Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 10 CFR 50 Appendix B Criterion I, Organization + (00:04:23, 29 November 2017)
- 10 CFR 50 Appendix B Criterion IX, Control of Special Processes + (00:06:26, 29 November 2017)
- 10 CFR 50 Appendix B Criterion XI, Test Control + (00:07:30, 29 November 2017)
- Larry Smith + (15:09:10, 29 November 2017)
- Regulatory Assurance + (16:03:04, 29 November 2017)
- Bob Dickinson + (16:03:28, 29 November 2017)
- Jeff Goldman + (16:03:39, 29 November 2017)
- Kyle Garnish + (16:03:53, 29 November 2017)
- Brian Kremer + (16:04:07, 29 November 2017)
- Dustin Scurlock + (16:04:26, 29 November 2017)
- David Callen + (16:04:46, 29 November 2017)
- Dave Mannai + (16:29:53, 29 November 2017)
- Jason Jennings + (16:30:22, 29 November 2017)
- Chip Perkins + (16:31:06, 29 November 2017)
- 10 CFR 50.72(b)(3)(ii)(A), Seriously Degraded + (16:55:53, 29 November 2017)
- 10 CFR 50.72(b)(3)(v)(A), Loss of Safety Function - Shutdown the Reactor + (17:56:42, 29 November 2017)
- 10 CFR 50.72(b)(3)(v)(B), Loss of Safety Function - Remove Residual Heat + (17:57:03, 29 November 2017)
- 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material + (18:04:06, 29 November 2017)
- 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident + (18:04:21, 29 November 2017)
- 10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor + (18:06:08, 29 November 2017)
- 10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat + (18:06:23, 29 November 2017)
- 10 CFR 50.73(a)(2)(v)(C), Loss of Safety Function - Release of Radioactive Material + (18:06:38, 29 November 2017)
- 10 CFR 50.73(a)(2)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident + (18:06:52, 29 November 2017)
- 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition + (18:07:57, 29 November 2017)
- 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition + (18:08:51, 29 November 2017)
- 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown + (18:29:18, 29 November 2017)
- 10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown + (18:33:24, 29 November 2017)
- 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge + (18:34:38, 29 November 2017)
- Bill Cook + (20:58:26, 29 November 2017)
- ML17044A072, Closure Letter to Gunter, et al Re: 2.206 Petition on Containment Ventilation + (22:55:33, 29 November 2017)
- Property:CAC + (22:57:15, 29 November 2017)
- England + (16:12:45, 30 November 2017)
- 05000530/LER-2010-001 + (04:04:39, 1 December 2017)
- 05000530/LER-2001-001 + (04:05:05, 1 December 2017)
- 05000529/LER-2007-004 + (04:05:28, 1 December 2017)
- 05000529/LER-2002-002 + (04:05:58, 1 December 2017)
- 05000529/LER-2001-001 + (04:06:02, 1 December 2017)
- 05000528/LER-2016-003 + (04:06:03, 1 December 2017)
- 05000528/LER-2007-006 + (04:06:36, 1 December 2017)
- 05000528/LER-2001-003 + (04:07:26, 1 December 2017)
- 05000528/LER-2001-002 + (04:07:27, 1 December 2017)
- 05000499/LER-2001-004 + (04:13:07, 1 December 2017)
- 05000499/LER-2001-003 + (04:13:09, 1 December 2017)
- 05000499/LER-2001-002 + (04:13:10, 1 December 2017)
- 05000499/LER-2001-001 + (04:13:11, 1 December 2017)
- 05000498/LER-2001-002 + (04:13:56, 1 December 2017)
- 05000498/LER-2001-001 + (04:13:58, 1 December 2017)
- 05000483/LER-2002-003 + (04:15:27, 1 December 2017)
- 05000483/LER-2001-005 + (04:15:31, 1 December 2017)
- 05000483/LER-2001-003 + (04:15:32, 1 December 2017)
- 05000483/LER-2001-002 + (04:15:33, 1 December 2017)