12:33, 3 January 2025)
- 05000321/LER-1979-004-03, /03L-0 on 790119:during Performance of Procedure HNP-1-3302,armature Winding of HPCI Injecting Valve Motor (E41-F006) Burned When Valve Was Opening.Minor Internal Disorder Probably Led to Overheat + (11:12:35, 3 January 2025)
- 05000321/LER-1979-004, Forwards LER 79-004/03L-0 + (11:12:36, 3 January 2025)
- ML19270F391 + (11:12:39, 3 January 2025)
- ML19270F389 + (11:12:40, 3 January 2025)
- ML19270F388 + (11:12:41, 3 January 2025)
- ML19270F387 + (11:12:42, 3 January 2025)
- 05000255/LER-1979-001-03, /03L-0 on 790102:reactor Protection Sys Power Range Channels NI05,06 & 07 Bypassed W/O First Tripping NI08.Caused by Failure to Use Administrative Controls + (11:12:44, 3 January 2025)
- 05000346/LER-1979-003-03, /03L-0 on 790104:control Room Emergency Ventilation Sys Damper HV5311E Inoperable.Caused by Leaking Pneumatic Operator.New Operator Installed.Damper Operated & Tested for Response Time & Declared Operable + (11:12:45, 3 January 2025)
- 05000346/LER-1979-003, Forwards LER 79-003/03L-0 + (11:12:47, 3 January 2025)
- 05000346/LER-1979-004-03, /03L-0 on 790105:failure to Post Guards at Entrance to Containment During Periods of Free Access. Caused by Personnel Error.Special Order 84 Revised to Require Posting of Guards + (11:12:49, 3 January 2025)
- ML19270F379 + (11:12:50, 3 January 2025)
- ML19270F378 + (11:12:50, 3 January 2025)
- 05000346/LER-1979-004, Forwards LER 79-004/03L-0 + (11:12:52, 3 January 2025)
- 05000333/LER-1979-002-03, /03L-0 on 790108:flow Biased Portion of Average Power Range Monitor B Inoperable.Caused by Operational Amplifier Failure.Circuit Board Replaced + (11:12:53, 3 January 2025)
- 05000285/LER-1978-005-03, /03L-1 on 780214:CH-1C Charging Pump Was Out for Maint on Leaking End Cap.Crack in Valve Block Noted.Pump Not Inoperable & Returned to Svc.Crack Due to Heavy Usage & Excessive Vibration.New Block Installed 790105 + (11:12:55, 3 January 2025)
- ML19270F372 + (11:12:56, 3 January 2025)
- 05000333/LER-1979-002, Forwards LER 79-002/03L-0 + (11:12:58, 3 January 2025)
- 05000285/LER-1978-005, Forwards LER 78-005/03L-1 + (11:12:59, 3 January 2025)
- 05000338/LER-1979-007-03, /03L-0 on 781116:during Normal Operation,Fire Door S54-5 Between Unit 1 Emergency Switchgear Room & Cable Vault Was Sprung & Would Not Make a Tight Seal,Evidently Due to Attempt to Free It While Stuck + (11:13:04, 3 January 2025)
- 05000344/LER-1978-029-03, /03L-0 on 781231:sensing Lines for Two Steam Pressure Transmitters Froze,Causing Pressure Transmitters to Fail High.Plant Will Be Modified to Provide Permanent Freeze Protection + (11:13:06, 3 January 2025)
- 05000338/LER-1979-004-03, /03L-0 on 790108:during 1-PT-36-1(A) Found That Steam Generator 3 Hi Hi Level Test Panel Was Faulty, Preventing Test of This Channel.Caused by Faulty Universal Logic Card on Test Panel + (11:13:08, 3 January 2025)
- 05000285/LER-1979-001-01, /01T-0 on 790118:during Check of Diesel Driven Fire Pump,Engine Cooling Fluid Boiled Out of Holding Tank. Diesel Engine Cooling Sys Refilled & Manual Isolation Valve Found Closed.Valve Opened & Fire Pump Returned to Svc + (11:13:10, 3 January 2025)
- 05000344/LER-1978-029, Forwards LER 78-029/03L-0 + (11:13:11, 3 January 2025)
- ML19270F357 + (11:13:13, 3 January 2025)
- ML19270F359 + (11:13:13, 3 January 2025)
- 05000285/LER-1979-001, Forwards LER 79-001/01T-0 + (11:13:15, 3 January 2025)
- ML19270F354 + (11:13:16, 3 January 2025)
- ML19270F353 + (11:13:17, 3 January 2025)
- 05000334/LER-1978-066-03, /03L-0 on 781230:neither Containment Sump Pump Would Operate,Due to Misadjusted Impeller & Bad Bearings.A Pump Readjusted & B Pump Relaced.Pumps Returned to Normal Svc + (11:13:18, 3 January 2025)
- ML19270F351 + (11:13:19, 3 January 2025)
- 05000293/LER-1979-001-03, /03L-0 on 790104:fuse in Power Supply for Reactor Bldg Vent Monitor Sample Pump Blew Three Times.Trip Investigated with No Apparent Cause Discovered.Pump Determined to Be Rotating Freely & Fuse Replaced + (11:13:21, 3 January 2025)
- 05000334/LER-1978-066, Forwards LER 78-066/03L-0 + (11:13:23, 3 January 2025)
- 05000293/LER-1979-001, Forwards LER 79-001/03L-0 + (11:13:24, 3 January 2025)